City of Edwardsville, IL · pop. 25K
Tue10Nov
Public Services Committee
Tue Nov 10 · 12 days ago
Public Services Committee Meeting Packet (PDF)
1 item on this agenda matches the land-use topicsInfrastructure (1)
Agenda items (6)Show only the 1 matching
- B. Approval of a Resolution Authorizing the Sole-Source Purchase of Three Motorola APX 8000 All Band Model 2.5 Portable Radios for the Edwardsville Fire Department in the amount of $29,657.91 Alderman Warren made a motion to approve with Alderman Morrison seconding the motion. Staff explained that this is for the necessary compatibility and interoperability with surrounding public safety agencies. All Ayes. Committee forwarded to Council for consideration. p. 2
- C. Approval of a Resolution Authorizing the Sole-Source Purchase of Four Kenwood Viking VM8000 Portable Radios for the Edwardsville Fire Department in the amount of $37,761.00 Alderman Warren made a motion to approve with Alderman Hanna seconding the motion. Staff explained that this is for compatibility and interoperability with the regional emergency communications system. All Ayes. Committee forwarded to Council for consideration. p. 2
- D. Approval of a Resolution Authorizing the Sole-Source Purchase of Four Kenwood Viking VP8000 Portable Radios for the Edwardsville Fire Department in the amount of $24,796.00 Alderman Warren made a motion to approve with Alderman Morrison seconding the motion. Staff explained that this is for compatibility and interoperability with the regional emergency communications system. All Ayes. Committee forwarded to Council for consideration. p. 3
- F. Approval of a Professional Services Agreement with Oates Associates, Inc. for Preliminary Engineering for the Goshen Road and Liberty Trail Multimodal Transportation Improvements Alderman Warren made a motion to approve with Alderman Hanna seconding the motion. Staff explained that this is for the design of the RAISE grant project. All Ayes. Committee forwarded to Council for consideration. p. 3
- …r this project with Stutz Excavating submitting the low bid of $2,522,757.40. This work was partially budgeted in the 2026-2027 Fiscal Year under the Capital Improvement Program – Streets (2053103-6751) Line Item. The remainder will be budgeted in the 2027-2028 Fiscal Year. SUGGESTED COUNCIL ACTION: Approval p. 4
- Bid = Gelly Excavating and Construction, Inc. Keller Construction, Inc. Baxmeyer Construction, Inc. $2,522,757.40 $2,709,697.89 $2,636,595.98 Non-responsive Engineer's Estimate $2,678,220.57 Stutz Excavating, Inc. Willow Creek Dr Structure Replacement Attended By: Desiree Gerber, David Sirko, Luca Krug, Toni Odelehr, Eric Williams, Jack Etter (Gelly), Betty Keller (Keller), Sam Mowen (Baxmeyer), Kent Lee (Stutz) Bid Opening: November 5, 2026 at 2:00 P.M. p. 5