Agendastluciecofl.api.civicclerk.comMinutesstluciecofl.api.civicclerk.comRecording ▸stluciecofl.portal.civicclerk.comAttachmentORR Crosstown Parkway Segment 2B RIF Bond ReleasAttachmentFIL Summary - B&H Specialty ConstructionAttachmentCost Estimate_v1AttachmentFIL - B&H Specialty Construction - SIGNEDAttachmentInterlocal Agreement between the County and the AttachmentP1MC Potable Water Agreement_10.6.26AttachmentP1MC Resolution- SR 70 Infrastructure_accept ownAttachmentP1MC Landowner LLC SunbizAttachment9-8-26 Informal P1 Motor ClubMeeting page ↗stluciecofl.portal.civicclerk.com
4 items on this agenda match the land-use topicsWater & sewer (2), Site plans (2), Industrial land (1)
Agenda items (36)Show all 36
- 1.…Ridge Ranches LLC (developer) entered into a Partial Road Impact Fee Credit Agreement on August 5, 2025, for certain improvements to a portion of Crosstown Parkway extending from Station 100+31 to Station 183+38, identified as Crosstown Parkway Extension 2B. This road is under the jurisdiction of the City of Port St. Lucie. The work covers approximately 8,307 linear feet of roadway, extending from Sundance Vista Boulevard west to Range Line Road. Oak Ridge Ranches LLC has completed the Crosstown Parkway Extension 2B improvements and Port St. Lucie accepted ownership and maintenance responsibility on July 27, 2026, under Resolution 26-R63. As part of the project conditions, bonding was required to provide security for a portion of the project cost. Impact Fee credits have not been given at this time. The applicant has requested that the Board of County Commissioners release the bond in… p. 6
- 2.…of Sidewalk Construction - The applicant received Site Plan approval through the County on October 16, 2025. The project is located in an industrial park with frontage on Commercial Circle, located north of Angle Road and on the west side of Kings Highway. Per Land Development Code Section 7.05.04.1: All residential developments required to obtain site plan approval located within the Urban Service Boundary and all non-residential developments above 6,000 square feet located within the unincorporated area of St. Lucie County and within the Urban Service Boundary are required to design and construct sidewalks within the right-of-way of all streets and roadways that abut or lie within the perimeter of the property. Commercial Circle is a County-owned roadway, and the developer is required to construct concrete sidewalks within the right-of-way of all abutting streets. Per Land Development … p. 7
- 3.…agreement to identify maintenance responsibilities of portions of a County road and drainage rights-of-way being modified for a site plan previously approved by the County. The CDD will be modifying the drainage along Glades Cut Off Road as a result of the construction phasing and improvements to the roadway network associated with the Oak Ridge Ranches Development. The modification includes additional culverts and re-routing of drainage to accommodate roadway improvements along Glades Cut Off Road Right-of-Way, specifically west and east of the Prominence Way intersection, located west of the existing intersection of Glades Cut Off Road and Range Line Road. As these modifications are requested by and primarily serve the development's interests, the CDD will be responsible for the maintenance and repair of the drainage ditch alongside the roadway within the limits of the improvements. p. 7
- 1.…The Utility Extension Policy was adopted on May 19, 2015, and requires connection fees to be paid for each proposed ERC/ERIC connected to the system. Those fees represent the customer’s proportionate share of the anticipated capital cost of expanding, oversizing, acquiring, or constructing utility facilities needed for new or additional use. At the conclusion of the informal meeting Board discussion, the Board directed staff to negotiate a water service agreement with P1 Motor Club based on uniform calculations under the current adopted policies as well as directed staff, within the next year, to update the adopted policy framework to provide for additional options in the future. Since the informal meeting, P1 Motor Club has update