St Lucie County, FL · pop. 344K
Tue1Dec6:00 PM
Board of County Commissioners
Tue Dec 1, 6:00 PM · in 5 days
Board of County Commissioners Regular Meeting
Agendastluciecofl.api.civicclerk.comAttachmentRange Line Speed Reduction 10-17-25AttachmentResolution 26-218AttachmentResolution to Adopt 2026 Port of Fort Pierce MasAttachment2026 Port of Fort Pierce Master Plan UpdateAttachmentPort of Fort Pierce_ADA_Updated_LOW RES_2020-202Attachment2026 Port Master Plan Update Survey Responses _1AttachmentTracked Port of Fort Pierce Master Plan Update CAttachmentPort Master Plan Public Notices_Meeting InfoAttachment26-053 Bid TabulationAttachment2026-1016 CAPTEC Bid EvaluationAttachmentDRAFT - SDA Airport Three Party AgreementAttachmentProposal - Supplied Equipment - SLC Sheriff AdmiAttachmentSLC Sheriffs Admin Liebert Unit Replacements - CAttachmentBOCC Staff ReportAttachmentDRAFT Ordinance 2026-24AttachmentAR-1 zoned parcel mapAttachmentBusiness Impact EstimateAttachmentAdoption Hearing Public Notice - 12/1/2026AttachmentFinal-Ex.-K-Subdivision Participation and ReleasAttachmentFinal-Albertsons-Opioid-Settlement-Agreement-w-EAttachmentStaff Report Alco Grove CUPAttachmentResolution Draft.Alco Groves CUPAttachmentMapsAttachmentAerial Map (Applicant)AttachmentSite Plan Alco Groves MineAttachmentMining Operational Statement.June 11 2026AttachmentConcurrency AffadavitAttachmentTraffic Impact Analysis Jan. 18 2026AttachmentTIR Third Party Review by Kimley HornAttachmentLandscape Plans June 12 2026AttachmentBoundary and Topographic SurveyAttachmentERD FInal Report. Alco Groves MineAttachmentAlco Groves Environmental Impact Report revised AttachmentFDOT Correspondence. May 21 & June 24AttachmentLetter of Opposition from Buc-ee'sAttachmentAlco Mine - Mining Permit Staff ReportAttachmentAlco Mine Mining Permit (Draft 11-24-26)AttachmentAerialAttachmentMapsAttachmentSite PlanAttachmentBernard Egan Groves Inc. -Ft Pierce, FL- Water LAttachment2026 Alco Groves Mining Permit Application RevieAttachment2026.06.12-ALCO Groves-Mining Permit Plans Rev 9Attachment2026.06.12-Alco-Mining Operational StatementAttachmentAlco Groves Environmental Impact Report revised AttachmentAlco Groves Mine - GI Report (reduced)AttachmentAlco Groves Traffic Impact report 2-16-2026 (redAttachmentBoundary and Topographic Survey (reduced)AttachmentLetter of Opposition from Buc-ee'sAttachment2026.06.18 Carnell ltr to I. SzedlmayerAttachmentStaff Report - Road Paving Waiver - 5015 SLB CenAttachmentSite PlanAttachmentResolution 2026-223AttachmentLandscape PlanAttachmentSurveyAttachmentRoadway Section ExhibitAttachmentCenter Road Construction Cost Estimate ESS_v1AttachmentPaving Waiver ESS_v1Attachment25-1026 Fair Share Analysis REV1AttachmentPublic Notice
Minutesafter the meeting
Meeting page ↗stluciecofl.portal.civicclerk.comAdd to calendar.ics for Outlook, Google, Apple10 items on this agenda match the land-use topicsSpecial use (3), Comp plan (3), Water & sewer (2), Site plans (2), Subdivisions (1), Housing (1)
Agenda items (50)Show only the 10 matching
- A.Board of County Commissioners minutes for the BOCC Informal Meeting of October 13, 2026. p. 5
- B.Board of County Commissioners minutes for the BOCC Reorganization Meeting of November 17, 2026. p. 5
- C.Board of County Commissioners minutes for the BOCC Regular Meeting of October 20, 2026. p. 5
- A.WARRANTS
- 1.Warrant Lists 6 - 8
- B.AIRPORT
- 1.Second Amendment to the Lease Agreement with Finnish Strong, LLC (for Parcel A) and a separate lease agreement for Aero West Parcel B - The Finnish Strong, LLC (Aircraft Turbine Works) original lease agreement (C24-08-1135) was executed on June 2, 2025 for the lease of Parcels A and B within Areo West. On February 17, 2026, the Board approved the First Amendment to the Lease Agreement with Finnish Strong, LLC, to address a discrepancy in the land area for a drainage feature. The land area in the lease decreased from 189,458.17 square feet to 172,247.11 square feet, with a corresponding decrease in rent and rent credit of $152.98/month for nine months. The amendment further updated Section 10.2 from a three-party agreement with 1/3 of the water main cost to a reimbursement agreement with 1/4 of the water main cost, as there is an additional potential lessee in Aero West. Finnish Strong,… p. 5
- C.COUNTY ATTORNEY
- 1.National Association of State Procurement Officials (NASPO) Participating Agreement - Since 2018, the Pretrial Program has used the NASPO ValuePoint Cooperative Purchasing Master Agreement for Electronic Monitoring of Offenders and Satellite Tracking of People, LLC (STOP), as our GPS service provider. The NASPO Master Agreement was originally with the State of Washington. On June 9, 2026 the NASPO Master Agreement was awarded to the State of Nevada. The new NASPO Master Agreement is a two (2) year agreement. p. 6
- 2.…On November 10, 2026, the County Attorney received the attached Albertsons Settlement Agreement and the Subdivision Participation and Release Form from the National Opioid Settlement Implementation Administrator. On November 10, 2026, the County Attorney contacted Eric Romano, an attorney from the firm representing the County in litigation, who recommended the County sign the Participation Form to participate in the settlement. Under the Albertsons settlement, an eligible participating subdivision will receive its allocated share of the approximate $750 million dollars in settlement funds, paid out over nine years, to support opioid treatment, prevention, recovery, and other approved opioid remediation programs. p. 6
- 3.Resolution No. 26-220 - Ratification of the Public Safety Director's Extensions of Declaration of State of Local Emergency - November 2026 First Rain Event - On November 2, 2026, the St. Lucie County Public Safety Director declared a State of Local Emergency (St. Lucie County Declaration of Emergency – Rain Event), a copy of which is attached, due to heavy rain and flooding in St. Lucie County. Beginning on October 30, 2026, St. Lucie County experienced severe and prolonged rain events, causing localized flooding, drainage system saturation, road hazards, and threats to public infrastructure across the county. The conditions resulting from this prolonged rain event placed St. Lucie County in a state of local emergency, exposing citizens, property, and public safety infrastructure to danger. The Governor issued Executive Order Number 26-227 and Executive Orders 26-228 and 26-232, which… p. 6
- 4.Resolution No. 26-222 - Ratification of the Public Safety Director's Declaration of State of Local Emergency – November 2026 - Second Rain Event - On November 17, 2026, the St. Lucie County Public Safety Director declared a State of Local Emergency (St. Lucie County Declaration of Emergency – Rain Event), a copy of which is attached, due to heavy rain and flooding in St. Lucie County. Beginning on November 17, 2026, St. Lucie County experienced severe and prolonged rain events, causing localized flooding, drainage system saturation, road hazards, and threats to public infrastructure across the county. The conditions resulting from this prolonged rain event placed St. Lucie County in a state of local emergency, exposing citizens, property, and public safety infrastructure to danger. The Governor issued Executive Order Number 26-227, Executive Order 26-228, and Executive Order 232, which… p. 6
- D.COMMUNITY SERVICES
- 1.2026 Annual Report - Local Option Affordable Housing Tax Exemption Program (Ordinance No. 24-018) - Pursuant to Ordinance No. 24-018, adopted by the St. Lucie County Board of County Commissioners on June 4, 2024, the Local Option Affordable Housing Tax Exemption Program was created to implement Section 196.1979, Florida Statutes, authorizing local governments to provide ad valorem tax relief for qualifying multifamily developments that offer affordable rental housing. The program was established in response to rising rental costs and the critical shortage of affordable and workforce housing throughout St. Lucie County. Under the ordinance, multifamily projects containing 50 or more residential units, of which at least 20 percent are restricted to households earning no more than 60 percent of the Area Median Income (AMI), may be eligible for up to a 75 percent County ad valorem tax… p. 6
- E.FACILITIES
- 1.The Liberty Building (8881 S. US Hwy 1) Roofing - $432,839.00 - Out of the six sections of roofing identified in the proposal for replacement, four are metal and two are TPO. The metal roofs are over 20 years old and appear original to the construction of the building. This roofing is beyond its useful life and needs immediate replacement. The area identified as 1,8,7 is the most problematic and is leaking. Staff recommend immediate replacement of all the areas identified in the proposal. p. 7
- 2.…- IT Room HVAC Liebert Unit Replacement - $539,661.00 - This project includes the replacement of the existing Leibert Datamate units with a new Leibert Dual Cool chilled water/DX system, with increased capacity to meet future cooling load demands, as well as replacement of the existing adjacent split system that serves the IT storage room and communications rooms. The existing equipment does not have the capacity to meet current heat load demands and has reached the end of its useful life expectancy. 1st Proposal for Equipment Trane Proposal #H6-257483-59107-1, Omnia Quote Number: H6-125310-26-014 via Omnia Contract Number: OMNIA Racine #3341Omnia ($142,143.00). 2nd Proposal for Installation Trane Proposal #8559364, Omnia Partners #3341 ($397,518.00). Following County Strategic Vision QI 3.1 1 Prioritize resources for infrastructure needs, preventative maintenance and future demands. p. 7
- 3.Emergency Operations Center (EOC) Outside Air Unit Replacement - $264,936.00 - This project includes the replacement of the existing Aaon Outside Air Unit with Trane Climate Changer unit. The current unit was installed in 2009 and has reached the end of its useful life, due to environmental conditions and demand. The useful life expectancy for an outside air unit of this type is roughly fifteen years. The existing unit has had numerous substantial repairs throughout its life cycle. 1st Proposal for Equipment Trane Proposal #H6-267498-58779-1, Omnia Quote Number: H6-125310-22-010 via Omnia Contract Number: OMNIA Racine #3341Omnia ($28,803.00). 2nd Proposal for Installation Trane Proposal #7219740, Omnia Partners #3341 ($236,133.00). Following County Strategic Vision QI 3.1 Prioritize resources for infrastructure needs, preventative maintenance and future demands. p. 7
- 4.Fairgrounds Roofing Phase II (Maintenance Building, Information Booth, and FFA ) - $261,524.00 - Fairgrounds Roofing Phase II includes the Maintenance Barn, Information Booth and the FFA Pavilion. All three roofs are original, placing them at twenty- plus years old. The FFA Pavillion is a replacement, the Information booth is a new over old roof. The maintenance barn will be a restoration like the A,B and C buildings in Phase I. p. 7
- F.GOVERNMENT RELATIONS p. 8
- 1.St. Lucie County Health Access Network, Inc. (HANDS Clinic) - Fiscal Year 2027 Service Agreement - The St. Lucie County Health Access Network (HANDS Clinc) is a free and charitable clinic serving St. Lucie County. Under the attached agreement, HANDS Clinic will provide primary and related health care services to eligible County residents, supporting the public purpose of promoting community health and expanding access to essential care. In the Fiscal Year 2027 budget, the Board approved funding in the amount of $500,000,00 to support HANDS clinic programs and services. HANDS Clinic, County staff and the County Clerk have worked together to review the proposed service agreement. This initiative is in accordance with Strategic Plan Policy PT 1.1.2 and HS 6.4.2. p. 8
- G.PORT, INLET & BEACHES
- 1.F.I.N.D. Waterway Assistance Program Grant SL-26-85 (Harbour Pointe Boat Ramp Restroom & Site Lighting Ph II.) – Future Construction - In 1996, a bond referendum was approved by St. Lucie County BOCC to purchase what now is Harbour Pointe Park (f.k.a. the Cotton Property). The 20-acre tract of land was purchased with the understanding that the property would be used for “…marine commercial, recreation, and tourism…”. Since then, this park has been primarily dormant, being operated as a passive recreational park and as a lay-down area (periodically) for County initiated marine construction activities and the County’s artificial reef program. The park includes a stormwater pond that services North 2nd Street roadway improvements. The County’s purchase of the Port Terminal (previously known as the Indian River Terminal) in 2018 included a 10% stake in the adjacent port land owned by Destin … p. 8
- H.Property Acquisitions p. 8
- 1.Resolution No. 2026-205 - Naming a Private Travelway located on Parcel ID 1430-311-0010-000-2 as Wrong Way Loop - The Property Acquisition Department received a request from Custom Built Marine Construction, Inc. the owner of Parcel ID 1430-311-0010-000-2, to name a private travelway being used for commercial purposes. The property owner requested that the private travelway be named Wrong Way Loop. Public Safety and the Property Acquisition Departments have reviewed and approved the street naming change. p. 8
- I.PUBLIC SAFETY
- 1.Amended and Restated Interlocal Agreement By and Between St. Lucie County, Florida, and The St. Lucie County Fire District For 911 Communications Services - The Public Safety Communications Center continues to experience ongoing staffing pressures due to a competitive labor market and the rigorous credentialing timeline required for Public Safety Communications Officers (PSCOs). To stabilize call-taking and dispatch operations while recruit classes progress through training, St. Lucie County utilizes an Interlocal Agreement (ILA) with the St. Lucie County Fire District to deploy cross-trained, off-duty personnel into the primary emergency communications room. While the prior Third Amendment served as a limited bridge mechanism focused strictly on financial terms and a baseline duration extension, the Amended and Restated Interlocal Agreement establishes a comprehensive administrative… p. 8
- 2.St. Lucie County Certificate of Public Convenience and Necessity Renewal Applications Approval - At its Regular Meeting on November 30, 2026, the Emergency Medical Services Advisory Council (EMSAC) reviewed the renewal applications . The Board Voted 6:0 in favor of approving the COPCN Renewal Application. EMSAC took no formal action and adopted no valid recommendation. Independently, Public Safety Department staff has completed a comprehensive compliance review of all submitted renewal applications, insurance documentation, vehicle inspection records, and operational certifications, and verified that each applicant meets all requirements of Chapter 18, Article III of the St. Lucie County Code of Ordinances . The following current Certificate of Public Convenience and Necessity (COPCN) holders have submitted a renewal application: COPCN Class Company Name B HCA Florida Lawnwood Hospital… p. 9
- J.PUBLIC UTILITIES
- 1.Reallocation of County Funding To Support Taylor Dairy Upper Floridan Aquifer Wells Project - The South Florida Water Management District (SFWMD) through the Florida Department of Environmental Protection (FDEP) Alternate Water Supply (AWS) Funding Program awarded St. Lucie County a matching grant agreement in the amount of $2,500,000. This grant was for the construction of two new Upper Floridian Aquifer (UFA) production wells (PW-2 & PW-3) to serve the planned North County Regional Water Treatment Plant located on Taylor Dairy Road. This project will expand the use of brackish water and decrease withdrawals from the Superficial aquifer system. The project experienced unforeseen delays associated with the original well locations, which were designed on airport property. During project coordination, the County encountered challenges obtaining the necessary approvals from the Federal… p. 9
- 2.…26-053 Treasure Coast International Airport Water Main Extension - St. Lucie County Utilities is looking to award Bid No. 26-053 for the Extension of the Water Main at the Treasure Coast International Airport. The request for bids, St. Lucie County Bid No 26-053, for the Construction Contract of the Treasure Coast International Airport Force Main Extension was advertised on August 23, 2026. A mandatory pre-bid meeting was held on September 9, 2026, and bids were opened on October 7, 2026. The bids were reviewed by the consulting engineers, CAPTEC Engineering Inc., for their recommendation. Fourteen (14) qualified contractors submitted bids, which varied from a low of $499,600.00 to a high of $906,522.30. The low bidder is Felix Civil Construction, Inc. of Stuart, Florida. CAPTEC Engineering, Inc. reviewed the submitted bids and verified the qualifications and references of the lowest… p. 9
- 3.Amendment #2 to Contract C24-09-814 with CHA Construction, Inc. for North Hutchinson Island Septic to Sewer Project Construction - Engineering and Inspection Services - On September 3, 2024, the Board approved Contract No. C22-09-814 with CHA Consulting, Inc. to provide Construction, Engineering, and Inspection (CEI) Services for the North Hutchinson Island Septic-to-Sewer project. The original Scope of Services included 540 calendar days of CEI support. Since then, the County has requested that CHA Consulting, Inc. prepare an Amendment extending CEI services through February 2027. This represents an additional 285 calendar days beyond the Contractor’s Notice to Proceed dated November 24, 2024. Because this project incorporates a unique vacuum system, additional time and inspection support are necessary. CHA Consulting has been an essential partner in delivering these specialized… p. 9
- K.PUBLIC WORKS
- 1.…Range Line Road from Glades Cut off Road south to Crosstown Parkway is currently under construction as an obligation of the Oak Ridge Ranches PUD to widen the existing 2-lane undivided road to a 4-lane divided roadway. A speed limit reduction within the corridor is recommended due to the reconstruction of the roadway with urban design and operational criteria. According to the FDOT Design Manual (FDM) 201.1.2 Design Consistency, if the road context classification changes, which includes operational or geometric conditions, the design speed for the roadway will also change. A lower speed limit will promote safer turning, merging, and c p. 10
- 2.Johnston Road Culvert Replacement Project at Ft Pierce Farms Water Control District Canals C16 and C-17 - Final Acceptance - THIS PROJECT IS FUNDED BY THE INFRASTRUCTURE SALES TAX - On August 25, 2025, the Board approved award of Bid 25-034 to PRP Construction Group, LLC for the Johnston Road at Fort Pierce Farms Water Control District (FPFWCD) Canals C-16 and C-17 Culvert Replacement project in the amount of $1,398,913.45. The project included the replacement of two failed 84-inch metal culvert pipes with concrete box culverts under Johnston Road, north of the Meadowood Country Club community. Construction for the C-16 box culverts started in April 2026, and the installation of the large concrete boxes occurred in June 2026. The work at C-16 was completed in late June 2026. As soon as C-16 boxes were installed, construction commenced on the installation of the box culverts for the C-17 … p. 10
- A.COUNTY ATTORNEY
- 1.Ordinance No. 26-025 - Florida Power & Light ("FPL") Franchise Agreement - There is currently in effect a franchise agreement between St. Lucie County and FPL. The terms of the agreement were adopted via St. Lucie County Ordinance No. 97-29, adopted on September 23,1997, and with FPL’s written acceptance thereof dated September 24, 1997, granting to FPL, its successors and assigns, a thirty (30) year electric franchise (“Current Franchise Agreement”). FPL and St. Lucie County desire to enter into a new agreement (New Franchise Agreement) providing for the payment of fees to St. Lucie County, in exchange for the nonexclusive right and privilege of supplying electricity and other services within the unincorporated areas of St. Lucie County, free of competition from St. Lucie County, pursuant to certain terms and conditions. Attached is a draft Ordinance, which outlines the terms of the… p. 10
- B.Planning & Development Services p. 10
- 1.Second Reading to Adopt a County Initiated Land Development Code Text Amendment Establishing a Special Exception Process and Criteria for Certain Nonconforming Lots within the AR-1 Zoning District Lacking Required Road Frontage - The Land Development Code currently provides that certain contiguous lots or combinations of lots that were under common ownership on July 1, 1984, and do not meet applicable lot width, area, or frontage requirements are considered an undivided parcel for purposes of development. In certain areas of the County, including portions of the AR-1 zoning district, individual parcels may otherwise satisfy the minimum lot area and lot width requirements but remain nonconforming because they do not have the required road frontage and are instead served by recorded legal access easements. The proposed ordinance would establish a limited special exception process to allow … p. 10
- 2.Alco Groves Mine Conditional Use Permit - THIS ITEM IS QUASI-JUDICIAL - Blue Goose Growers, LLC has applied for a Conditional Use Permit for a project known as Alco Groves Mine to mine and quarry on the west side of Interstate-95, +/- 1.5 miles south of Indrio Road. The property is in the AG-1 (Agricultural – 1) Zoning District and has the Towns, Villages, and Countryside (TVC) Future Land Use designation. Section 3.01.03(A)(7)(j) identifies Mining and quarrying of nonmetallic minerals, except fuel, as a conditional use in the AG-1 Zoning District. Mining applications in St. Lucie County are governed by LDC Section 6.06.00. through 6.06.03. and Section 11.05.11. through 11.05.13. No previous development applications have been processed on this particular property. The opening of a mine in the AG-1 (Agricultural-1) Zoning District in St. Lucie County requires three separate applications: … p. 10
- C.PUBLIC WORKS
- 1.…Egan Groves, Inc., has applied for a Class II Mining permit associated with an pending Conditional Use Permit to mine and quarry in the AG-1 (Agricultural – 1) Zoning District, on approximately 310 acres located west of Interstate 95 and south of Indrio Road, with a proposed Haul Road extending from the mine north to Indrio Road across a private, shared access easement. The petition seeks to authorize mining activities for (10) years, with mining operations up to twelve (12) hours per day and six (6) days per week (Monday through Saturday). The property is located within the AG-1 (Agricultural – 1) Zoning District, within the TVC (Towns, Villages and Countryside) Future Land Use category. The proposed mine site is located at 12105 Indrio Road in northern St. Lucie County. The use is proposed under the provisions of Land Development Code (LDC) Section 3.01.03(C)(7)(i) - Mining and… p. 11
- 2.5015 St. Lucie Boulevard (Center Road) Road Paving Waiver - A site plan for the redevelopment of a specialty contractor facility located at 5015 St. Lucie Blvd. is under review by the St. Lucie County Development Review Committee (DRC). The +/-6.29 acre site is currently provided access to St. Lucie Blvd. via an easement, with proposed plans to provide for a secondary access from the site's frontage on Center Rd. to the south. Center Road is a substandard roadway, unpaved from Copart's entrance roughly 950 ft. south of St. Lucie Blvd. to the project's proposed entrance (roughly 1,300 ft.).
- A.PORT, INLET & BEACHES
- 1.Request to adopt the 2026 Port of Fort Pierce Master Plan Update - On July 1, 2025, Work Authorization No. 01 with AtkinsRealis/Kimley-Horn was executed for the 2025 (now 2026) Port of Fort Pierce Master Plan Update. Over the last sixteen (16) months, Port, Inlet & Beaches (PIB) staff, our consultants, and other regional planning representatives worked to assemble a draft master plan update that would provide the St. Lucie County Board of County Commissioners (the “Port Authority”) with a reasonable starting point for updating the previously approved 2020 Port of Fort Pierce Master Plan & Reinvestment Strategy Vision. The draft document was compiled through active participation and feedback from local/regional planning representatives from the St. Lucie County Transportation Organization (SLC-TPO), Treasure Coast Regional Planning Council (TCRPC), Fort Pierce Utility Authority (FPUA),… p. 11
- A.The Board of County Commissioners will hold an Informal meeting on Tuesday, December 8, 2026 at 9am in the Commission Chambers of the Roger Poitras Administration Annex located at 2300 Virginia Avenue, Fort Pierce, FL. p. 11
- B.The Board of County Commissioners will hold a Regular meeting on Tuesday, December 15, 2026 at 6pm in the Commission Chambers of the Roger Poitras Administration Annex located at 2300 Virginia Avenue, Fort Pierce, FL. p. 12
- A.Don’t miss the return of Breakfast with Santa on Saturday, Dec. 19 from 9 to 11 a.m. at the Fenn Center, located at 2000 Virginia Ave. in Fort Pierce. Families can enjoy breakfast, arts, crafts, holiday activities and a special visit with Santa. Admission is $10 per person and $5 for children and includes a variety of breakfast options. To register, please visit www.stlucieco.gov. p. 12
- B.St. Lucie County’s Environmental Resources Department is seeking volunteers to help with native plantings at the newly restored Indrio Savannahs Preserve on Friday, Dec. 11 and Saturday, Dec. 12 from 9 a.m. to noon. Perfect for all ages, this family-friendly project will support the long-term health and conservation of this recently restored wetland. Volunteers should wear shoes and clothing appropriate for the outdoors that you don’t mind getting wet and muddy. A re-useable water bottle, sun protection and insect repellent are also recommended. All interested volunteers are asked to register by clicking: https://www.signupgenius.com/go/4090B48ADA92AAAFA7-67762553-indrio#/ or by emailing oxbow@stlucieco.org. p. 12
- C.County offices, libraries and attractions will be closed Thursday, Dec. 24 and Friday, Dec. 25 in observance of Christmas and Friday, Jan. 1 in observance of New Year’s Day. p. 12