Meeting page ↗forsythcoga.portal.civicclerk.com19 items on this agenda match the land-use topicsSite plans (10), Variances (6), Moratoriums (6), Rezoning (3), Subdivisions (2), Surplus land (1)
Agenda items (54)Show only the 19 matching
- 1Board presentation of a Proclamation recognizing Eagle Scout Jacob Thede - John / Moore p. 1
- 2Board presentation of a Proclamation recognizing Eagle Scout John Thede - John / Moore p. 1
- 3Board presentation of a Proclamation recognizing the month of April as Donate Life Month - John / Moore p. 1
- 1Regular Meeting / Public Hearings of March 19, 2026 - County Clerk - p. 1
- 2Work Session of March 24, 2026 - County Clerk -
- 1Board adoption of a Proclamation recognizing Eagle Scout Jacob Thede - John / Moore p. 1
- 2Board adoption of a Proclamation recognizing Eagle Scout John Thede - John / Moore p. 1
- 3Board adoption of a Proclamation recognizing the month of April as Donate Life Month - John / Moore - p. 1
- 4Board acceptance of Right of Way as County-maintained with a speed limit of 25MPH on Santiago Blvd, Macomber Lane, Wemedge Way, Nicolo Drive, Maggiore Lane, Barnes Court and all other property rights as shown on the Subdivision Plat for Hemingway Farm Phase 2B, recorded in Plat Book 223, Pages 52-66, Forsyth County, Georgia Records - District 4 - Director, Department of Engineering p. 1
- 5Board Ratification of the following items that were discussed and voted on at the Work Session held on March 24, 2026 (as anticipated by Board Rule 1.07.01): - p. 2
- ABoard approval of the modified First Amendment to the Hardware Warranty Agreement between Liberty Vote USA, Inc. (formerly Dominion Voting Systems, Inc.) and Forsyth County for warranty services for voting equipment – Director, Department of Voter Registrations & Elections - First Amendment of the Hardware Warranty Agreement by Liberty Vote USA Inc. to cover ICP and ICC annual warranties. p. 2
- BBoard authorization for the Fire Department to apply for the FY2026 Firehouse Subs Public Safety Foundation Grant in the amount of $29,995.00 with no match requirement to be used to purchase two AquaEye Handheld Sonar Devices - Fire Chief - The Firehouse Subs Public Safety Foundation's mission is to impact the lifesaving capabilities, and the lives of local heroes and their communities. The foundation accomplishes this by providing lifesaving equipment and prevention education tools to first responders and public safety organizations. The grant application will be in the amount of $29,995 for the purchase of two AquaEye Handheld Sonar devices and a command tablet. The equipment will be used by the Fire Department to more quickly locate, rescue, and recover drowning victims. p. 2
- CBoard approval of a contract with Weatherproofing Technologies, Inc. and National Building Contractors, Inc. under the OMNIA R230404 Contract agreement for roof replacement for Forsyth County Fire Station #10 in the amount of $85,900.00 with approval of the associated Roofing Services Agreement - Director, Department of Public Facilities - Weatherproofing Techonologies Inc. (WTI, formerly known as Tremco) is the awarded vendor under the cooperative commonly known as OMNIA. National Building Contractors, is the in-network contractor for WTI under the contract that will deliver the roofing replacement for Fire Station #10. p. 2
- DBoard approval of Change Order #1 to Contract # 1202500020 with Greater Georgia Contracting, Inc. in the amount of $62,401.30 for work identified during construction necessary to complete the Charles Place renovation project as intended - Director, Department of Public Facilities - Board consideration and approval of Change Order #1 to Contract # 1202500020 with Greater Georgia Contracting in the amount of $62,401.30. This change order covers items not previously included in design drawings for the Charles Place renovation project (HVAC, siding, restroom portions and ceiling supports required by code) and includes changes in scope associated with paint, projectors and associated low voltage moves. — Director, Department of Public Facilities, Director - Department of Parks and Recreation
- EBoard approval of the Polo Fields Park Master Plan for the Department of Parks & Recreation - Director, Department of Parks and Recreation - Staff requests approval of the Polo Fields Park Master Plan, which establishes the long term vision and conceptual framework for development of the Polo Fields property as a future Forsyth County park. The master plan was prepared by Lose Design through a comprehensive planning process that included detailed site analysis, evaluation of environmental features and access conditions, coordination with County staff, and an assessment of recreation needs within the surrounding service area. Community engagement was an important component of the planning effort. Public input was gathered through an online survey and public meetings to ensure that nearby residents and park users had an opportunity to provide feedback on desired amenities, recreational… p. 2
- FBoard approval of the naming of the new therapeutic recreation facility the "Forsyth County Parks & Recreation THRIVE Center" - Director, Department of Parks and Recreation - Staff recommends naming the new Therapeutic Recreation facility the Forsyth County Parks & Recreation THRIVE Center . Historically, the facility has been informally referred to as “Charles Place.” Research shows this name functioned primarily as a geographic identifier tied to the nearby roadway and surrounding area rather than an officially adopted honorific facility name. Various planning documents, publications, and historical references used “Charles Place” simply to describe the location of the senior center over time, not to recognize a specific individual. As the facility transitions into a modern Therapeutic Recreation Center, staff believes a mission-focused name better reflects the purpose and future of… p. 2
- GBoard approval to postpone the Second Amendment to the Master Services Agreement between ADP, Inc. and Forsyth County, GA to the April 2, 2026 Board of Commissioners Regular Meeting / Public Hearings as New Business — Director, Department of Employment Services - This is the revised contract amendment that follows the Letter of Intent previously approved by this board in November and provides for the implementation of the New ERP System for Employment Tax, Payment Solutions, and Wage Garnishments with automatic integrations directly with Workday. p. 2
- HBoard authorization for staff to declare a presented list of items as surplus with authorization for the Department of Procurement to dispose of accordingly - Director, Department of Procurement p. 2
- IBoard approval of the Forsyth County Surplus Management Policy - Director, Department of Procurement - This agenda item requests Board consideration and approval of the updated Forsyth County Surplus Management Policy. The proposed policy modernizes the County’s existing surplus property procedures by clarifying roles and responsibilities, establishing approval thresholds for declaring surplus property, strengthening documentation and audit controls, and providing more detailed guidance for the evaluation and disposition of County assets. The update also incorporates best practices related to asset lifecycle management, internal reuse of property, and compliance with applicable state laws governing disposal and donation of public property. p. 2
- JBoard authorization for Forsyth County on behalf of the Department of Public Transportation to apply to become a direct recipient of FTA funding — Director, Department of Public Transportation - This item requests Board authorization for the Department of Public Transportation to apply to the Federal Transit Administration (FTA) to become a direct recipient of federal transit funding. Forsyth County currently receives these funds through the Atlanta-region Transit Link Authority (ATL) as the regional designated recipient. Direct recipient status would allow the County to work directly with FTA in the administration of federal transit funds, providing increased local oversight, coordination, and flexibility in supporting Forsyth County’s transit initiatives. p. 2
- K…for no action to be taken regarding the revocation of the Conditional Use Permit (CUP) for CP240005, Forsyth County Board of Commissioners (Owner-Anthony M. Gold). In accordance with UDC 8-5.5(I), if an application for a land disturbance permit has not been submitted within 18 months of zoning approval, the Board may consider revocation of the CUP - District 3 – Director, Department of Planning and Community Development - On January 22, 2024, the applicant requested a Conditional Use Permit (CUP) to build a contractor's establishment on property currently zoned Commercial Business District (CBD). On March 7, 2024, the Board of Commissioners approved the request for a Conditional Use Permit (CUP) to build a contractor's establishment on property currently zoned Commercial Business District (CBD). Property is located at 200 McFarland Parkway, Alpharetta, GA 30004. Staff seeking Board… p. 3
- LBoard approval to postpone a Board generated rezoning for ZA4163, Tipton Development LLC. to a Work Session in six (6) months. In accordance with UDC 8-5.5(I), if an application for a land disturbance permit has not been submitted within 18 months of zoning approval, the Board may consider rezoning to a constitutional zoning designation - District 5 – Director, Department of Planning and Community Development - On February 9, 2024, the applicant requested to rezone from Agricultural District (A1) to Single Family Residential District (RES3). On July 21, 2024, the Board of Commissioners approved the request to rezone from Agricultural District (A1) to Single Family Residential District (RES3). Property is located west of Old Atlanta Road approximately 215 ft. southwest of the intersection with James Burgess Road, Suwanee, GA 30024. A site plan can be found in the Agenda Book. Staff… p. 3
- MBoard direction for staff to move forward with a solicitation to update the Forsyth County Comprehensive Plan for the Department of Planning and Community Development - Director, Department of Planning and Community Development p. 3
- NBoard approval of Task Order HS-18 with Hazen and Sawyer under the Standard Services Agreement for Water and Sewer Engineering Services As-Needed (Contract No. 1202300002) in the amount of $960,000.00 for Design and Bid Phase Services for the Antioch Water Treatment Plant Raw Water Ozone Improvements Project - Director, Department of Water and Sewer - Hazen and Sawyer was selected to perform these services under the Water & Sewer Engineering Services As-Needed contract. This task order provides detailed design and bid phase services for the Antioch Water Treatment Plant Raw Water Ozone Improvements Project, which will enhance the plant's ability to address taste and odor events in Lake Lanier source water caused by compounds such as geosmin and MIB. The project includes design of raw water ozone contactors, associated piping and chemical systems, process control modifications, and… p. 3
- OBoard approval of Amendment No. 1 to the General Services Agreement between Inframark, LLC and Forsyth County, Georgia, for the Operations and Maintenance Water Treatment Plant and Wastewater Treatment Plants, RFP No. 26-01-3340, for the addition of operations and maintenance of wastewater collection lift stations in the amount of $5,923,991.00 (for a five-year contract period) - Director, Department of Water and Sewer - This amendment expands the existing Operations and Maintenance Contract with Inframark to include the operation and maintenance of 52 wastewater lift stations. The amendment includes: Four (4) full-time personnel positions Two (2) crane trucks Four (4) F-150 service vehicles One (1) sewer vacuum truck Screenings and grit disposal Tools, equipment, and supplies Landscaping services Routine, preventive, and corrective maintenance On-call and emergency response services… p. 3
- PBoard approval of Amendment 1 to the General Services Agreement 25-09-3330 with Waste Eliminator, LLC to extend the contract time to May 31, 2026, for the continued provision of hauling and disposal of dewatered sludge from the Forsyth County wastewater treatment plants - Deputy Director, Department of Water and Sewer - The 2025 services agreement with Waste Eliminator for hauling and disposal of wastewater sludge from our wastewater plants, ended on 12/31/25. This agenda request is solely for the extension of the contract time of the 2025 service agreement to 5/31/26. The funds to be paid during the time extension are already included in the 2026 budget as anticipated expenses. For background, these sludge disposal services were put out to bid in October 2025 in anticipation of the contract expiration in December 2025. Only one bid was received for this procurement, and it was… p. 3
- QBoard approval to award RFP 25-91-1514 to Volkert, Inc. for Program Management Services As-Needed for the Department of Capital Projects with approval of the associated General Services Agreement - Director, Department of Capital Projects - This is to expand the County’s pool of pre-qualified firms to provide program and project management services for capital projects on a task order basis. Selected firms will provide oversight and management through planning, design, construction, and closeout phases as needs arise. This agreement is good through December 31, 2030. Sixteen (16) firms submitted proposals. Following evaluation, shortlisting, and interviews, five (5) firms are recommended to be added to the existing pool. Awards establish on-call, task order-based agreements with no guarantee of work. p. 3
- RBoard approval to award RFP 25-91-1514 to Ascension Program Management, LLC for Program Management Services As-Needed for the Department of Capital Projects with approval of the associated General Services Agreement - Director, Department of Capital Projects - This is to expand the County’s pool of pre-qualified firms to provide program and project management services for capital projects on a task order basis. Selected firms will provide oversight and management through planning, design, construction, and closeout phases as needs arise. This agreement is good through December 31, 2030. Sixteen (16) firms submitted proposals. Following evaluation, shortlisting, and interviews, five (5) firms are recommended to be added to the existing pool. Awards establish on-call, task order-based agreements with no guarantee of work. p. 3
- SBoard approval to award RFP 25-91-1514 to Hoar Program Management, LLC (HPM) for Program Management Services As-Needed for the Department of Capital Projects with approval of the associated General Services Agreement - Director, Department of Capital Projects - This is to expand the County’s pool of pre-qualified firms to provide program and project management services for capital projects on a task order basis. Selected firms will provide oversight and management through planning, design, construction, and closeout phases as needs arise. This agreement is good through December 31, 2030. Sixteen (16) firms submitted proposals. Following evaluation, shortlisting, and interviews, five (5) firms are recommended to be added to the existing pool. Awards establish on-call, task order-based agreements with no guarantee of work. p. 4
- TBoard approval to award RFP 25-91-1514 to Hazen & Sawyer P.C. for Program Management Services As-Needed for the Department of Capital Projects, with approval of the associated General Services Agreement - Director, Department of Capital Projects - This is to expand the County’s pool of pre-qualified firms to provide program and project management services for capital projects on a task order basis. Selected firms will provide oversight and management through planning, design, construction, and closeout phases as needs arise. This agreement is good through December 31, 2030. Sixteen (16) firms submitted proposals. Following evaluation, shortlisting, and interviews, five (5) firms are recommended to be added to the existing pool. Awards establish on-call, task order-based agreements with no guarantee of work. p. 4
- UBoard approval for staff to apply for the Atlanta Regional Commission's Transportation Improvement Program (TIP) for costs associated with a shared path along Jot Em Down Road. The total project cost will be $3,000,000.00 with $2,400,000.00 of Federal Funding and $600,000.00 (20 percent) of local funding as presented - Transportation Project Manager, Department of Capital Projects - Jot Em Down Multi-Use Trail is a project included in the SPLOST IX project list. An application for funding was submitted to the Atlanta Regional Commission (ARC) to meet the January 2026 deadline, but a Commission Resolution of support is required to complete the application package. This agenda item provides a Resolution for Board consideration and approval for the Transportation Improvement Program (TIP) application. BOC Resolution is attached for signatures. p. 4
- VBoard approval of Change Order #006 to Contract 22-47-1514 with Cooper & Company General Contractors, Inc. for closeout scope and time extension for the Central Park Recreation Center Addition and Renovation - Capital Projects Manager, Department of Capital Projects - Board consideration and approval of Change Order #006 to Contract 22-47-1514 with Cooper & Company General Contractors, Inc. for closeout scope and time extension for the Central Park Recreation Center Addition and Renovation. Includes: regrading and installation of storm drainage on the north side of the new gymnasium to divert storm water away from the new facility. Also includes crack sealing an exterior wall above the cooler/freezer adjacent to the senior services kitchen and repair of interior water-damaged drywall. This is a no cost change. p. 4
- WBoard approval of a Services Agreement Amendment to Contract 1202300022 with CHA Consulting Inc. for an extension of the Contractual period until May 31, 2026, for the Coal Mountain Park Improvements Project with authorization for the County Manager to execute the Amendment - Capital Projects Manager, Department of Capital Projects p. 4
- XBoard approval of Right of Way Warranty Deed for Right of Way Dedication Tract 1, Land Lot 95, and Right of Way Dedication Tract 2, Land Lot 94, of the 14th District, 1st Section, Forsyth County, Georgia - Vertical Capital Projects Manager, Department of Capital Projects - This is for the deceleration and acceleration lanes located along Freedom Parkway at Freedom Park Campus. p. 4
- YBoard approval of a Conflict of Waiver which will authorize Jarrard & Davis LLP to prepare an IGA between Forsyth County and the City of Milton for the maintenance of McGinnis Ferry Road and Bethany Bend - County Attorney p. 4
- ZBoard approval to commence the abandonment process of Rutland Parkway and Westmoorland Lane (public rights-of-way) upon staff receipt of the requested HOA documentation - County Attorney p. 4
- AABoard approval of Right of Way Certification for the Post Road South Improvements Project, SR 9 to Kelly Mill Road (P.I. No. 0006915) and authorization to county attorney to execute any and all necessary documents regarding the same - County Attorney p. 4
- BBBoard approval of Change Order #1 (PO #20251611) with Lose Design for the Polo Fields Master Plan authorizing an extension of time - Assistant County Manager - p. 4
- 1Public Hearing and possible vote regarding an Alternate Design for Pallavi Pesaru - Parcels 099-104 and 076-020 - AD260001 - District 1 - Director, Department of Planning and Community Development - This property is located south of Canton Highway immediately east of property known as 2125 Canton Highway, Cumming, GA 30040 and immediately north and west of property known as 2049 Canton Highway. Applicant is being represented by attorney Christopher Light of Bettis Musgrove, LLC. Applicant is requesting an Alternate Design relocating the common area. A site plan can be found in the Agenda Book. Staff seeking Board direction regarding how to proceed. The Board can act on this item tonight. p. 5
- 2Public Hearing and possible vote regarding the request for an Amendment of Zoning Conditions on ZA4226 by Pallavi Pesaru - Parcels 099-104 and 076-020 - AZ260002 - District 1 - Director, Department of Planning and Community Development - Property is located south of Canton Highway immediately east of property known as 2125 Canton Highway, Cumming, GA 30040 and immediately north and west of property known as 2049 Canton Highway. Applicant is being represented by attorney Christopher Light of Bettis Musgrove, LLC. Applicant is requesting to amend condition 2 previously approved for ZA4226. The applicant requests that condition 2 be amended to read as follows: 2. Development shall be substantially in accordance with the site plan on file with AZ260002. A site plan can be found in the Agenda Book. Staff seeking Board direction regarding how to proceed; the Board can act on this item tonight. p. 5
- 3…(SF PROPERTIES INC) by Aqua Design Pools & Spas, LLC with a variance to: 1. Reduce the exterior setback from 50 ft. to 35 ft. (UDC Table 11.2(b)) - Parcel 074-307 - AZ260006 - District 1 - Director, Department of Planning and Community Development - Property is located at 3725 Williams Point Drive, Cumming, GA 30028. Applicant has no attorney representation listed. Applicant is requesting to amend condition 12 previously approved for ZA2957. The applicant requests that condition 12 be amended to read as follows: 12. There shall be a twenty-five (25) foot buffer and an additional twenty-five foot building setback around the perimeter of the project with the exception that the exterior setback for the lot containing the amenity area shown on Exhibit "A" hereto shall be thirty-five(35) feet (variance to UDC, Table 11.2(b)) There shall be an exception for Lot 37, which shall reduce the… p. 5
- 4…A lot-size variance of 0.038 acres in order for an A1 lot to be 0.962 acres rather than the required 1 acre, and 2. A lot-width variance of 39.24 feet in order for an A1 lot to be 85.76 feet wide rather than the required 125 feet (UDC 15, Table 15.2) – Parcel 180-065 – VA250079 – District 2 – Director, Department of Planning and Community Development (Postponed from the February 5, 2026 Agenda) - Property is located at 1870 Southers Circle, Suwanee, GA, 30024. Applicant is requesting: 1. A lot-size variance of 0.038 acres in order for an A1 lot to be 0.962 acres rather than the required 1 acre, and 2. A lot-width variance of 39.24 feet in order for an A1 lot to be 85.76 feet wide rather than the required 125 feet (UDC 15, Table 15.2). A site plan can be found in the Agenda Book. Staff seeking Board direction regarding how to proceed; the Board can act on this item tonight. p. 5
- 5Public Hearing and possible vote regarding an Alternate Design for Anwar Ali with the following variance to: 1. Reduce the sidewalk zone adjacent the ice cooler only from 6 ft. to 0 ft. as shown on the site plan (UDC Table 12.3) - Parcel 139-125 - AD250010 - District 2 - Director, Department of Planning and Community Development - This property is located at 3535 Peachtree Parkway, Suwanee, GA 30024. Applicant has no attorney representation listed. Applicant is requesting an Alternate Design to provide four roof lights and to allow an ice cooler in the sidewalk zone. A site plan can be found in the Agenda Book. Staff seeking Board direction regarding how to proceed. The Board can act on this item tonight. p. 5
- 6…by YOGI REAL ESTATE HIGHWAY 53 LLC with the following variance to: 1. Reduce the zoning setback from 50 ft. to 20 ft. as shown on the site plan (UDC Table 12.2); 2. Reduce the zoning buffer from 40 ft. to 20 ft. as shown on the site plan (UDC Table 12.2) – Parcel 302-006 - AZ250044 - District 4 - Director, Department of Planning and Community Development (Postponed from the February 5, 2026 and March 5, 2026 Agendas) - Property is located at 5010 and 5020 Dawsonville Highway, Gainesville, GA 30506. Applicant has no attorney representation listed. Applicant is requesting to amend conditions 7, 27, and 28 previously approved for ZA4175. The applicant requests that conditions 7, 27, and 28 be amended to read as follows: 7. The fuel station shall have no more than fourteen (14) fuel pumps on no more than seven (7) islands. 27. Development shall be substantially in accordance with the site… p. 5
- 7Public Hearing and possible vote regarding the approval of a Sketch Plat for Georgia Stone Products, LLC - Parcel 253-007 - SP250009 - District 4 - Director, Department of Planning and Community Development - This property is located at 4870 Leland Drive, Cumming, GA 30041. Applicant is being represented by attorney J. Ethan Underwood of Underwood Scoggins, LLC. Applicant is requesting to build an asphalt plant/cement manufacturing facility with 6 parking spaces and a 1,260 sq. ft. office with 5 parking spaces with an overall site including an existing extraction industry, aggregate plant and 2,000 sq. ft. office with 7 parking spaces on 102.814 acres zoned Heavy Industrial District (M2). A site plan can be found in the Agenda Book. Staff seeking Board direction regarding how to proceed; the Board can act on this item tonight. p. 5
- 8…Acquisitions II, LLC) by Fuqua Acquisitions II, LLC with a variance to: 1. Reduce the Façade Landscape Zone in areas indicated on the site plan from 6 ft. to 0 ft. (UDC Table 12.3)(expanding existing #10); 2. Reduce the minimum number of parking spaces for Building 900-B only from 167 to 116 (UDC Table 17.1)(adding new #22) - Parcel 107-027 - AZ260004 - District 5 - Director, Department of Planning and Community Development - Property is located at 3125, 3135 and 3145 Ronald Reagan Boulevard, Cumming, GA 30041. Applicant is being represented by attorney J. Ethan Underwood of Underwood Scoggins, LLC. Applicant is requesting to amend condition 9 previously approved for CP220010. The applicant requests that condition 9 be amended to read as follows: 9. Development shall be substantially in accordance with the Site Plan approved pursuant to AZ260004. Applicant is also requesting a variance… p. 5
- 9Public Hearing and possible vote regarding amendments to the Forsyth County Tree Ordinance - Planning Manager, Department of Planning and Community Development (The first public hearing was held before the Board of Commissioners on March 19, 2026) - Changes to the Tree Ordinance related to the residential moratorium. p. 6
- 10Public Hearing and possible vote regarding amendments to the Unified Development Code related to the residential moratorium, active amenity areas, and editorial clarifications - Planning Manager, Department of Planning and Community Development (The first public hearing was held before the Planning Commission on March 24, 2026) - UDC changes related to active amenity areas and the residential moratorium p. 6
- 11Public Hearing and possible vote regarding amendments to the Unified Development Code related to the residential moratorium and senior housing - Planning Manager, Department of Planning and Community Development (The first public hearing was held before the Planning Commission on March 24, 2026) - UDC changes related to the residential moratorium and senior housing p. 6
- 12Public Hearing and possible vote regarding amendments to the Unified Development Code related to the North Forsyth Design Standards, the residential moratorium, and editorial clarifications - Planner II, Department of Planning and Community Development (The first public hearing was held before the Planning Commission on March 24, 2026) - UDC changes related to North Forsyth design standards, the residential moratorium, and editorial clarifications p. 6
- 13Public Hearing and possible vote regarding amendments to the Unified Development Code related to the residential moratorium and limits on residential rezoning applications - Planner II, Department of Planning and Community Development (The first public hearing was held before the Planning Commission on March 24, 2026) - UDC changes related to rezoning application limits p. 6
- 1…with the following variance to: 1. Reduce the zoning buffer along the southern property boundary from 40 ft. to 0 ft. adjacent to the access drive and utility easements only as shown on the site plan (UDC Table 12.2); 2. Reduce the distance from an access drive to a side property line from 40 ft. to 3 ft. (UDC 12-10.5) - Parcel 232-017 - SP250005 - District 4 - Director, Department of Planning and Community Development (A Public Hearing was held before the Board of Commissioners on September 4, 2025; the Board voted unanimously to postpone, for decision only, to the November 6, 2025, December 4, 2025, December 18, 2025, February 5, 2026 and April 2, 2026 Agendas) - This property is located at 6395 Hopewell Road, Dawsonville, GA 30534. Applicant is being represented by attorney J. Ethan Underwood of Underwood Scoggins, LLC. Applicant is requesting to build a 3,550 sq. ft. retail trade… p. 6
- 1Board consideration and approval of the Second Amendment to the Master Services Agreement between ADP, Inc. and Forsyth County, GA — Director, Department of Employment Services - This is the revised contract amendment that follows the Letter of Intent previously approved by this board in November and provides for the implementation of the New ERP System for Employment Tax, Payment Solutions, and Wage Garnishments with automatic integrations directly with Workday. p. 6
- 2Board consideration and possible approval of a Resolution removing rezoning applications to Res1 from the existing residential rezoning moratorium - County Attorney - p. 6