Indian River County, FL · pop. 164K
Tue19May9:00 AM
Board of County Commissioners
Tue May 19, 9:00 AM · Board of County Commissioners Chambers, 1801 27th Street, Vero Beach · 6 months ago
Board of County Commissioners Meeting
Agendaindianrivercofl.api.civicclerk.comMinutesindianrivercofl.api.civicclerk.comRecording ▸indianrivercofl.portal.civicclerk.comMeeting page ↗indianrivercofl.portal.civicclerk.com
4 items on this agenda match the land-use topicsHousing (1), Infrastructure (1), Data centers & plants (1), Moratoriums (1), Comp plan (1)
Agenda items (50)Show all 50
- F.Presntation on Affordable Housing
- D.…436379-2-54-01 for the widening of 66th Avenue from a two-lane roadway to a four-lane divided highway, extending from 69th Street to CR-510/85th Street. The project, with an estimated total cost of $15,708,271.04, includes Construction Engineering and Inspection (CEI) services funded through FDOT’s Transportation Regional Incentive Program (TRIP). The approved TRIP grant amount is $7,000,000.00, with the County responsible for the remaining $8,708,271.04. As required by the TRIP Agreement, the County procured a FDOT-prequalified consultant to perform CEI services through a Request for Qualifications (RFQ) process. On March 28, 2023, the Board awarded CEI services to Consor Engineers, LLC for a lump sum amount of $2,998,953.39, covering a construction duration of 600 days. On January 28, 2025, the Board approved Amendment No. 1, which addressed construction delays and extended the… p. 2
- G.…Services (IRCDUS) owns and operates the Hobart Water Production Facility (WPF) and Oslo WPF, located at 7751 58th Avenue, Vero Beach and 1550 9th Street SW, Vero Beach, respectively. The water production facilities utilize bulk chemical storage tanks to ensure adequate on-site chemical storage for all treatment needs. IRCDUS utilizes sodium hypochlorite for disinfection in compliance with state and federal drinking water regulations. Sodium hypochlorite must be stored in approved, properly rated containment tanks that meet current safety and regulatory standards. The Department has identified the need to replace three (3) existing 6,500-gallon sodium hypochlorite bulk storage tanks at the Hobart Water WPF due to structural failure, and to replace one (1) 5,500-gallon Sodium Hypochlorite bulk storage tank at the Oslo Water Production Facility, consistent with the America’s Water… p. 2
- iii.Ordinance Authorizing the Extension of a Temporary Moratorium on Zoning Changes and Comprehensive Plan Amendments in the Oslo Corridor Study Area (Legislative) - At its May 20, 2025 meeting, the Board of County Commissioners (BCC) identified the need for comprehensive planning and regulatory updates tailored to the Oslo Corridor, a high-interest development area currently lacking cohesive land use designations and design standards consistent with the County’s long-term vision. To support a structured and coordinated planning approach, the BCC adopted an ordinance imposing a one-year temporary moratorium on zoning changes and comprehensive plan land use amendments within the unincorporated portions of Indian River County designated as the Oslo Corridor Study Area. The one-year temporary moratorium will expire June 17, 2026, and it is requested by staff to extend the temporary moratorium… p. 2