City of Richland, WA · pop. 62K
Tue15Sep6:00 PM
City Council
Tue Sep 15, 6:00 PM · Richland City Hall ~ Council Chambers, 625 Swift Boulevard · 2 months ago
City Council Regular Meeting
Agendarichlandwa.api.civicclerk.comMinutesrichlandwa.api.civicclerk.comAttachmentResolution No. 2026-124AttachmentProposed Turner & Townsend Heery Consultant AgreAttachmentResolution No. 2026-132AttachmentEasement Relinquishment PresentationAttachmentResolution No. 2026-126AttachmentProposed Annexation Map (Molt)AttachmentOrdinance No. 2026-21AttachmentResolution No. 2026-129AttachmentResolution No. 2026-133AttachmentEasement Relinquishment PresentationMeeting page ↗richlandwa.portal.civicclerk.com
6 items on this agenda match the land-use topicsSubdivisions (2), Infrastructure (2), Surplus land (2), Annexation (1)
Agenda items (25)Show all 25
- 6.…The conveyances are described below: Property along the south boundary of Lots 15 and 16, Block 1, First Addition to Island View Plat, conveyed by quitclaim deed under Auditor’s File No. 599132. Property along the south boundary of Lot 15, Block 2, First Addition to Island View Plat, conveyed by quitclaim deed under Auditor’s File No. 2008-034044. Property along the south boundary of Lot 16, Block 2, First Addition to Island View Plat, conveyed by quitclaim deed under Auditor’s File No. 2008-034050. Property along the south boundary of Lots 15 and 16, Block 4, and Block 3, First Addition to Island View Plat, conveyed by quitclaim deed under Auditor’s File No. 2008-034052. Property along the south boundary of Lot 1, Block 7, First Addition to Island View Plat, and Lots 5 and 6, Second Addition to Island View Plat, conveyed by quitclaim deed under Auditor’s File No. 2008-034048. Property… p. 1
- 8.…Police Station Capital Project - The City’s 2026-2031 Capital Improvement Plan includes a project titled “Richland Police Station” (the “Project”). The Project will partially renovate the City-owned property and structure located at 1200 Jadwin Avenue for use as a police station, replacing the City’s existing facility. The Project requires an Owner’s Representative to assist the City in obtaining progressive design-build contracting authority from the Washington State Capital Projects Advisory Review Board and to provide day-to-day project administration support. A competitive Request for Qualifications (RFQ) process was conducted in accordance with the City’s purchasing policies to solicit architectural and engineering (A&E) services for the Project. The City received three (3) responses to the RFQ. Turner & Townsend Heery, LLC was selected as the most qualified consultant to provide… p. 2
- 10.…2026-126, Setting a Meeting Date to Consider the Proposed Annexation of 4.78 Acres of Property Known as Lot 1 and Lot 2 of Short Plat No. 3663 (Molt) - Under Chapter 35.13 RCW, annexation by petition is a multi-step process. Before a formal annexation petition may be circulated, the initiating parties must provide written notice to the City of their intent to commence annexation proceedings. The notice must be supported by either at least 10 percent of the residents of the proposed annexation area or owners representing at least 10 percent of the assessed value of the property within the area. RCW 35.13.125. Within 60 days after receiving the notice, the City Council must meet with the initiating parties. At that meeting, Council determines whether to accept, reject, or geographically modify the proposed annexation, whether the City will require the annexed area to assume its… p. 2
- 12.…The 2025 - 2030 Capital Improvement Program includes the Sanitary Sewer Lift Stations Rehabilitation and Replacement Project (the “Project”), which will repair and replace components of existing sewer lift stations to improve system reliability, safety, and efficiency. The construction phase of the Project is eligible and well-suited for financing through Ecology’s Water Quality Combined Funding Program. Staff recommends applying for low-interest financing through Ecology’s Water Quality Combined Funding Program for the Project. If approved, the financing would provide a cost-effective funding source for the planned improvements and reduce financing costs ultimately borne by City ratepayers. Staff recommends adoption of Resolution No. 2026-129. p. 2
- 20.…RCW 35.94.040 establishes the process for disposing of surplus property originally acquired for public utility purposes. On September 13, 2026, notice was duly published that a public hearing would be held on September 15, 2026 to take public testimony regarding this surplus action. Staff recommends adoption of Resolution No. 2026-132. p. 3
- 21.…RCW 35.94.040 establishes the process for deposing of surplus property originally acquired for public utility purposes. On p. 3