Borough of Barrington, NJ · pop. 7K
Tue10Nov
Borough of Barrington meeting
Tue Nov 10 · 12 days ago
Meetings
Agendabarringtonboro.comAgendaNovember Resolutions 150-161Agenda1252 Chap 296 – 2026 Stormwater Control OrdinancAgenda1255 Amending Chapter 360 – Cannabis RegulationsAgendaNovember 2026 Department Reports;AgendaResolution 11-2026-149AgendaNovember 2026 Proclamations
Minutesnot posted yet
Meeting page ↗barringtonboro.com12 items on this agenda match the land-use topicsVariances (7), Special use (4), Site plans (3)
Agenda items (17)Show all 17
- 3. Project Description and Site Plans A map (or maps) at the scale of the topographical base map indicating the location of existing and proposed buildings roads, parking areas, utilities, structural facilities for stormwater management and sediment control, and other permanent structures. The map(s) shall also clearly show areas where alterations will occur in the natural terrain and cover, including lawns and other landscaping, and seasonal high groundwater elevations. A written description of the site plan and justification for proposed changes in natural conditions shall also be provided. p. 6
- C. Nothing in this subsection shall preclude the municipality in which the major development is located from requiring the posting of a performance or maintenance guarantee in accordance with N.J.S.A. 40:55D-53. ARTICLE VIII. ARTICLE IX. SECTION 296-36 VARIANCE FROM THE DESIGN AND PERFORMANCE STANDARDS FOR STORMWATER MANAGEMENT MEASURES p. 8
- A. A variance from the design and performance standards for stormwater management measures set forth in this ordinance and the municipal stormwater management plan, provided the municipal stormwater management plan includes a mitigation plan or a mitigation plan in accordance with the conditions in this Section: p. 8
- vi. If the variance that resulted in the mitigation project being required is from the green infrastructure standards, then the mitigation project must use green infrastructure BMPs in listed in the NJDEP BMP Manual to manage an equivalent or greater area of impervious surface and an equivalent or greater area of motor vehicle surface as the area of the major development subject to the variance. Grass swales and vegetative filter strips may only be used in the mitigation project if the proposed project additionally includes a green infrastructure BMP other than a grass swale or vegetative filt… p. 9
- vii. A variance from the groundwater recharge standards may be granted if one of the following is met: (1) The average annual groundwater recharge provided by the mitigation project must equal or exceed the average annual groundwater recharge deficit resulting from granting the variance for the major development; or (2) Runoff infiltrated during the two-year storm from the mitigation project must equal or exceed the deficit resulting from granting the variance from the required infiltration of the increase in runoff volume from pre-construction to post-construction from the major development. p. 9
- viii. A variance from the stormwater runoff quality standards may be granted if the following are met: (1) The total drainage area of motor vehicle surface managed by the mitigation project(s) must equal or exceed the drainage area of the area of the major development subject to the variance and must provide sufficient TSS removal to equal or exceed the deficit resulting from granting the variance for the major development; and (2) The mitigation project must remove nutrients to the maximum extent feasible in accordance with the NJDEP BMP Manual p. 9
- ix. A variance from the stormwater runoff quantity standards may be granted if the following are met: (1) The applicant demonstrates, through hydrologic and hydraulic analysis, including the effects of the mitigation project, that the variance will not result in increased flooding damage below each point of discharge of the major development; p. 9
- 10 (2) The mitigation project discharges to the same watercourse and is located upstream of the major development subject to the variance; and (3) The mitigation project provides peak flow rate attenuation in accordance with the NJDEP BMP Manual for an equivalent or greater area than the area of the major development subject to the variance. For the purposes of this demonstration, equivalent includes both size of the area and percentage of impervious surface and/or motor vehicle surface. p. 10
- 2. Conditional principal uses. The purpose of this subsection is to set forth the requirements and procedures applicable to conditional uses in the C-2 Business Commercial District in accordance with N.J.S.A. 40:55D-67. A conditional use shall not be approved for any site unless the use is specifically approved as a conditional use in the zone for which it is proposed by the Planning Board. Conditional uses shall be permitted in the C-2 Business Commercial District as follows: p. 1
- …ing shall not be subject to this condition. (4) Notice of the application has been given, and publication made, pursuant to N.J.S.A. 40:55D-12. (5) A site plan application has been made for the lot, and the Planning Board has approved such conditional use, and the requirements and conditions of site plan/conditional use have been met. p. 1
- F. Conditional use. The purpose of this subsection is to set forth the requirements and procedures applicable to conditional uses in the M-1 Light Manufacturing and Research District in accordance with N.J.S.A. 40:55D-67. A conditional use shall not be approved for any site unless the use is specifically approved as a conditional use in the zone for which it is proposed by the Planning Board. Conditional uses shall be permitted in the M-1 Light Manufacturing and Research District as follows: (1) Authorized cannabis retail facility (Class 5 license), as defined in Ordinance No. #1145 of the Bor… p. 3
- (e) A site plan application has been made for the lot, and the Planning Board has approved such conditional use, and the requirements and conditions of site plan/conditional use have been met. p. 3
7 more passages from inside the staff reports, forms and minutes attached to this agenda are not listed as agenda items. Search finds every word of them.