GovMeet
Sign in
Mon16Nov4:00 PM

Design Review Committee

Mon Nov 16, 4:00 PM · Eastern Flank Event Facility, 1368 Eastern Flank Circle, Franklin · 6 days ago

This agenda in plain words

Leer en español

This is a meeting of the Design Review Committee in Franklin, Tennessee, on Monday, November 16, 2026, at 4:00 PM at the Eastern Flank Event Facility. The committee will talk about eight building and design requests, mostly for properties around downtown Franklin. The agenda does not say that any decision will be made at this meeting.

  1. Talk about awnings and signs at 234 Public Sq. The applicant is Tanya Hembree. Touches: Owners and neighbors of 234 Public Sq.. p. 1
  2. Talk about building changes and a new addition to the main building at 932 W. Main St. The applicant is Jenna Lee. Touches: Owners and neighbors of 932 W. Main St.. p. 1
  3. Talk about building changes at 113 2nd Ave. S., St. Philip Catholic Church. The applicant is Carlos Zarraga Jr. Touches: St. Philip Catholic Church and neighbors of 113 2nd Ave. S.. p. 1
  4. Talk about an addition and changes to the main building at 418 Boyd Mill Ave. The applicant is Jacob Layne. Touches: Owners and neighbors of 418 Boyd Mill Ave.. p. 1
  5. Talk about building changes and a canopy addition at 408 Church St. The applicant is Eric McGinnis. Touches: Owners and neighbors of 408 Church St.. p. 1
  6. Talk about the construction of a bridge over the Harpeth River at E. Main St. and Franklin Rd. The applicant is Greg Gamble. Touches: People who use E. Main St. and Franklin Rd., and the Harpeth River area. p. 1
  7. Talk about changes to three buildings (1-3) already approved at 209 Liberty Pike, The Middle Eight. The applicant is Greg Gamble. Touches: The Middle Eight project at 209 Liberty Pike. p. 1
  8. Talk about new construction at 234 and 242 5th Ave. N. The applicant is Brandon Priddy. Touches: Owners and neighbors of 234 and 242 5th Ave. N.. p. 1
Words on this agenda, explained
Applicant
The person or company asking the committee to approve or review a plan for a property.
Principal building
The main building on a property, as opposed to smaller buildings like sheds or garages.
Alterations
Changes made to an existing building, such as new doors, windows, or walls.
Canopy
A roof-like cover over an entrance or walkway, held up by posts or attached to a building.
Revisions
Changes to a plan that was already approved.

Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.

Agenda items (8)