Santa Rosa County, FL · pop. 194K
Thu23Jul8:30 AM
Commission Regular Meeting
Thu Jul 23, 8:30 AM · BOCC Boardroom, 6495 Caroline St, Milton · 4 months ago
Agendasantarosacofl.api.civicclerk.comRecording ▸santarosacofl.portal.civicclerk.com
Minutesnot posted yet
Meeting page ↗santarosacofl.portal.civicclerk.com1 item on this agenda matches the land-use topicsRezoning (1)
Agenda items (21)Show only the 1 matching
- 1)Prayer - Pastor David Lewis of New Life Baptist Church p. 1
- 2)Pledge
- 3)Agenda Approval
- 1)Navarre Rotary Club National Drowning Prevention Week p. 1
- 1)Additional "Direct Control" Area in District 2 Pursuant to SRC Code Section 4-37 in Response to a Resident Petition - Approval to consider an Additional "Direct Control" Area in District 2 Pursuant to SRC Code Section 4-37 in Response to a Resident Petition p. 1
- 2)Amendments to SRC Code Section 17-36 to Update Right-of-Way Permitting and Right-of-Way Construction Regulations - Approval to consider Amendments to SRC Code Section 17-36 to Update Right-of-Way Permitting and Right-of-Way Construction Regulations p. 1
- 1)Public Input - Online Form
- 1)Check Register - Approval of the check register from June 29, 2026 through July 12, 2026.
- 2)Minutes - Approval of the minutes from the May 21, 2026 and June 11, 2026 BOCC Regular Meetings.
- 3)Community Services - Opening Doors Northwest Florida Support Letter - Approval of a letter of support for Opening Doors of Northwest Florida to be submitted with their funding application. p. 1
- 4)Commissioner Smith - NOAA Atlas 15 - Approval to begin process of adopting NOAA Atlas 15 as the stormwater design standard upon future adoption by the Florida Department of Transportation.
- 5)Commissioner Eddington - Towing Illegally-Parked Vehicles - Approval to direct staff to bring back any specific actions required to initiate towing of illegally-parked vehicles located upon county-owned properties.
- 6)Administration - Task Order for Distributed Wasterwater Treatment Unit Installation - Approval of a task order to OnSyte Performance, Inc. under the Master Services Agreement dated July 25, 2024 to conduct septic conversions to Distributed Wastewater Treatment Units (DWTU) funded through Northwest Florida Water Management District grant agreement No. 26-074. p. 2
- 7)Engineering – Mayo Park Pond Creek Bank Stabilization FWC Agreement - Approval of FWC Contract No. 25121 for reimbursement of construction costs for east bank stabilization not to exceed $375,000 and authorize the chairman to sign all related documents. p. 2
- 8)Environmental - Navarre Beach Utility Admin Office Roof Replacement - Approval of an Omni cooperative agreement with Edwards Roofing in the amount of $57,596.59 for the roof replacement at Navarre Beach Utilities Administrative Office and authorization for the chairman to sign all related documents. p. 2
- 9)Public Safety - Behavorial Health Transportation Plan - Approval to renew Santa Rosa County's Behavioral Health Transportation Plan as required by statute.
- 10)Facilities - Cooperative Contract with Edwards Roofing for Santa Rosa County Sheriff's Office/Jail - Approval of an Omni cooperative agreement with Edwards Roofing in the amount of $639,776 to install fluid-applied roofing at the Santa Rosa County Sheriff's and Jail facility and authorization for the chairman to sign all related documents. p. 2
- 11)Facilities - Event Requests - Approval of the following event requests: Pace High Band Boosters requests approval for a road closure on Norris Road, Chumuckla Highway, Pace Road, and Pace Patriot Boulevard from 10:00 AM to 8:00 PM on December 5, 2026 (Rain Date: December 12th) for the Pace Christmas Parade. Navarre Krewe of Jesters requests approval for a road closure on Gulf Boulevard from Indiana Street to Navarre Beach Marine Park from 1:00 PM to 3:00 PM on January 30, 2027 for the 41st Annual Navarre Krewe of Jesters Mardi Gras Parade.
- 12)OMB - Amendment to the Agreement with Jacobs Engineering Group, Inc. - Approval of Amendment No. 1 to the Agreement with Jacobs Engineering Group, Inc., for RFQ 26-009, Santa Rosa County Wastewater Consulting Engineering Services, to add contract term and renewal provisions with no change to compensation, and authorization for the chairman to execute all related documents. p. 2
- 13)OMB - Task Order 3 for RFQ 24-048 Sheriff's Administrative Complex Design - Approval of Task Order # 3 for RFQ 24-048 Sheriff's Administrative Complex Design with Grace Design Studios, LLC in the amount of $597,465.68 for completion of the 100% design submittal and authorization for the chairman to sign all related documents. p. 2
- 1)Upcoming Meetings - July 23 @ 5:00 PM Commission Special Rezoning Board Meeting August 6 @ 7:30 AM Blackwater SWCD Board Meeting 3927 Hwy 4, Ste 102, Jay, FL 32565 August 11 @ 8:30 AM Commission Committee Meeting August 13 @ 8:30 AM Commission Regular Meeting August 13 @ 5:00 PM Zoning Board Meeting August 19 @ 5:00 PM Aviation Advisory Committee August 25 @ 8:30 AM Commission Committee Meeting Tiger Point Community Center, 1370 Tiger Park Ln, Gulf Breeze, FL 32563 August 27 @ 8:30 AM Commission Regular Meeting August 27 @ 5:00 PM Commission Special Rezoning Board Meeting