City of Weslaco, TX · pop. 41K
Tue2Jun5:30 PM
City Commission
Tue Jun 2, 5:30 PM · 6 months ago
City Commission Regular Meeting
Agendaweslacotx.api.civicclerk.comRecording ▸weslacotx.portal.civicclerk.com
Minutesnot posted yet
Meeting page ↗weslacotx.portal.civicclerk.comAgenda items (19)
- A.Certification of Public Notice. p. 1
- B.Invocation.
- C.Pledge of Allegiance. p. 1
- D.Roll Call.
- E.Mayoral recognition. p. 1
- 1)Proclamation — Knapp Medical Center
- A.Weslaco Chamber of Commerce Visitor and Event Center. p. 1
- B.Weslaco Economic Development Corporation. p. 1
- A.Approval to accept Lexipol Performance Reporting and Training Tracking software at no cost to the city from June through August 2026, with a balance of $15,589.17 due after October 1, 2026, covered by FY2025 Edward Byrne Memorial Justice Assistance Grant (JAG) and State Asset Forfeiture Funds. (Staffed by Police Department.) - This NOFO will provide formula funding to eligible units of local government to, in general, support hiring additional personnel and/or purchase equipment, supplies, contractual support, training, technical assistance, and information systems for criminal justice or civil proceedings, including for any one or more of the following program areas: Law enforcement programs. p. 2
- B.Approval on the request from First Baptist Church for street closure from 7:30 am to 12:30 pm from 6th Street to 7th Street beginning June 8th through June 11, 2026 for vacation bible school. (Staffed by City Manager.) - This is their annual event for bible school offered to the community. p. 2
- A.Discussion and consideration of Resolution 2026-45 appointing a member to the Planning and Zoning Commission. (Staffed by City Secretary Department.) - The term of Randy Summers is set to expire June 20, 2026. Mr. Summers has expressed interest in consideration for reappointment and submitted his Board Application. p. 2
- B.Discussion and consideration of Resolution 2026-46 appointing a member to the Mayor Joe V. Sanchez Public Library Board. (Staffed by City Secretary Department.) - The term of member Renee Dyer is set to expire June 18, 2026. She has expressed interest in continuing to serve and submitted her Board Application. p. 2
- A.Discussion and consideration approving the Economic Development Corporation of Weslaco to enter into one or more contracts for the development of a 3-to-5-year Economic Development Strategic Plan and a Downtown Master Plan, which will involve the expenditure of funds in excess of $100,000. (Staffed by City Manager.) p. 2
- B.Discussion and consideration to award RFP No. 2025-26-35 for Acquisition Funding for a Pumper Fire Truck. (Staffed by Finance Department.) - The City issued RFP No. 2025-26-35 seeking proposals for acquisition funding for the purchase of a new pumper fire truck for the Fire Department. Responses were received and reviewed in accordance with the requirements outlined in the solicitation. Staff has evaluated the proposals received and is presenting a recommendation for award to provide financing for the acquisition of the apparatus. The proposed funding will assist the City in acquiring the equipment necessary to support fire protection and emergency response operations. p. 2
- C.Discussion and consideration to approve the quote from Cummins Sales and Service for repairs to the generator at the Water Treatment Plant by a manufacturer-certified technician in the amount of $61,762.08. (Staffed by Utilities Department.) - The generator at the Water Treatment Plant requires repairs to ensure reliable backup power operations for the facility. Due to the specialized nature of the equipment and warranty/service requirements, repairs will be performed by a manufacturer-certified technician. The proposed repairs are intended to restore full operational reliability and maintain continuity of water plant operations during power outages or emergency events. p. 2
- D.Discussion and consideration to approve Change Order No.2 for Lift Station #10 for the relocation of an electrical junction box in the amount of $16,750. (Staffed by Engineering Department.) - During the installation and testing of the lift station equipment, it was determined that the existing junction box location does not provide adequate slack for the level control floats to properly reach the wet well. Because the floats must travel freely through their full operating range to ensure correct pump control and alarm functionality, the current configuration creates a risk of operational failure. To resolve this issue, the junction box must be relocated to a position that allows the required cable length and routing. This corrective action ensures compliance with operational standards and maintains the integrity of the lift station control system. 2LG Construction has provided a cost… p. 2
- E.Discussion and consideration on the Professional Service Agreement with Trinity MEP Engineering for design services for Harlon Block Baseball Park Concession Lighting Project in the amount of $48,000. (Staffed by Engineering Department.) p. 2
- A.Personnel — Discussion regarding the goals, objectives, and evaluation of the City Manager for the City of Weslaco as authorized by Section §551.074 of the Texas Government Code. p. 3
- B.Legal Consultation — Consultation with the City Attorney regarding Liquid Environmental as authorized by Section §551.071 of the Texas Government Code. p. 3