City of Fort Wayne, IN · pop. 266K
Tue25Aug12:00 PM
Board of Public Works
Tue Aug 25, 12:00 PM · 3 months ago
Board of Public Works Meeting
Agendafortwaynein.api.civicclerk.comMinutesfortwaynein.api.civicclerk.comRecording ▸fortwaynein.portal.civicclerk.comMeeting page ↗fortwaynein.portal.civicclerk.com
2 items on this agenda match the land-use topicsSubdivisions (1), Water & sewer (1)
Agenda items (23)Show only the 2 matching
- 1.Approval of Board of Public Works Minutes for the week of August 18, 2026. p. 1
- 2.Approval of Resolution #113-8-25-26-1, Lease Agreement between the City of Fort Wayne by and through the Fort Wayne Police Department and the Southgate Plaza Company for a ten-year lease at a rate of $10.00 per year. p. 1
- 3.Approval of Resolution #113-8-25-26-2, Purchase Agreement between the City of Fort Wayne and Jack Gallmeyer for 3 properties on Broadripple Dr for a total of $22,500.00 p. 1
- 4.Approval of Resolution #113-8-25-26-3, for the Warranty Deed between the City of Fort Wayne and Orchard on Wallen for Fee Simple Right of Way along West Wallen Rd. p. 1
- 5.Approval of Resolution #113-8-25-26-4, for the Perpetual Sidewalk Easement Agreement between the City of Fort Wayne and CASS Housing for a sidewalk located at 426 Constance Ave. p. 1
- 6.Approval of Professional Services Agreement between the City of Fort Wayne and Catalyst Public Affairs for advisement, representation and coordination. Compensation for services performed shall not exceed $65,000.00. p. 1
- 7.Approval of Professional Services Agreement between the City of Fort Wayne and Wessler Engineering for WO #77698, North Maumee Lift Station Improvements. Compensation for services performed shall not exceed $98,600.00. p. 1
- 8.Approval of Professional Services Agreement between the City of Fort Wayne and CE Solutions for WO #67647, Cedarville Emergency Spillway Existing Structural Condition Assessment Study. Compensation for services performed shall not exceed $14,950.00. p. 1
- 9.Approval of Service Agreement between the City of Fort Wayne and Enpira Inc. for Energy Bill Data Management Software as a Service. Compensation for services performed shall not exceed $85,000.00. p. 1
- 10.Approval of Water Contract #2025-W-0447, Shadowood Lakes Section III between the City of Fort Wayne and Shadowood Lakes Section III to construct a local Water system. This project is privately and publicly funded and located outside the City. Contract value is $139,867.87. p. 1
- 11.Approval of Water Contract #2025-W-0001, Everdeen Section II between the City of Fort Wayne and Everdeen Development to construct a local water system. This project is privately and publicly funded and located outside the City. Contract value is $163,365.60. p. 1
- 12.Approval of recommendation from Transportation Engineering to award #0764D, Alley East/West: Rivermet Ave, Lake Ave, Tesumseh St and Oneida St to Shannon Concrete in the amount of $80,633.00. p. 1
- 13.Approval of recommendation from Transportation Engineering to award #0934D, Alley North/South: Baxter St, McKinnie Ave, Bowser Ave and Oliver St to Shannon Concrete in the amount of $105,740.00. p. 1
- 14.Approval of recommendation from City of Fort Wayne to award #113-3-17-26-4, 2026 Asphalt Patching Package 4 Local and Collector Streets to Brooks Construction in the amount of $390,489.00. p. 2
- 15.Approval of Owner-Contractor Agreement #1107N, Oxford Streetscape Phase I & II Lafayette to Oliver between the City of Fort Wayne and E & B Paving in the amount of $3,464,056.93. p. 2
- 16.Approval of Owner-Contractor Agreement #67331, Coldwater and Covington Tank Rehabilitation between the City of Fort Wayne and Seven Brothers Painting in the amount of $1,995,600.00 p. 2
- 17.Approval of Subdivision Plat for Roosevelt Reserves Section II. The plat consists of 30 lots and is located in Adams Township, Section 29. p. 2
- 18.Acceptance of the work performed by S&S Directional Drilling for #67030, Garden Lane: Hazelhurst to Highland Waterworks On-Call as an integral part of the City’s water distribution system.
- 19.Acceptance of the work performed by Crosby Excavating for #111-10-15-24-1, Harrison Street Urban Trail Main St to Washington Blvd as an integral part of the City’s transportation system. p. 2
- 20.Acceptance of the work performed by Fleming Excavating for #2025-W-0137, Traditions of Aboite Offsite Water Main Extension as an integral part of the City’s water distribution system. p. 2
- 21.Acceptance of the work performed by Fleming Excavating for #2026-S-0034, West Till Rd as an integral part of the City's sanitary sewer system. p. 2
- 22.Approval of Civil City Accounting Claims in the amount of $6,843,349.18 for the week of August 19, 2026. p. 2
- 23.Approval of City Utilities Accounting Claims in the amount of $3,169,509.18 for the week of August 25, 2026. p. 2