St Lucie County, FL · pop. 344K
Tue7Jul6:00 PM
Board of County Commissioners
Tue Jul 7, 6:00 PM · 5 months ago
Board of County Commissioners Regular Meeting
Agendastluciecofl.api.civicclerk.comMinutesstluciecofl.api.civicclerk.comRecording ▸stluciecofl.portal.civicclerk.comMeeting page ↗stluciecofl.portal.civicclerk.com
10 items on this agenda match the land-use topicsSubdivisions (3), Site plans (2), Water & sewer (2), Rezoning (2), Planned developments (2), Comp plan (2)
Agenda items (72)Show all 72
- 2.…2026-108 - Authorizing the County Administrator to Execute Affordable Housing Program Lien Satisfactions, Releases, and Subordinations - St. Lucie County administers various affordable housing programs that provide financial assistance to eligible residents and households. As a condition of receiving assistance, program participants may be required to execute a mortgage, lien, deferred payment loan agreement, promissory note, restrictive covenant, declaration, or other security instrument in favor of the County. These instruments are typically recorded in the public records to secure compliance with program requirements, repayment obligations, affordability periods, or other terms and conditions of assistance. The County’s current program lien and mortgage documents include provisions that address remedies and administrative actions in circumstances such as bankruptcy, foreclosure, deed … p. 7
- 2.…These agreements are administrative in nature and do not independently grant development rights or replace any site plan, building permit, or other approval required by the LDC. Currently, these agreements require approval and execution by the Board of County Commissioners. If adopted, Resolution No. 2026-112 would delegate limited authority to the County Administrator, or designee, to review, approve, and execute Temporary On-Site Real Estate Sales Facility Agreements that are substantially in the form attached to the Draft Resolution. The delegated authority would apply only after the temporary facility has received all required County approvals, t p. 9
- 2.Road Impact Fee Credit Agreement 2026-007 - Kings Highway Owner LLC - Parcel ID 2301-700-0002-000-3 - At the request of the County, Kings Highway Owner LLC dedicated right-of-way for a future east/west connection, known as Road G and Whalou Way, as a condition of Plat approval. Staff has reviewed the proposal and supporting documents and found the proposed Road Impact Fee Credits meet the standards for determining eligibility in the County's Road Impact Fee Credit provisions of the Code of Ordinances Section 24-264. County staff has determined the right-of-way dedication is eligible for Road Impact Fee Credits. The right-of-way was dedicated via Plat Book 127, Page 3, and formally conveyed via Quit-Claim Deed recorded in Official Record Book 5245, Page 1198. This conveyance was granted by both SL Fort Pierce Investor, LLC and Kings Highway Owner LLC. The grantors have requested separate … p. 10
- 3.Road Impact Fee Credit Agreement 2026-008 - SL Fort Pierce Investor, LLC - Parcel ID 2301-700-0002-000-3 - At the request of the County, SL Fort Pierce Investor, LLC dedicated right-of-way for a future east/west connection, known as Road G and Whalou Way, as a condition of Plat approval. Staff has reviewed the proposal and supporting documents and found the proposed Road Impact Fee Credits meet the standards for determining eligibility in the County's Road Impact Fee Credit provisions of the Code of Ordinances Section 24-264. County staff has determined the right-of-way dedication is eligible for Road Impact Fee Credits. The right-of-way was dedicated via Plat Book 127, Page 3, and formally conveyed via Quit-Claim Deed recorded in Official Record Book 5245, Page 1198. This conveyance was granted by both SL Fort Pierce Investor, LLC and Kings Highway Owner LLC. The grantors have… p. 10
- 3.South Florida Logistics Center 95 Kings Highway Signal - Final Acceptance - SFG SFLC 95 LLC (the developer) entered into a Road Improvement Agreement (RIA) on March 20, 2023, for specific improvements to Kings Highway. These improvements included a turn lane, signal installation, and other off-site enhancements, as required by the County’s adopted level of service standards in the comprehensive plan and the provisions of the County’s Land Development Code (LDC). The improvements constructed along Kings Highway were periodically inspected by County staff. A certification letter from the developer’s Engineer-of-Record was submitted for the County’s records on July 31, 2024. In accordance with LDC Chapter 11.04.00, surety in the amount of $1,551,484.92 was provided for the developer-installed improvements. Final Acceptance: The one-year and 30‑day maintenance period concluded on July 4,… p. 12
- 4.…The Subdivision lies west of 25th Street along Juanita Avenue, bordered to the south by the C-25 canal and to the north by Fort Pierce Farms Water Control District’s Canal 1. Prior to this project, this SE portion of Harmony Heights had unimproved roads, limited drainage and inadequate stormwater management system, which discharged directly to the C25 Canal, and eventually to the Indian River Lagoon. This project significantly enhanced stormwater treatment by constructing new detention ponds, updating swale systems, and updating the unimproved roads with asphalt pavement. As a result, previously untreated stormwater is now detained and treated before being discharged. This is one of multiple drainage improvement phases scheduled for Harmony Heights, and the project achieves measurable water quality improvements both within the stormwater drainage system and the surrounding watershed.… p. 12
- 1.Indrio Groves - Rezoning to PUD and TVC Hamlet Preliminary Development Plan - THIS ITEM IS QUASI-JUDICIAL - CONTINUED FROM T HE APRIL 21, 2026 BOCC MEETING - Lennar Homes, LLC is proposing a rezoning amendment for +/-1,027 acres from AG-1 (Agricultural-1) to PUD (Planned Unit Development) & Preliminary Development Plan, for the Indrio Groves Hamlet PUD. The property has a future land use designation of TVC (Towns, Villages and Countryside). The proposed Indrio Groves TVC Hamlet PUD requires the rezoning of the subject +/- 1,027.11 acres from AG-1 (Agricultural – 1) to PUD (Planned Unit Development) and approval of the Preliminary Development Plan. This is the first application for the development of a TVC Hamlet since the option was created by amendment of the Comprehensive Plan and Land Development Code (LDC) in 2024. The Indrio Groves Preliminary Development Plan previously proposed… p. 13
- 2.Indrio Groves PUD Development Agreement - THIS ITEM IS QUASI-JUDICIAL - SECOND READING - CONTINUED FROM T HE APRIL 21, 2026 BOCC MEETING - As provided in Land Development Code Section 11.08.01., the intent of Development Agreements is to "encourage a strong commitment to comprehensive and capital facilities planning, ensure the provision of adequate public facilities for development concurrent with the impacts of development, encourage the efficient use of resources, and reduce the economic cost of development." The local code is based on Section 163.3220, Fla. Stat. 2025. Indrio Groves has a proposed petition for a TVC Hamlet PUD to rezone +/- 1,027.11 acres from AG-1 (Agricultural – 1) to PUD (Planned Unit Development) and a Preliminary Development Plan to develop up to 2,978 dwelling units, including 2,456 single-family dwellings, 214 townhomes, and 308 multifamily apartments, along… p. 13
- 3.Alco Groves Mine Conditional Use Permit - APPLICANT HAS REQUESTED A CONTINUANCE TO JULY 21, 2026 AT 6PM - Alco Groves Mine has applied for a Conditional Use Permit to mine and quarry on the west side of Interstate-95, +/- 1.5 miles south of Indrio Road. The property is in the AG-1 (Agricultural – 1) Zoning District and has the Towns, Villages, and Countryside (TVC) Future Land Use designation. Section 3.01.03(A)(7)(j) identifies Mining and quarrying of nonmetallic minerals, except fuel as a conditional use in the AG-1 Zoning District. Mining Applications in St. Lucie County are governed by LDC Section 6.06.00. through 6.06.03. and Section 11.05.11. through 11.05.13. No development applications have been processed on this particular property previously. The opening of a mine in the AG-1 (Agricultural-1) Zoning District in St. Lucie County requires three separate applications. (1) A mine … p. 13
- 1.KRE Warehouse - MJSP-2511-000144 - THIS ITEM IS QUASI-JUDICIAL - The property owners, SL Fort Pierce Investor LLC, authorized the KRE Group and representative, Bradley J. Currie, AICP of HaleyWard Inc., to petition for approval of a Major Site Plan for a 182,062 sq. ft. (4.18 acres) Warehouse with 164 standard parking spaces and 58 truck parking spaces, and drainage catchments on a 17.69 acre site within the IL (Industrial, Light) Zoning District in St. Lucie County, Florida. The site plan provides for 7.98 acres of pervious surface consisting of 1.79 acres open space, 1.17 stormwater detention, a 2.22 acre lake, 1.72 acres of Right-of-Way dedication, and 1.08 acres of drainage for Whalou Way (formerly Road G) which is currently under construction. The site is located on the east side of Kings Highway, approximately 0.12 miles north of the I-95 overpass of Kings Highway. p. 14