City of Gig Harbor, WA · pop. 12K
Tue1Dec1:30 PM
Hearing Examiner Hearings
Tue Dec 1, 1:30 PM · 3510 Grandview St, Gig Harbor · in 9 days
Hearing Examiner
Agendagigharborwa.api.civicclerk.com
Minutesafter the meeting
Meeting page ↗gigharborwa.portal.civicclerk.comAdd to calendar.ics for Outlook, Google, AppleThis agenda in plain words
Leer en españolThis is a public hearing before the Gig Harbor Hearing Examiner, held in the Council Chambers and online by Zoom or phone. The main item is a request to build an assisted living and memory care facility on a 4.46-acre undeveloped site, with public comment allowed during the hearing.
- A request to build an assisted living and memory care facility of about 94,680 square feet, with 83 units (71 dwelling units and 12 sleeping units), on about 4.46 acres of undeveloped land that has two Category IV wetlands. Touches: Neighbors near 72nd and Wagner Way, where the site is located and where car access and walking paths would connect..The public may speak p. 1
Words on this agenda, explained
- Public hearing
- A meeting time set aside so the public can speak about a request before a decision is made.
- Hearing Examiner
- The person who holds the hearing on this request and reviews it.
- Category IV wetlands
- A type of wetland the agenda says is on the site.
- Sleeping units
- Rooms for residents that the agenda counts separately from dwelling units.
- Frontage improvements
- Work done along the edge of the property next to the street, such as sidewalks.
- Onsite stormwater detention
- A place on the property that holds rainwater runoff for a time so it does not flood nearby areas all at once.
Written by AI from the agenda, Nov 20. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
1 item on this agenda matches the land-use topicsSpecial use (1)
Agenda items (1)Show all 1
- 5. Close public hearing New Business MALLARDS 7 ASSISTED LIVING FACILITY - PL-SPR-19-0003, PL-CUP-19-0001, PL-ALP-19-0002: The proposal is for the development of an approximately 94,680 square foot Assisted Living and Memory care facility containing a total of 83 units -71 dwelling units and 12 sleeping units. The site is approximately 4.46 acres of undeveloped land and contains two Category IV wetlands. The project proposes onsite stormwater detention, parking, landscaping and pedestrian paths connecting to frontage improvements on 72nd and Wagner Way. Automobile access would also be provided… p. 1