- A.Award the lowest responsive and responsible bid for the Sandstone Hills (Remediation) Project to Johner & Sons Inc. at a total amount of $271,194.50. - The Sandstone Hills Street Repairs (Remediation work) is in the proposed 2027 budget with a total of $520,000 from the Streets Fund. The bid includes curb, gutter, sidewalk, and alternates for full-depth asphalt patching with a mill and overlay or full-depth asphalt replacement to make corrections to work that was completed a couple of years ago. HDR will be performing construction administration on the project. The low bid is within the proposed budget, so a supplement will not be required unless some or all of the work is completed in 2026. Three bids were opened on August 19th, 2026. HDR Engineering has recommended that the bid be awarded to Johner & Sons Inc, the low bidder, in the amount of $271,194.50 for Option B, full-depth… p. 1
- B.Award the lowest responsive and responsible bid for the Downtown Mill & Overlay project to Johner & Sons Inc. at a total amount of $348,662.45. - The Downtown Mill & Overlay project is not in the 2026 budget and so will require a supplement. The work includes a mill-and-overlay of existing asphalt on Main Street from Jackson Boulevard to Grant Street as directed by the City Council on April 20, 2026. Because mill-and-overlay projects trigger compliance with the Americans with Disabilities Act (ADA), the work will include necessary curb ramp replacement and pedestrian push-button upgrades. Our consultant, DGR, completed the design and will be performing construction administration on the project. Three bids were opened on August 19th, 2026. DGR Engineering has recommended that the bid be awarded to Johner & Sons Inc., the low bidder, in the amount of $348,662.45 . Below is a table of the … p. 1
- C.Approve the Final Under/Over Change Order #1 for the Annual Crosswalks, Stop Bar, and Turn Arrow Painting with a $0 increase and a $4,233.30 decrease, for a net decrease of $4,233.30 and Certificate of Final Completion and Acceptance dated 08/26/2026. - The annual painting of our crosswalks, stop bars, and turn arrows is complete. The original bid estimated using 326.1 gallons of paint to complete the project. Some of the items listed were thermoplastic and did not require painting, and some of the items were being painted as part of other active construction projects. This change order reflects the actual quantity of paint used to finish the project, 285 gallons. The change order results in a decrease in contract price of $4,233.30. p. 1