St Lucie County, FL · pop. 344K
Tue4Aug6:00 PM
Board of County Commissioners
Tue Aug 4, 6:00 PM · 4 months ago
Board of County Commissioners Regular Meeting
Agendastluciecofl.api.civicclerk.comMinutesstluciecofl.api.civicclerk.comRecording ▸stluciecofl.portal.civicclerk.comMeeting page ↗stluciecofl.portal.civicclerk.com
6 items on this agenda match the land-use topicsSite plans (4), Planned developments (2), Comp plan (1), Water & sewer (1), Subdivisions (1), Rezoning (1)
Agenda items (42)Show only the 6 matching
- A.Resolution No. 2026-142 — Recognizes the New Worlds Reading Program and commends The VanDuzer Foundation in St. Lucie County, Florida. - It has been requested that this Board recognize the New Worlds Reading Program and commends The VanDuzer Foundation in St. Lucie County, Florida. The attached resolution has been drafted for that purpose. p. 5
- A.Board of County Commissioners minutes for the BOCC Budget Workshop Day 1 Meeting of July 8, 2026. p. 5
- A.WARRANTS
- 1.Warrant Lists 42 - 43 p. 5
- B.AIRPORT
- 1.Federal Aviation Administration (FAA) Grant 3-12-0023-044-2026 & 3-12-0023-045-2026 Acceptance Improve Runway 10R Safety Area Phase 1 & 2 (512 feet Culvert) Construction - Total $1,934,897.89 - Currently at the Airport, there is a large and deep drainage ditch located in the approach end of the main runway 10R. This ditch is in the runway safety area by +/- 10 feet. This is the construction phase of the project to put in an aircraft-rated culvert over the ditch, which was least expensive option rather than moving the entire ditch along with extensive permitting from South Florida Water Management District, Fort Pierce Farms Water Control District, and Army Corp of Engineers. The Federal Aviation Administration (FAA) Grant is for 95% of the Construction Costs $1,838,152.00 with the 5% County Match of $96,744.83 required. The FAA funding is being provided in 2 grants: $1,509,104.21 FY26… p. 5
- 2.Florida Department of Transportation (FDOT) Public Transportation Grant Agreement (PTGA) FM 453381-1 Airport Layout Plan (ALP) and Master Plan Update for $500,000.00 - The Airport is in need of an updated Master Plan to guide the future growth, development, and Capital Improvement Projects. The last Master Plan update was completed in 2018 and the Airport Layout Plan (ALP) was completed in 2024. Per FDOT and FAA, in order to be eligible for grant funds, a project must either be in the Master Plan or Airport Layout Plan (ALP). p. 6
- 3.Florida Department of Transportation (FDOT) Public Transportation Grant Agreement (PTGA) FM 458538-1 Maintenance and Operations Building Design $350,000.00 - This project will be the design phase of a new airport maintenance and operations building. The new building will provide office space for operations staff, as well as bays for equipment and vehicles. The current maintenance building can be rented out for additional airport revenue since it has direct runway access. p. 6
- C.COUNTY ATTORNEY
- 1.Second Amendment - Nineteenth Judicial Circuit Contractual Services Agreement for Drug Testing Services in Problem-Solving Courts - Contract Renewal - This Agreement specifies the duties and obligations of the Circuit and St. Lucie County related to drug testing services to problem-solving court participants within the Circuit for the benefit of the State Court System. These services are provided on an as-needed basis and in accordance to standards adopted by the Circuit. This Second Amendment to Contract 1900CZ4/C24-01-074 serves as renewal option 1 of 3 and shall begin on 06/30/2026 and expire on 06/30/2027. p. 6
- D.Environmental Resources p. 6
- 1.Petravice Preserve Submerged Land Lease - On March 23, 2021 the Board of County Commissioners awarded Bid 21-024 for development of several preserve amenities through the Land Water Conservation Fund (LWCF) at the Petravice Preserve including but not limited to a pedestrian bridge across state owned sovereign submerged lands to connect the Petravice Preserve site to the Captains Hammock Preserve. As a condition of permit approvals associated with this bridge construction, the subject sovereign submerged land lease is required to be executed as attached.
- E.FACILITIES
- 1.Light Fleet Policy Update 2026 - The light fleet policy has not been updated since 1999 and over the years there have been items added or language changed to keep us current, so we have revised and updated the policy to better meet the needs of the County. Below is a list of items to highlight some of the changes in 2026 policy. 1. Central Services name changed to Facilities Department 2. Vehicle replacement terms were added to 7 years / 72,000 miles 3. Fueling key information added: Name, ID, Miles/Hours 4. Lost Fuel key replacement cost changed from $10 to $25 5. Light Fleet Cell phone number added. It used to be a hard line phone number. 6. Consuming alcohol, illegal drugs, anything that would impair one's language ability was added 7. No smoking in vehicles has been added to the policy 8. Accident reporting responsibilities were added for the Director, employees, and Risk…
- 2.Tax Collector Interlocal Agreement #C25-09-882 - First Amendment - On September 16, 2025 the Board approved an Interlocal Agreement between the County and Tax Collector for project cost sharing and other recurring costs related to the County’s building located at 8881 US Highway 1, Port St. Lucie, FL. The County and the Tax Collector desire to amend this Interlocal Agreement to increase amounts owed by the Tax Collector for costs related to the Tax Collector's desire for additional architectural and engineering of the Tax Collector’s space renovation, pursuant to the attached proposal from Edlund, Dritenbas Binkley Architects & Associates. p. 7
- F.Office of Management &Amp; Budget
- 1.Request for Qualification (RFQ) No. 26-028 – Supplemental Construction Contractor Pre-Qualification for Community Services/Housing Division. - On May 20, 2026, responses to RFQ No. 26-028, were opened. Seven responses were received; 655 companies were notified, and 50 documents were distributed. The four shortlisted firms will be added to the current established list of pre-qualified construction contractors, to provide emergency home repairs, new home construction and general construction services, on an as-needed basis. The current list of pre-qualified construction contractors includes: KIB Construction Corp., Gentile Corp., Phoenix Pro Management, Inc., A. Thomas Construction, Inc., Habitat for Humanity St. Lucie & Okeechobee, Inc., Byrdson Services, Inc., & De La Hoz Builders, Inc. On July 7, 2026, the selection committee evaluated and ranked the proposals that were received. The… p. 7
- G.Planning &Amp; Development Services
- 1.Silver Oaks PUD (Kolter) Road Impact Fee Credit Agreement (RIFCA) for Payment-in-Lieu of Construction for Silver Oaks Drive - The Silver Oaks Planned Unit Development (PUD) received final site plan approval in 2005, followed by a Development Agreement with Lennar Homes in 2009 that established the terms and conditions for the project. As part of the approvals, the project is obligated to improve Silver Oaks Drive along the site's western frontage. The County has a drainage improvement project that requires modifications to the Silver Oaks corridor. Therefore any developer-installed improvements would be throwaway. The applicant and County Public Works Department are processing a payment-in-lieu of construction to allow the County to proceed with the referenced roadway improvements. In accordance with Section 24-264(c) of the County Code, the portion of the contribution or payment that… p. 7
- H.Property Acquisitions p. 7
- 1.Ravenswood Library - Utility Easement in favor of Florida Power & Light Company - Parcel ID 3420-800-0041-000-4 - Staff is requesting approval to grant a Utility Easement in favor of Florida Power & Light Company for the purpose of providing electrical service to the Port St. Lucie Library located at 180 SW Prima Vista Boulevard. The proposed easement will allow for the installation, operation, maintenance, repair, replacement, and access to electrical infrastructure necessary to serve the facility. The proposed Utility Easement is attached for your review and approval. The Easement has been reviewed and approved by Facilities and the County Surveyor. p. 7
- I.PUBLIC UTILITIES
- 1.Bid Waiver and Sole Source Determination FY 26-27 for Solid Waste Division - St. Lucie County Solid Waste Division uses heavy equipment and other machinery for which the purchase of parts and/or services can only be obtained from one vendor. Per the St. Lucie County Purchasing Manual, these vendors are deemed sole source. The vendors are as follows: Accent Wire Tie Andela Products Case Power & Equipment of Florida Conveyor Consulting & Rubber Corporation Crigler Enterprises Inc. eFACTOR3 LLC Florida Industrial Supply & Equipment Sales Hudson Pump & Equipment ISCO Industries Kaiser Compressor Machinex Technologies, Inc. Metta Technologies, Inc MP North America, LLC MP North America Service, LLC Nextran Truck Centers PAW Materials Rexel USA Inc. RubberEdge Specialty Fire of Boynton Beach, Fl VanDyk Baler Corp. (formerly Lubo USA). Powerscreen of Florida p. 8
- J.PUBLIC WORKS
- 1.Morningside Phase 3A Subdivision Improvement Agreement (SIA) - Final Acceptance - Renar Homes Morningside LLC (developer) entered into a Subdivision Improvement Agreement (SIA) on December 10, 2024, for construction associated with the planned unit development site plan known as Morningside Phase 3A, located within the overall Morningside PUD. Phase 3A consists of a 35 lot single family residential subdivision on approximately 8.79 acres of land in St. Lucie County, as required by the County’s level of service standards adopted in the comprehensive plan and the provisions in the County land development code (LDC). The constructed improvements to Morningside Phase 3A were periodically inspected by County staff. As-built surveys and engineering testing reports for the work were reviewed and accepted, and a certification letter by the developer’s Engineer-of-Record was provided for the… p. 8
- K.TOURISM & VENUES
- 1.Peter W. Busch Family Foundation Wild Game Dinner at the St. Lucie County Fairgrounds Fee Waiver Request - $1,650.00 - Since 2005, the Peter W. Busch Family Foundation (PWBFF) has hosted an event at the St. Lucie County Fairgrounds. This one-day event will be the organization's fifth time hosting their annual Wild Game Dinner. All proceeds from the Wild Game Dinner are donated to the PWBFF to benefit its initiatives. The event is anticipated to have 1500+ attendees. PWBFF was formed over 30 years ago in Fort Pierce, FL by Peter W. Busch. Mr. Busch believed in supporting initiatives that improve the quality of health, education, and families in his community, as well as preserving Florida's indigenous animals and landscape. The PWBFF is a 501(c)3 organization located in St. Lucie County. The organization and event meet the requirements of the St. Lucie County Use Policy for fee waivers.… p. 8
- A.COUNTY ATTORNEY
- 1.Ordinance No. 2026-019 - Amending Chapter 6, “Animals” of the St. Lucie County Code of Ordinances By Repealing and Restating Chapter 6 of the St. Lucie Code Entitled “Animals” - CONTINUED FROM JULY 21, 2026 - ADD-ON - Pursuant to Section 125.01, Florida Statutes, the Board of County Commissioners of St. Lucie County is authorized to enact ordinances for the protection of the public health, safety, and welfare. Section 828.27(2), Florida Statutes, authorizes counties to adopt ordinances relating to animal control and cruelty. The Board of County Commissioners further finds that certain provisions of Chapter 6 should be updated to remove obsolete language, clarify definitions, improve enforcement procedures, and ensure consistency with current statutory requirements and administrative practices. The Board of County Commissioners determines that adoption of this Ordinance serves a valid… p. 8
- B.Planning &Amp; Development Services
- 1.Indrio Town Center - Seeking Rezoning from AG-1 (Agricultural -1) to PRW (Planned Retail/Workplace) and Approval of a Preliminary Site Plan - THE APPLICANT HAS REQUESTED TO CONTINUE THIS ITEM INDEFINETELY - THIS ITEM IS QUASI-JUDICIAL - The proposed Indrio Town Center, submitted by Leah Heinzelmann, PLA, ASLA, of Cotleur & Hearing, Inc., on behalf of Glassman Holdings, LLC, is located north of Indrio Road between Emerson Avenue and Russakis Road. The applicant is requesting to rezone the approximately 85.29-acre site from Agricultural-1 (AG-1) to Planned Retail/Workplace (PRW) and obtain approval of a Preliminary PRW Development Plan for a phased, eight-parcel mixed-use development. The proposed development would allow up to 447,250 square feet of commercial space. Residential development would be limited to either a maximum of 92 dwelling units within vertically mixed-use or live/work… p. 9
- 2.Alco Groves Mine Conditional Use Permit - Continued from July 7, 2026 - This Item Is Quasi-Judicial - the Applicant Has Requested to Continue to the August 19, 2026 Meeting p. 9
- C.PUBLIC WORKS
- 1.Alco Groves Mine - Class II Mining Permit - This Item Is Quasi-Judicial - the Applicant Has Requested to Continue to the August 19, 2026 Meeting p. 9
- A.ADMINISTRATION
- 1.Rescheduling a Referendum Election on November 2028 for a Proposed 0.5 Percent Local Government Infrastructure Surtax - CONTINUED FROM JULY 21, 2026 - The County Administrator has discussed with the Board the need for a proposed extension to the existing 0.5 percent infrastructure surtax. Proceeds from the surtax, if approved, would be used to improve public roads, reduce traffic congestion, reduce neighborhood flooding, improve local water quality and other similar uses. Implementation of the proposed surtax requires that the Board adopt an ordinance that directs the Supervisor of Elections to schedule a referendum election to allow the qualified electors of the County to vote on the levy of the proposed surtax. On March 17, 2026, the Board adopted Ordinance No. 26-004 which scheduled a referendum on November 3, 2026, to allow the electors to consider continuing levying the 0.5 percent … p. 9
- B.Planning &Amp; Development Services
- 1.Alco Groves Mine Major Site Plan - This Item Is Quasi-Judicial - the Applicant Has Requested to Continue to the August 19, 2026 Meeting p. 9
- A.The Board of County Commissioners will hold an Informal meeting on Tuesday, August 11, 2026 at 9am in the Commission Chambers of the Roger Poitras Administration Annex located at 2300 Virginia Avenue, Fort Pierce, FL. p. 10
- B.The Board of County Commissioners will hold a Regular meeting on Wednesday, August 19, 2026 at 6pm in the Commission Chambers of the Roger Poitras Administration Annex located at 2300 Virginia Avenue, Fort Pierce, FL. p. 10
- A.Residents are reminded about Visit St. Lucie’s "Locals Only" initiative featuring exclusive deals and offers exclusive only to residents of the Treasure Coast region. From hotel discounts to attraction promos and great deals at area restaurants, these locals-only deals are designed to boost visitation during off-peak times and invite residents to experience more of what their community has to offer. This collaborative program includes a dedicated landing page with special offers available only to residents of St. Lucie, Indian River, and Martin counties. This program is available at the Florida Treasure Coast website: https://floridastreasurecoast.com/locals-only-deals. p. 10
- B.As we enter the peak of hurricane season, residents and businesses are reminded to stay storm ready. Please make sure you are trimming your trees and shrubs now before a storm threatens our area. For more information pre-register for St. Lucie County’s medical special needs and pet-friendly shelters, please visit www.readystlucie.org. p. 10