Columbia County, GA · pop. 160K
Tue4Aug6:00 PM
Board of Commission
Tue Aug 4, 6:00 PM · 4 months ago
Board of Commissioners Meeting
Agendacolumbiacoga.api.civicclerk.comMinutescolumbiacoga.api.civicclerk.comRecording ▸YouTubeMeeting page ↗columbiacoga.portal.civicclerk.com
2 items on this agenda match the land-use topicsSubdivisions (1), Variances (1)
Agenda items (35)Show only the 2 matching
- 1.July 21, 2026
- 1.Community and Emergency Services Committee p. 1
- a.Service Agreement with Augusta Chapter, Daughters of the American Revolution - The Board of Commissioners requested to enter into a service agreement with the Augusta Chapter of the Daughters of the American Revolution in the amount of $6,000.00 to create a park and maintain the cemetery of Peter Crawford. He was a revolutionary war patriot and the first Clerk of Court in Columbia County, a position he held for about 40 years. Service Organization Allocations Fiscal Year 2027 July 1, 2026 - June 30, 2027 Total By Commissioner: Provided Duncan Melear Steed Carraway Couch Augusta Chapter, DAR $6,000 0 0 $3,000 $2,000 $1,000 p. 1
- b.Motorola P25 AIS 911 Recording System Agreement with Replay Systems, Inc. - The Columbia County Sheriff’s Office is requesting entering into agreement with Replay Systems, Inc. for the Motorola P25 911 Recording System for a 5 year term beginning on August 4, 2026 through August 4, 2031. Replay Systems, Inc. specializes exclusively in mission-critical recording, replay and quality assurance solutions for public safety environments. Replay Systems holds the Georgia State Contract for these services (Contract# GS-35F-513AA). The one-time cost for software licenses, hardware and implementation & configuration services is $190,308.31. The annual recurring cost (beginning on year 2) for ongoing platform updates, manufacturer technical support and software maintenance & support will be $22,702.12. This will also support our current (NiCE Inform) recording system for the required retention… p. 1
- c.Amendment to the Columbia County Events Sponsorship and Advertising Agreement - The current sponsorship contract template was originally developed for single-year agreements and is utilized for sponsorship sales supporting both Community Events and the Performing Arts Center. However, the majority of sponsorships at the Performing Arts Center are structured as multi-year agreements. The proposed revisions to the contract template will better accommodate multi-year sponsorship arrangements by improving clarity and strengthening contractual protections. p. 1
- d.CSRA Mustang Club Agreement for the Mustang Club of America National Show - The Mustang Club of America and CSRA Mustang and Ford Club, with Columbia County partnership, have been selected to host the 2028 National Show, to be held in Columbia County April 21-23, 2028. This event will bring 350-400 mustang show-cars and 700-800 out-of-town visitors. The Plaza area will be used for the car show and the Performing Arts Center and Support Facility will be used for evening functions associated with the event, which will be promoted as "Mustangs in the Market." The event will generate a significant amount of room nights for Columbia County hotels. p. 1
- e.The Purchase of (40) Scott XD Self-Contained Breathing Apparatus (SCBA) and (30) additional cylinders from American Safety and Firehouse - Fire Services Division requests to purchase (40) Scott XD Self-Contained Breathing Apparatus and (30) additional cylinders from American Safety and Firehouse for $378,463.70. Fire Services maintains an annual replacement rotation of self-contained breathing apparatus. In order to maintain fleet uniformity and maintenance certifications, Scott SCBAs are used countywide. Scott only has two authorized dealers permitted to sell in the State of Georgia: Municipal Equipment Services and American Safety & Firehouse. American Safety & Firehouse was the lowest bidder quote. This item is a budgeted item. p. 1
- f.The Purchase of ProtectIR and XplorIR Bundles from 908 Devices for the Hazardous Materials Response Team - Fire Services Division requests to purchase ProtectIR and XplorIR bundle from 908 devices for $128,355.50. Fire Services Hazardous Materials Response Team responds to all types of hazardous materials emergencies and assists other agencies. The ProtectIR for solid and liquid and the XplorIR handheld gas and vapor detector bundle can accurately detect and identify unknown chemical threats in seconds. 908 Devices is a sole source provider. This item is a budgeted item. p. 1
- g.Masters Services Agreement with RapidSOS, Inc. for IAmResponding Software - IAmResponding is a software-as-a-service solution to support public safety staffing, teams and volunteers. This service provides communication and incident information to various emergency teams such as Dive Rescue, Swift Water, and Hazardous Materials teams. The service agreement is for a term of 1 year with 4 additional renewals at a budgeted price of $889.10 each year. p. 1
- h.Independent Contractor Agreement with Telemedicine Group for the HeartStart+ Cardiovascular & Metabolic Screening - To support cardiovascular health for firefighters, Columbia County provides annual cardiovascular screening for any Fire Rescue employee that wishes to participate. Cardiovascular disease is one of the leading killers of firefighters and Columbia County promotes heart health support for our employees. This is a one year agreement with 4 additional renewal periods. This service is actually performed under MedNow and will be billed through MedNow as a part of our total health package. The maximum budget for the HeartStart+ program is $80,000. The employee participation rate is about 30%. The cardiovascular and metabolic screening is funded from the Fire Rescue EMS budget. p. 1
- 2.Public Works and Engineering Services Committee p. 1
- a.The Purchase of a New Mobile Generator for Fleet Services from Nixon Power Services - This item is for the purchase of a mobile generator for Fleet Services. Fleet Services oversees the maintenance for backup generators on County facilities and does not currently have a way to ensure we are prepared should we have a failure at any of these locations. This mobile unit will allow staff to bypass the failed stationary generator when the need arises. The generator will be purchased from the Sourcewell Cooperative Agreement (Contract #092222-KOH). p. 1
- b.Award Bid # 2026021-BID3289 and Contract to Coleman Construction, Inc. for the Construction of the Columbia County Emergency Back-up Generators - This item is for the construction and installation of (3) emergency backup generators. The Exhibition Center will receive a new, full facility back-up generator. The facility has never had a generator and will allow for the space to be used in various ways if there is a loss of power. Fire Rescue Station 16 and Building C will receive replacement generators. The Station 16 generator has a failing engine and control board. The Building C generator is original to the building. This generator has had many issues and due to the age and critical nature of this generator, a replacement is warranted. Bids were received for this project on July 16th, 2026, with Coleman Construction being the lowest qualified bidder with a base bid of $1,245,931.00. p. 2
- c.Emergency Purchase from Augusta Chiller Services Inc. for the Boiler Replacement at Patriots Park Gym - This item is for an emergency purchase for the Patriots Park Gym. The boiler that is original to the building has undergone several repairs in the last few years. Staff reached out to Augusta Chiller after the unit began to fail, and it was determined that the unit was no longer safe to operate and a fire hazard. Therefore, staff proceeded with having Augusta Chiller order and install the replacement for us immediately. p. 2
- d.Award Bid # 2026020-BID3289 and Contract to Duckworth Development for the Renovation of Building G1 - Department of Revenue - This item is for the renovation construction contract for the first floor of Building G-1 for Georgia Department of Revenue. The DOR currently leases both floors in Building G-1 and is downsizing to occupy only the 1st floor. Staff and Consultants worked with the State Properties Commission and Georgia Department of Revenue to ensure all requirements were included in this project. Bids were received on July 16th, 2026 for the renovation of Building G1 — Department of Revenue. Duckworth Development was the lowest qualified bidder with a base bid of $529,210.00. p. 2
- e.Southern Flow Nozomi Yearly License Renewal 2026 - We are renewing our Nozomi Networks software subscription to ensure continued access to OT network visibility, monitoring, and threat detection. This renewal maintains our ability to detect, analyze, and respond to security risks in real time, while receiving ongoing updates, feature enhancements, and technical support. The contract extension ensures uninterrupted protection of our critical infrastructure and compliance with security best practices. This is a budgeted item paid out of the Water Utility general operating fund line code 511-5105-533035. The cost for this renewal is $41,412.00.
- f.Independent Contractor Agreement with Bluewater Engineering Services, LLC. for the Sawdust Rd to Old Louisville Rd 12" Waterline Project E&S Inspections and Monitoring - Independent Contractor Agreement with Bluewater Engineering Services to provide professional environmental services for the Sawdust Road Waterline Project. The proposed scope of services includes conducting erosion control inspection and turbidity sampling for a proposed 12-inch waterline installation starting in the vicinity of Sawdust Road extending to Old Louisville Road in Harlem, GA. The site is approximately 14.3 acres in size. The total estimated cost is $15,000 and will be paid out of bond project # 58037-39-015-685. p. 2
- g.A Purchase from Gerald Jones Ford for a Half Ton Four-Wheel Truck to Replace Shop Number 2201 - Approval is requested to replace shop vehicle #2201 (2019 Ford F-150) due to a catastrophic transmission failure. Given the vehicle's age, mileage, and the cost of repairs, replacing the vehicle is the most cost-effective and operationally sound option. The quote is $46,613.06, but staff is requesting $55,000 which will cover any upfit cost. p. 2
- h.Adding a Cell Phone Allowance to Position Numbers 91 Manager II NE and 1616 Manager II NE - To support the operational needs and communication responsibilities of the Manager II roles assigned to Position Numbers 91 and 1616, we request approval to add a Cell Phone Allowance of $720.00 per year for each position. These roles require frequent coordination with internal teams, external partners, and on‑call availability that cannot be adequately met without a mobile device. The allowance will ensure both positions can reliably perform essential job functions and maintain accessibility as needed. The yearly total of $1,440 will affect line item 511-5100-511060. p. 2
- i.Water Utility Pump Maintenance Agreement with Goforth Williamson Inc. - This request is for approval of a Water Utility Pump Maintenance agreement. The Columbia County accepted sealed proposals from qualified firms to ascertain a vendor to perform maintenance on both raw water and drinking water pumps in the Columbia County Water Utility (CCWU) system. CCWU utilizes vertical turbine pumps for raw water from the Savannah River and Clarks Hill Lake. CCWU utilizes vertical turbine pumps and horizontal split case pumps for finished water pumping. The selected firm for pump maintenance is Goforth Williamson. The anticipated FY27 cost for pump maintenance is $400,000.00 and will be charged to line item 511-5105-533064. p. 2
- j.Emergency Chemical Spill Cleanup by Clean Harbors Environmental Services, Inc - This item is an emergency chemical spill cleanup due to a ruptured tank no longer able to safely contain the hydrogen peroxide. We had to employ Clean Harbors Environmental Services to remove and dispose of Hydrogen Peroxide leaking from a ruptured tank. It was necessary to remove and dispose of Hydrogen Peroxide before we could replace the tank. This was not a budgeted item and will be paid for about of water utility contingency funds 511-5000-544007 for $237,638.85. p. 2
- k.…lanes (LTL) and right turn lanes(RTL) shall be provided into each subdivision street or project driveway that accesses a Collector or Arterial if the Average Daily Traffic (ADT) on the Collector or Arterial and the number of turning vehicles during or after construction meet or exceed the amounts shown in Table 1 or 2, as applicable. The County may require the addition of a LTL or RTL, even when the conditions in Table 1 or 2 are not met, if roadway geometry or field conditions indicate that the safety of the traveling public would be improved. The County may also waive or alter a turn lane requirement if field conditions or other factors indicate that it is in the best interest of the County to do so. Any recommendation to add or waive a turn lane shall be reviewed for approval by the County Engineer and documented in the project file. Staff is also proposing a few minor inconsequential
- l.Designation of the Stormwater Compliance Department Manager as a US EPA Signatory Authority & Alternative Designated Representative - Location - Baker Place Rd Municipal Solid Waste Landfill Request - Approve the Designation of the Stormwater Compliance Department Manager as a US EPA Signatory Authority & Alternative Designated Representative. History - The US EPA has signatory requirements for Stormwater Sampling and Methane Monitoring reports associated with the Baker Place Rd Landfill. These requirements dictate that the ranking elected official (Chairman of the Board) or their duly authorized representative(s) may sign and submit the permit reports required for the landfill. To maintain reporting schedules and efficiency of permit oversight, staff is requesting the Stormwater Compliance Department Manager also be designated as a US EPA Signatory Authority & Alternative Designated… p. 2
- m.Change Order Number 1 to Contract #2026-3469 with Cajenn Construction & Rehabilitation Services for the 2026 Storm Water UV Lining Projects - Location - 308 Timberidge Dr & 108 Morehead Dr Request - Approve Change Order #1 to Contract #2026-3469 with Cajenn Construction & Rehabilitation Services for the 2026 Storm Water UV Lining Projects, increasing the contract amount from $95,659.00 to $120,250.00 to cover unforeseen material changes. History - The original contract amount was for UV lining approximately 298 linear feet of 30" CMP. The contract also included unit pricing for UV-lining 18", 24", 36", and 42" sized pipes in the event they were determined to be needed. Once construction began, the contractor determined that the pipes to be lined were 36" instead of 30". The work was completed at the contract rate for the 36" pipes, which resulted in a contract overrun of $24,591.00.… p. 2
- n.Contract #2026-3610 with Southern Civil Solutions for Engineering Services Related to the Ridge Crossing Storm Drain UV Lining Rehabilitation Project - Location – Ridge Crossing Sections 1, 2, & 3 Request – Approve Contract #2026-3610 with Southern Civil Solutions for Engineering Services Related to the Ridge Crossing Storm Drain UV Lining Rehabilitation Project in the amount of $15,000.00. History – During routine inspections, Stormwater Operations identified heavy corrosion of the existing storm drain systems within Ridge Crossing. Staff issued a Request for Proposals (RFP) to various engineering firms to prepare construction documents needed for UV lining approximately 3,869 linear feet of the storm drainage system. Southern Civil Solutions was the lowest and most responsive respondent. Bluewater Engineering - $20,750.00 Benesch Engineer - No bid Funding – Stormwater Utility Fund -… p. 2
- o.Supplemental Agreement Number 1 to the Project Framework Agreement with GDOT for the Washington Rd Widening Project, PI# 0021250 - Location - Washington Rd (SR104) from William Few Pkwy to Tubman Rd Request - Approve Supplemental Agreement No. 1 to the Project Framework Agreement (PFA) with GDOT for the Washington Rd Widening Project, PI# 0021250 History - The PFA history with GDOT for the Washington Rd Widening Project, PI# 0021250 is as follows: 04/21/26 - BOC approved the original PFA in the amount of $2,538,900.00 for the Preliminary Engineering (PE) Phase If approved, Supplemental Agreement No. 1 will increase the PFA amount by $1,250,000.00 to a total of $3,788,900.00. Funding - N/A. The PFA is the mechanism for reimbursement of federal dollars; whereas, the County pays 100% of the costs for services upfront and is reimbursed 80% of those costs with Federal (Y230) funds. Timeline… p. 2
- p.Acceptance of Easements and Associated Stormwater Infrastructure from Tillery Park Homeowners Association, Inc - Location – off Balfour Drive; Tillery Park Ph. III-A; Parcel 051A 253 Request – Acceptance of Easements and Associated Stormwater Infrastructure from Tillery Park Homeowners Association, Inc. as shown on the plat from H&C Surveying, Inc., dated June 2, 2026. History – Tillery Park Homeowners Association, Inc submitted an Easement Plat for the dedication of two (2) permanent utility easements, to include associated storm sewer infrastructure, located off Balfour Drive inside Tillery Park Ph. III-A subdivision: Permanent Utility Easements “1”, containing 339 Sq Ft. or 0.01 ac. Permanent Utility Easements “2”, containing 5,169 Sq Ft. or 0.12 ac. Per the deed, the developer shall warranty all materials and workmanship for one year from the date of final acceptance by the Board of … p. 2
- q.Acceptance of Easements and Associated Water & Sanitary Utility Infrastructure from Edgar Hughston Builders, Inc. - Location – Hamilton Road - Hamilton Grove Subdivision Phase 1 Request – Acceptance of Easements and Associated Water & Sanitary Utility Infrastructure from Edgar Hughston Builders, Inc. as shown on the plat from James G. Swift and Associates, dated May 25, 2026, known as Hamilton Grove Subdivision Phase 1. History – Edgar Hughston Builders, Inc submitted an Easement Plat for the dedication of a permanent utility easement, to include associated water and sanitary sewer infrastructure, located off Hamilton Rd for Hamilton Grove Ph. I subdivision: Permanent Utility Easement “A” containing 23,107 Sq Ft. or 0.53 ac. Per the deed, the developer shall warranty all materials and workmanship for one year from the date of final acceptance by the Board of Commissioners; however,… p. 2
- 1.New Business
- a.Development and Planning Services Committee p. 2
- 1.VA26-07-02, Variance to Section 90-53 List of lot and Structure Requirements , 228 Applecross Drive, Tax Map 083 Parcel 046, 0.7 +/- acres, and currently zoned A-R (Apartment Residential) and Easement Encroachment Agreement. - See attached Staff Report- VA26-07-02 Planning Commission Date: July 16th , 2026 p. 2
- 2.Items Added at the Meeting p. 2
- 1.Jeffrey Holder, Cambrey Wood, Lee Muns and Blane Carter p. 3
- 1.Property
- a.Vickie Dye parcel 042 211 for additional permanent easement for the Euchee Creek Interceptor project - Purchase of additional permanent easement for the Euchee Creek Interceptor project. The original easement was approved by the Board on October 3, 2023. Parcel Name Permanent Temporary Cost 042 211 Vickie Dye 0.208 $1,850.00 p. 3