Lake County, IL · pop. 711K
Thu1Oct8:30 AM
Financial & Administrative Committee
Thu Oct 1, 8:30 AM · 52 days ago
4 items on this agenda match the land-use topicsInfrastructure (2), Subdivisions (1), Housing (1)
Agenda items (7)Show only the 4 matching
- …strative October 1, 2026 Committee Agenda Report - Final *PUBLIC WORKS & TRANSPORTATION* 8.6 26-0982 Joint resolution adopting the proposed 2027-2031 Capital Improvement Program for the Lake County Department of Public Works. · The five-year Capital Improvement Program is a planning document that serves as a guide for Lake County Department of Public Works future capital improvements. · In addition, it provides a strategic approach as to how the department will address the list of capital projects and manage the associated challenges. · The Department of Public Works staff presented the Propos… p. 4
- …197 Ordinance proposing the establishment of Lake County Special Service Area (SSA) 18 and other procedures in connection therewith the Del Mar Woods Subdivision, an unincorporated area within Lake County. · The Del Mar Woods Sanitary District was created in the 1970s with the sole purpose of installing and maintaining a sanitary sewer system within the Del Mar Woods Subdivision. The district has since become dormant with no appointees and no assessment for the long term maintenance and management of the sanitary sewer system. · The creation of Lake County Special Service (SSA) 18 is the first… p. 8
- …Oaks Associates, L.P., which used the funds for the acquisition, rehabilitation and equipping of the Whispering Oaks Apartment in Waukegan to provide affordable housing, governed by Restrictive Covenants to assure compliance with federal affordable housing standards. · The bonds were supported by a credit facility from Freddie Mac, which imposed special conditions on the Restrictive Covenants. · The owner has arranged to refinance the outstanding portion of the bonds with a new loan insured by the U.S. Department of Housing and Urban Development (HUD) and HUD requires certain different special… p. 9
- …ustice Complex Expansion - Phase 2 Bridge Projects in the amount of $118,107. · As part of the Fiscal Year 2023 Capital Budget Process and Facilities Capital Improvement Plan, Depke Phase 2 Bridge Project was authorized. · Lake County Board authorized a contract with DLR Group, Inc. on October 12, 2021, for architecture and engineering services for the Depke Phase 2 Bridge Project services in the amount of $694,000. · This modification is for additional design and administrative services needed due to unforeseen site conditions and renovations needed to the mechanical, electrical, interior des… p. 11
- …ding 26. · Funding to replace this make-up air handler unit and three exhaust fans was included within the Department’s Fiscal Year 2026 budget. · An invitation to bid was issued and a sealed bid was received from one vendor. Amber Mechanical Contractors, LLC., was determined to be the lowest responsive and responsible bidder in the amount of $194,400. · The project will include the removal of the existing Weather Rite HVAC Make-up Air Handler and three Exhaust Cook ACRU Fans and includes the installation of necessary equipment, materials and labor associated with the project. · This resolutio… p. 5
- …Painting Lift Stations 26-1130 Vendor Disclosure Painting Lift Stations 26-1130 Map Lift Station Painting Attachments: 8.10 26-1131 Joint resolution authorizing execution of a contract with Archon Construction Company of Addison, Illinois, in the amount of $1,672,084 for the Base Bid and Alternate #1 Bid for the Force Main Replacements at W Columbia Bay Road and Lakeside Drive Project. · Lake County Public Works provides sanitary sewer service to portions of unincorporated Avon Township and portions of unincorporated Lake Villa Township. · The sanitary sewer force mains located along Lakeside… p. 6
- Financial & Administrative October 1, 2026 Committee Agenda Report - Final 8.17 26-1119 Resolution authorizing Contract Modification Number One to FGM Architects, Westchester, Illinois to provide architectural and engineering design and construction administration support services for the Multiple Department Building on the County campus in Libertyville, Illinois, in the amount of $2,746,416. · The Lake County Board authorized a contract with FGM Architects for architecture and engineering services in October 2025 for the Multiple Department Building in the amount of $1,184,559. · The original… p. 10