Utility Advisory Committee Meeting
Agendarichlandwa.api.civicclerk.comAttachmentRES CWP REPORT-September 2026
Minutesnot posted yet
Meeting page ↗richlandwa.portal.civicclerk.com1 item on this agenda matches the land-use topicsMobile homes & RV (1), Subdivisions (1)
Agenda items (8)Show only the 1 matching
- 1.Approval of July 14, 2026 Utility Advisory Committee Meeting Minutes p. 1
- 2.Status of Each Utility (10 Minutes) p. 1
- 3.Public Works Solid Waste Rate Analysis (30 Minutes) - The Public Works Director will provide an update on future recommendations from a rate analysis for the Solid Waste utility. The City's consultant, FCS-Bowman, will present the recent results of the revenue requirement in its rate analysis. A big driver for potential near-term rate increases is the existing net cash flow deficiency. In 2026 the utility has budgeted approximately $12.9 million in revenues (of which $12.6 million are considered rate revenue), and $14.7 million in total utility expenses. The utility has a healthy fund balance ($11.7 million as of the end of 2025) and can therefore use balance to cover the near-term shortfalls. However, if the utility wants to not only cover necessary capital but also bring in a positive cash flow, rate increases are needed. A 20% increase in 2027 (April-December implementation) and a…
- 4.Amended 2026 Energy Resource Plan (10 Minutes) - The City of Richland operates an electric utility, Richland Energy Services (RES), which serves more than 25,000 electric customers. As a "full requirements customer" of the Bonneville Power Administration (BPA), as defined in RCW 19.280.020(7), RES is required to submit a Resource Plan to the Washington State Department of Commerce every two years. A Resource Plan provides a forecast of the electrical resources needed to meet RES customers' projected energy requirements over a ten-year planning horizon, excluding potential New Large Single Loads (NLSLs). Future NLSL customers will be responsible for securing their own non-federal power resources. BPA wholesale power is expected to remain the lowest-cost resource through at least 2028. Accordingly, RES's forecasted energy needs are expected to be met primarily through BPA resources,…
- 5.Electric Rate Analysis Impact From BPA Expedited BP-27 Rate Case (30 Minutes) - BPA has initiated an expedited rate case to recover $250M in costs resulting from a U.S. District Court of Oregon order requiring additional spill at the lower eight mainstem federal Columbia and Snake River Dams. The additional Court-Ordered Operations Rate Adder (COORA) spill began March 2026 with BPA identifying the additional spill costs to translate into an increase in wholesale rates of approximately 6.3%. BPA’s final Record of Design on the BP-27 rate case is scheduled to be completed December 18, 2026 with a proposed $220M settlement impact from COORA and a 5.4% effective annual increase to associated Tier 1 rates. Wholesale power costs are attributed to approximately 60% of Richland Energy Services expenses, with labor, materials, and debt service comprising the remaining major expenses. Labor and… p. 1
- 6.2025 Fuel Mix for City of Richland Wholesale Power - Attached is the 2025 fuel mix for the City of Richland's wholesale power purchases. Overall, the City's 2025 fuel mix was 88% from carbon free resources. The 2025 fuel mix includes electric generation from the following resources: 77.92% from hydroelectric 9.95% from nuclear -0.03% from "other biogenic" which is how WA Dept of Commerce categorizes energy to/from a battery energy storage system (BESS) and not actual generation. 0.52% from solar 11.64% as unspecified market purchases by BPA to meet the load following requirements of the City and other public power utilities.
- 7.…One is working on the renewal and replacement projects with work currently occurring on Carriage Hills Subdivision and is expected to be complete before the end of November. Renewal and replacement work has been completed on Gala Way, Hills Mobile Home Park, Leslie Feeder 144 on Rachel Road, and Merrill’s Addition. Another contractor has demobilized from Thayer Substation until spring 2027 when BPA has finished its transmission rebuild work.
- 8.Forward Agenda - The forward agenda includes the following items: Jan - Ruby Flats Solar Potential 10MW PPA (RES) Mar - Electric Reliability Statistics (RES) Mar - Energy Density Rate Recommendation (RES) May - Indexed Electric Rates Discussion (RES) May - AMI Time of Use (TOU) and Demand Rate Discussion (RES) July - 2028 Capital Work Budget Discussion (RES) Sep - Key Performance Indicators (RES) Nov - Tour Dallas Road Substation (RES)