Columbia County, GA · pop. 160K
Tue16Jun6:00 PM
Board of Commission
Tue Jun 16, 6:00 PM · 5 months ago
Board of Commissioners Meeting
Agendacolumbiacoga.api.civicclerk.comMinutescolumbiacoga.api.civicclerk.comRecording ▸YouTubeMeeting page ↗columbiacoga.portal.civicclerk.com
1 item on this agenda matches the land-use topicsSubdivisions (1)
Agenda items (38)Show only the 1 matching
- 1.June 02, 2026
- 1.Management and Internal Services Committee p. 1
- a.Administrative Services Agreement with Mission Square Retirement - Columbia County’s retirement plan provider, Mission Square, is offering a 5-year agreement to lower basis points (a basis point equals 1/100 th of a percent) on identified Mission Square Funds on the 401a and 457b plans. Reducing the basis points will bring the net average expense ratio for both plans down to about 41 basis points, which results in approximately a 10% decrease or $88,000 per year over the 5-year term. p. 1
- b.Columbia County Community Connections Provisions of Service Agreement for Fiscal Year 2027 - Columbia County Community Connections (CCCC) is a non-profit corporation that provides services to the residents of Columbia County, including summer work programs for youth, after-school programs for elementary, middle, and high school youth, a weekend feeding program for children, a senior citizens supplemental food program and a drug-free coalition. CCCC is funded by a number of grants. The grants reimburse CCCC for their expenses, which typically average around $83,000 per month. Columbia County provides an advancement of funds as a loan to be used for the sole purpose of covering its operating expenses until the grant reimbursements are received. The loan amount for the term of this agreement is $201,000. The CCCC shall pay a fee of $9,000 for the use of the funds during this period. The… p. 1
- c.FY 2026/2027 ACCG Property and Liability Insurance Renewal - Attached is the Renewal Contribution Worksheet for property and liability coverage with ACCG-IRMA for the period July 1, 2026, through June 30, 2027. The renewal contribution is based on maintaining the same coverage limits as the current fiscal year. Highlights of the renewal include: Columbia County’s FY 2027 net contribution increased by 21.46% from the FY 2026 net contribution of $1,149,494, with 4% attributed to an ACCG overall rate increase to cover expected costs and 17.46% due to increased exposures (payroll, property and vehicles). Social and political environment with increased auto and law enforcement liability claims. Historic global increases for property reinsurance caused by catastrophic property claims. All requirements were met to receive the safety discount credit of $66,398. ACCG-IRMA Renewal Contribution…
- d.Revision of the Comprehensive Policy Manual Number 603.1 Procurement - The Comprehensive Policy Manual is continually reviewed to maintain the integrity of the information and to ensure the policies are current and valid. Section III of Policy Number 603.1 Procurement, has been revised as shown in the attached policy to clarify when purchases require approval by the Board of Commissioners. The attached policy was reviewed by the Administration and the recommended revision is submitted for consideration and approval by the Committee and the Board of Commissioners. p. 1
- e.Uniform Rental Services Agreement with Cintas Corporation - The County entered into an agreement beginning on April 20, 2021 for an initial term of one year with four 1-year options to renew, with Cintas Corporation for our County-wide uniform rental services. The County exercised all four possible renewal options, terminating the agreement on June 30, 2026. This agreement allowed for an initial average cost of $7.17 per employee per week. Renewal 1 allowed for a 3% increase ($7.39) and Renewal 2, a 2% increase ($7.54). There were no increases for Renewal 3 & 4. Cintas Corporation has proposed, and Procurement is requesting to enter into a new agreement, based on Omnia pricing, on July 1, 2026, and terminate on June 30, 2027, with the option to renew this agreement for four additional 1-year terms. These renewals may be canceled by the County at any time prior to the beginning of the…
- f.Tyler Munis 2026-2027 Authorization of Payment - Tyler Technologies is the provider of Columbia County’s Munis Enterprise Resource Planning (ERP) system, which manages the county’s financial, human resources, and payroll activities. In March 2024, the Commission approved the adoption of Tyler’s Software-as-a-Service (SAAS) Munis product. The annual payment to Tyler provides support and licensing for all Tyler ERP (Enterprise Resource Planning) Products used by the county. This agenda item is requesting authorization for the IT Department to proceed with the payment for the 2026-2027 hosting, licensing, and support fees, pending approval of the budget by the commission in June 2026. No payment will take place until 1) the commission approves the budget and 2) the new fiscal year begins. The cost for Tyler’s services in 2026-2027 is $596,782.78. These fees will be paid from IT’s Operating …
- g.Agreement Renewal Number Four with A3 Communications for Genetec Video Management System Support - Columbia County has been using A3 for support of the Genetec Video Management System (VMS) since 2021, when A3 was selected to be one of two providers of Genetec-related services for the county. Information Technology worked with the Procurement Department to release Request for Qualifications #20201030-RFQ1005 for qualified Genetec integrators, and A3 was selected as the Primary Integrator, which is the firm that is responsible for working with the county in regard to its Genetec licensing. The original agreement with A3 was approved by the commission on September 21, 2021, and has reached the end of its original contract period. Staff recommends renewing their services for the time period from July 1, 2026 through June 30, 2027. This will be the 4th of four possible renewals of the… p. 1
- h.Agreement Renewal Number Two with Structure Media Solutions (SMS) for Cabling Services - The Columbia County Information Technology Department regularly has a need for qualified vendors to provide cabling services for County projects. Cabling refers to the cable/wiring environment, which includes installation, replacement, and testing of cabling and wiring for voice and data communications, installation of conduit, racks, patch panels, and other hardware, as well as the knowledge of the applicable standards for this technology. In 2023, IT worked with the Procurement Department to release RFQ# 2023028-RFQ1005 for New Construction Cabling Services. SMS was one of three vendors selected that is capable of providing cabling services to the County. The agreement with SMS is for one year, with an initial term from May 21, 2024 through June 30, 2025, with up to four renewals. It is… p. 1
- i.Agreement Renewal Number Two with Wired Communications for Cabling Services - The Columbia County Information Technology Department regularly has a need for qualified vendors to provide cabling services for County projects. Cabling refers to the cable/wiring environment, which includes installation, replacement, and testing of cabling and wiring for voice and data communications, installation of conduit, racks, patch panels, and other hardware, as well as the knowledge of the applicable standards for this technology. In 2023, IT worked with the Procurement Department to release RFQ# 2023028-RFQ1005 for New Construction Cabling Services. Wired Communications was one of three vendors selected that is capable of providing cabling services to the County. The agreement with Wired Communications Group is for one year, with an initial term from May 21, 2024 through June 30, 2025, with up to… p. 1
- j.Agreement Renewal Number One with Risk Strategy Group (RSG) for Physical Security Assessment Services - As part of Columbia County’s Information Security Program, the Technology Services Division has the occasional need to employ a company to conduct a physical security assessment of county technical resources. As part of the GEMA State and Local Cybersecurity Grant Program (SLCGP), the County employed Risk Strategy Group to perform a physical security assessment of various county locations that house technology infrastructure. The agreement with RSG is for one year, with an initial term from July 15, 2025 – June 30, 2026, with up to four renewals. It is recommended by the staff to renew this agreement for the time period from July 1, 2026 through June 30, 2027. This renewal is the 1st of the four renewals. There is no fixed cost to this agenda item. The vendor may be called upon to… p. 1
- k.Agreement Renewal Number One with DSI Tech (DISYS) for Cisco Equipment and Services - In 2024, Columbia County released RFP# 2024010-RFP1005 for Cisco Equipment & Services. The purpose of the RFP was to enter into a contract with a qualified and experienced Cisco partner for professional services for various Cisco Systems equipment, implementation projects, maintenance, support, and upgrades. DISYS was the selected bidder. The agreement with DSI included an initial term from September 17, 2024 through June 30, 2026, with up to four renewals. It is recommended by the staff to renew this agreement for the time period from July 1, 2026 through June 30, 2027. This renewal is the 1st of the four renewals. There is no fixed cost to this agenda item. The vendor may be called upon to provide quotes for various jobs within the county in which cabling is involved. These engagements would be paid… p. 2
- l.Agreement Renewal Number Four with NetPlanner Systems, Inc. for Genetec Video Management System Support - Columbia County has been using NetPlanner for support of the Genetec Video Management System (VMS) since 2021, when NetPlanner was selected to be one of two providers of Genetec-related services for the county. Information Technology worked with the Procurement Department to release Request for Qualifications #20201030-RFQ1005 for qualified Genetec integrators, and NetPlanner was selected as the secondary integrator. The original agreement with NetPlanner was approved by the commission on September 21, 2021, and has reached the end of its original contract period. Staff recommends renewing their services for the time period from July 1, 2026 through June 30, 2027. This will be the 4th of four possible renewals of the agreement. There is no fixed cost to this agenda item. NetPlanner… p. 2
- m.Agreement Renewal Number Two with Aios Group for Construction Cabling Services - The Columbia County Information Technology Department regularly has a need for qualified vendors to provide cabling services for County projects. Cabling refers to the cable/wiring environment, which includes installation, replacement, and testing of cabling and wiring for voice and data communications, installation of conduit, racks, patch panels, and other hardware, as well as the knowledge of the applicable standards for this technology. In 2023, IT worked with the Procurement Department to release RFQ# 2023028-RFQ1005 for New Construction Cabling Services. AiOS Group was one of three vendors selected that is capable of providing cabling services to the County. The agreement with AiOS Group is for one year, with an initial term from May 21, 2024 through June 30, 2025, with up to four renewals. It is… p. 2
- n.Agreement Renewal Number Three with Conference Technologies International (CTI) - Conference Technologies International (CTI) was approved by the county commission on October 18, 2022 to provide equipment and services related to audio-visual systems in courtrooms in the Justice Center. The equipment is in use for court sessions and hearings and is being supported by CTI. The original agreement with CTI was for a two-year contract terminating on June 30, 2024, with up to three one-year renewals. To continue maintenance and support of the system, it is recommended by staff to renew CTI’s services for the time period from July 1, 2026 through June 30, 2027. This renewal is the second of three additional one-year terms. Annual operating costs for system support and maintenance, which are expected to be approximately $18,000 per year, will be funded through the Information Technology… p. 2
- o.Agreement Renewal Number Two with Harpe Engineering for Technology Consulting and Services - The Columbia County IT Department desires to renew the county’s agreement with Harpe Engineering Solutions, Inc. to provide various professional services related to the support of county networks and systems. Harpe has knowledge and skill sets in multiple areas of technology that are of interest to the county technology staff, and highly-qualified personnel with experience supporting various levels of government operations. This agreement is for ad-hoc services, so there is no immediate outlay of county funds tied to this agreement. Harpe will be engaged on an as-needed basis through individual scopes of work to provide technical support and conduct projects that address county needs. The agreement with Harpe Engineering was for one year, with an initial term from October 17, 2023 through June… p. 2
- p.…parcel mapping tasks related to splits, merges, new subdivisions, etc. Mr. Daniel receives parcel change information from the Tax Assessor’s Office, which he then adds into the GIS parcel layer. The resulting layer is transmitted back to the County for inclusion in our parcel geodatabase layer. The original agreement with Fred Daniel Mapping Services was for a two-year contract terminating on June 30, 2021 with up to four one-year renewals. The agreement and the renewals have concluded but, based on the company’s performance since their services were implemented and the specialized methods that have been cooperatively developed to satisfy our mapping needs, it is recommended to renew their services for the time period from July 1, 2026 through June 30, 2027. This will be a one-year renewal. The cost of these services is budgeted through GIS Department’s operating budget. The budgeted… p. 2
- q.Contract Renewal Number Two with Total Outdoor Plant Solutions (TOPS) - The Broadband Utility (C3BU) contracts with an outside provider for fiber construction, maintenance, and restoration services. Fiber construction and maintenance services consist of installing new infrastructure, relocating existing infrastructure, and maintaining fiber optic infrastructure as needed. The emergency restoration service includes restoring damaged fiber infrastructure 24 hours per day, 7 days per week, and 365 days per year. C3BU worked with the Procurement Department to release RFP# 2023025-RFP5510 for Fiber Construction, Maintenance and Restoration Services. Total Outdoor Plant Solutions (TOPS) was selected to provide these services to C3BU. The original agreement commenced on April 2, 2024 and terminated on June 30, 2025, with four possible one-year renewals. Staff recommends renewing their services … p. 2
- r.Contract with ElectriCom LLC Inc. for Fiber Construction, Maintenance and Restoration - The Broadband Utility (C3BU) contracts with an outside provider for fiber construction, maintenance, and restoration services. Fiber construction and maintenance services consist of installing new infrastructure, relocating existing infrastructure, and maintaining fiber optic infrastructure as needed. The emergency restoration service includes restoring damaged fiber infrastructure 24 hours per day, 7 days per week, and 365 days per year. C3BU worked with the Procurement Department to release RFP# 2026016-RFP5500. Five proposals were received and evaluated by representatives from Broadband Utility. After evaluation of all proposals, ElectriCom, LLC received the highest score. Procurement recommends awarding the contract to ElectriCom, LLC Inc. for a one-year term with the option to renew for four (4) … p. 2
- s.Upgrade of Trimble Unity Maintain (Cityworks) to Unlimited Licensing - Trimble currently provides Columbia County’s Asset Management System, Trimble Unity Maintain (formerly known as Cityworks). This software supports the management of county assets and a comprehensive work order system. Columbia County is in the process of migrating the Maintain solution to a cloud-based platform. Following Hurricane Helene, staff expanded its use of Maintain in response to the need for enhanced detailed tracking of service requests, work orders, and maintenance activities. The software provides the means to include photo, video, maintenance records, etc. for county assets, so it plays an important part in day-to-day asset management as well as emergency response. More personnel are now using the product, and it is recommended that the county upgrade to an unlimited license of the product to ensure… p. 2
- t.Contract Renewal Number 4 and Change Order Number 2 with Coastal Waste & Recycling of Georgia LLC for Refuse Services - This item represents the fourth and final renewal term of the contract with Coastal Waste and Recycling of Georgia, LLC for refuse services for an additional twelve (12) months from July 1, 2026, to June 30, 2027. This item also includes a change order for a 5% increase for services based on rising business costs such as fuel, etc. This is the first increase requested since 2023, which was solely due to an increase in Richmond County's dump fees. The 5% increase will correlate to approximately $5,863.00. This contract is billed monthly based on services provided. Therefore, it does not have a set dollar amount, but is budgeted at $117,247.68 plus the 5% should it be approved. This amount is budgeted across multiple departments within the county from multiple funding… p. 2
- u.Independent Contract with Penn Roofing Inc. for the Reroofing of the Columbia County Health Department - This item is for the independent contractor agreement with Penn Roofing, Inc. for the re-roofing of the Columbia County Health Department. Four quotes were received, with Penn Roofing being the lowest qualified at $71,763.00. This facility continues to have ongoing issues with roof leaks and has become increasingly difficult to properly repair. p. 2
- 2.Development and Planning Services Committee p. 2
- a.Supplemental Agreement No. 2 to the Project Framework Agreement with GDOT for the Wrightsboro Rd Widening Project, PI# 0008348 - Location - Wrightsboro Rd from Horizon South Pkwy to Jimmie Dyess Pkwy Request - Approve Supplemental Agreement No. 2 to the Project Framework Agreement (PFA) with GDOT for the Wrightsboro Rd Widening Project, PI# 0008348 History - The PFA history with GDOT for the Wrightsboro Rd Widening Project, PI# 0008348 is as follows: February 2025 - BOC approved the original PFA in the amount of $2,815,000 for the Preliminary Engineering (PE) Phase May 2026 - BOC approved PFA Supplemental Agreement No. 1 in the amount $49,000.00 for Geotechnical Engineering April 2026 - MPO authorized an additional $1,250,000 for the remaining PE task orders If approved, Supplemental Agreement No. 2 will increase the PFA amount by $1,250,000 to a total of $4,114,000.00. Funding - N/A.… p. 2
- b.Amendment No. 1 to Contract 2025-3215 with Alfred Benesch & Company for Wrightsboro Rd Widening Project, PI# 0008348 - Location - Wrightsboro Rd from Horizon South Pkwy to Jimmie Dyess Pkwy Request - Approve Amendment No. 1 to Contract 2025-3215 with Alfred Benesch & Company (Benesch) for Wrightsboro Rd Widening Project, PI# 0008348, to increase the budget $1,245,496.00 for a total, not-to-exceed budget of $4,060,496.00. History - Contract 2025-3215 history with Benesch for the Wrightsboro Rd Widening Project, PI#0008348 is as follows: May 2025 - BOC approved contract with a not-to-exceed amount of $2,815,000.00 May 2025 - Staff authorized Task Order No.1 in the amount of $25,000.00 June 2025 - Staff authorized Task Order No.2 in the amount of $1,080,296.00 Staff has negotiated with Benesch on the next two (2) Task Orders to complete the right-of-way phase and final design. Task Order… p. 2
- c.Purchase of a PPV Tahoe from Alan Jay for the Sheriff's Office - The Sheriff's Office reached out to Fleet Services in need of a Police Package Tahoe for Captain Trip Penn, who has recently been promoted to Patrol Captain. Fleet reached out to vendors for quotes, including the Sourcewell contract holder, Alan Jay Fleet Sales. p. 2
- d.Alcoholic Beverage License Laxmi 31 LLC dba Gas World #31 - Laxmi 31 LLC dba Gas World #31 applied for an alcoholic beverage license to sell beer and wine for off premise consumption at 6602 Washington Road. Deep Patel, applicant, provided all required information. A notice was posted on the property May 14, 2026. There is no known opposition to the license. A distance survey is not required. Columbia County Code Section 6-52(c) provides an exemption to meeting the distance requirements "if the cessation of the operation of the establishment is for one year or less." Pair of Jacks Inc is currently licensed.
- e.Alcoholic Beverage License Jones Creek Golf Course LLC - Jones Creek Golf Course LLC applied for an alcoholic beverage license to sell beer, wine, and distilled spirits for on premise consumption at 4087 Hammonds Ferry. Andrew Brooks, applicant, provided all required information. A notice was posted on the property May 21, 2026. There is no known opposition to the license.
- f.Easement Encroachment Agreement Tax Map 060 Parcel 2097 - The applicant, Carlos Melendez Reyes, is requesting an easement encroachment agreement for the construction of the pool decking to be built inside a 10’ rear drainage and utility easement as shown on the plot plan submitted by EMC Engineering dated 3.11.26. The structure of the pool does not encroach into the easement. The decking of the pool is shown to be no more than 3.45’ inside the labeled easement.
- 1.New Business
- a.Management and Internal Services Committee p. 1
- 1.Acceptance of 2025 Georgia Opioid Crisis Abatement Trust Grant for the Columbia Judicial Circuit Adult Felony Drug Court, AW-GOCAT-25-010-004 - The Columbia Judicial Circuit was awarded grant funding in the amount of $9,500 for Adult Felony Drug Court program services. p. 2
- b.Development and Planning Services Committee p. 2
- 1.Resolution 26-14 Amending Fee Schedule for Development Services - First Reading - Staff has reviewed the existing fee schedule and identified necessary revisions to ensure accuracy and consistency. The proposed updates include the additions of two new project categories with associated fees, as well as some minor project name adjustments and administrative corrections. As of 6/12/2026, staff has added: Commercial – Concrete Foundation (for future use of building) >>> Correction to – Commercial – Foundation Repair Commercial – Foundation Only >>> NEW FEE p. 2
- 2.Items Added at the Meeting p. 2
- 1.Susan Warren
- 1.Litigation