City of Bismarck, ND · pop. 74K
Thu20Aug3:00 PM
Special Assessment Commission
Thu Aug 20, 3:00 PM · Bismarck City Public Works Waterworks West Conference Room · 3 months ago
Special Assessment Commission Meeting
Agendabismarcknd.api.civicclerk.comMinutesbismarcknd.api.civicclerk.comMeeting page ↗bismarcknd.portal.civicclerk.com
1 item on this agenda matches the land-use topicsAnnexation (1)
Agenda items (22)Show only the 1 matching
- John Lundby, Chairman Tammy Dolan, Member Abby Ritz, Member
- Gabe Schell, City Engineer Ryan Skor, Director of Finance Linda Oster, Assistant City Engineer Heidi Belohlavek, Engineering Technician Eric Lund, Comptroller Katie Petrou, Senior Accountant Jadon Schulz, Accountant
- To hold a public hearing on objections, if any, to special assessment improvement districts. Determine the amount of benefit and assess, against each lot and parcel, its proportionate share of the cost of the work. Prior to this hearing, subject assessment lists were published once each week for two consecutive weeks. p. 1
- I.Call to Order & Introduction Introduction of Special Assessment Commission Members and City Staff p. 1
- II.Approval of Meeting Minutes p. 2
- III.Public Comment
- IV.Review Of And Hearings On Improvement Districts p. 2
- A.Street Improvement District No. 583 Nature of Improvements: 2025 City-wide Street Lighting *Unit #1: Crest Road – 160’ west of Crest Place to Cul-De-Sac High Creek Place – 190’ west of High Creek Road to Cul-De-Sac Assessment: Per lot Residential: $2,155.47 *Unit #2: Crested Butte Road – 64 th Avenue NW to 100’ south of Limited Lane Limited Lane – Crested Butte Road to 140’ east Heritage Ridge Road – Crested Butte Road to 100’ north of Collective Lane Community Loop – 100’ north of Collective Lane to Sonora Way Sonora Way – 64 th Avenue NW to 100’ south of Collective Lane Collective Lane – 140’ east of Community Loop to Sonora Way Assessment: Per lot Residential: $2,590.85 *Unit #3: Mehrer Drive – 140’ north of Holmes Drive to Fettig Drive Orgaard Drive – Fettig Drive to 100’ south of Fettig Drive Koenig Drive – Holmes Drive to 100’ south of Fettig Drive Smette Bend – 100’ east of… p. 2
- B.Street Improvement District No. 586 Nature of Improvements: Scrub Seal Project with 25% Subsidy *Unit #1: High Creek Road – 180’ north of Ranch Loop to Valley Drive Ranch Loop – High Creek Road to Mustang Drive Mustang Drive – High Creek Road to Valley Drive Crest Circle – High Creek Road to Cul-de-sac Crest Road – High Creek Road to 130’ west Round Top Road – High Creek Road to 120’ east High Creek Place – High Creek Road to 200’ west *Unit #2: Walter Way – Coleman Street to 150’ south of Lone Peak Drive Lone Peak Drive – Walter Way (N) to Walter Way (S): *Unit #3: Frost Lane – Roosevelt Drive to Hitchcock Drive Doubleday Drive – 110’ east of Northrop Drive to Hitchcock Drive Butterfield Drive – Doubleday Drive to Hitchcock Drive Northrop Drive – Doubleday Drive to 525 feet south of Hitchcock Drive Meigs Drive – Northrop Drive to 170’ east Hitchcock Drive – Roosevelt Drive to 210’ east …
- C.Street Improvement District No. 590 Nature of Improvements: Construct New Pavement *Unit #1: Hamilton Street – Century Avenue to 150’ South of Century Avenue Assessment: Per lot Residential: $68,394.38 (1 lot) Per square foot Commercial: $2.1788 Term: 15 years Total Assessed and Financed: $205,183.14 p. 3
- D.Water Improvement District No. 334 Nature of Improvements: Watermain Extensions *Unit #1: Hamilton Street – Century Avenue to 165’ South of Century Avenue Assessment: Per square foot Commercial: $0.3680 Term: 15 years Total Assessed and Financed: $104,031.36 p. 3
- E.Street Improvement District No. 591 Nature of Improvements: Construct New Pavement *Unit #1: Vermont Avenue – Burlington Drive to 370’ East Assessment: Per lot Residential: $14,344.04 (1 lot) Per square foot Commercial: $1.9186 Term: 15 years Total Assessed and Financed: $294,604.49 p. 4
- F.Sanitary Sewer Improvement District No. 585 Nature of Improvements: Sanitary Sewermain Extensions *Unit #1: Vermont Avenue – Burlington Drive to 380’ East Assessment: Lots 4-5, $5,269.58 - Cost of 1/3 a manhole and cost of pipe adjacent to lot Lot 12, $26,551.37 - ½ the project cost less Lots 4-5 cost Lots 1-2, $26,551.37 - ½ the project cost less Lots 4-5 cost, equally divided among the 16 parcels occupying that lot. Term: 15 years Total Assessed and Financed: $58,372.32 p. 4
- G.Sewer Improvement District No. 586 Nature of Improvements: Construct Local Storm Sewer *Unit #1: Vermont Avenue – Burlington Drive to 350’ East Assessment: Per square foot Commercial: $.3141 Term: 15 years Total Assessed and Financed: $427,624.80 p. 4
- H.Water Improvement District No. 335 Nature of Improvements: Watermain Extensions *Unit #1: Vermont Avenue – Burlington Drive to 400’ East Assessment: Lot 12, $64,170.12 - ½ the project cost Lots 1-2, $64,170.12 - ½ the project cost, equally divided among the 16 parcels occupying that lot. Term: 15 years Total Assessed and Financed: $128,340.24 p. 4
- I.Continuous Districts Nature of Improvements: Park fees assessed to property that was outside of the city limits at the time of construction. The districts are for the parcel’s share of the cost in established special assessment districts that the parcel would have been assessed had the parcel been annexed at the time the district was created. *Park Improvement District No. 200 (70 parcels) $114,433.74 Term: 15 years Assessment Basis *Based on Per Lot: Residential @ 1.0 factor Commercial @ 2.0 factor **Based on square feet: Residential @ 1.0 factor Commercial @ 2.0 factor p. 4
- V.Determine Benefit of Improvement Districts p. 5
- VI.Confirmation Of Assessment Lists p. 5
- VII.Upcoming Proposed Policy Changes Half Cent Sales Tax Eligible Roadways - Water Main and Sanitary Sewer Assessments Adjustment of factors for small parcels
- VIII.Next Meeting
- IX.Other Business
- X.Adjourn