City of Fayetteville, AR · pop. 95K
Tue10Nov5:30 PM
Water, Sewer and Solid Waste Committee
Tue Nov 10, 5:30 PM · 113 W. Mountain Street, Fayetteville · 12 days ago
Water, Sewer & Solid Waste Committee (Immediately Following City Council Agenda Session)
Agendafayettevillear.api.civicclerk.comAttachmentCobblestone RJN MemoAttachmentCobblestone Attorney LetterAttachmentAmendment #2 to OPW Fire Hydrant ContractAttachmentCost Share Agreement Kessler
Minutesnot posted yet
Meeting page ↗fayettevillear.portal.civicclerk.com3 items on this agenda match the land-use topicsSubdivisions (1), Water & sewer (1), Infrastructure (1)
Agenda items (11)Show all 11
- D.3.Sewer Cost Share Request – Cobblestone Homes - Cobblestone Homes has requested a cost share for off-site sewer upgrades that were required for the Brooklands at Mountain Ranch Phase 5 Subdivision project. Approximately 572-feet of 8-inch diameter existing sewer line required upsizing to 12-inch diameter based on hydraulic analysis of the existing system and proposed development impact. The upgrades have already been installed by the developer, with a reported total cost of approximately $272,000.00. City Staff has informed Cobblestone Homes that this work does not qualify for a cost share request, but the applicant has requested a chance to hear from the Water & Sewer Committee. FOR DISCUSSION
- D.4.…a contract with OPW Commercial Services of Arkansas, LLC (OPW) in the amount of $47,000.00 for the painting of approximately 1,000 fire hydrants in Fayetteville's water service area. Resolution 177-26, approved on August 4, 2026, approved Amendment No. 1 to add an additional 1,000 fire hydrants to be painted. OPW has indicated its willingness to paint an additional 2,000 fire hydrants for the same unit price and both the City and OPW desire to amend the contract to provide for this additional scope of work. The additional 2,000 fire hydrants would be painted at the cost of $94,000.00 , for a total cost of $188,000.00 for the painting of approximately 4,000 fire hydrants through the original contract and its two amendments. The same contract terms would apply for the additional scope of work. STAFF REQUESTS THIS ITEM BE FORWARDED TO THE CITY COUNCIL WITH A RECOMMENDATION FOR APPROVAL p. 2
- D.5.…The City currently operates an aging 8-inch diameter waterline along South Cato Springs Road just south of the Fulbright Expressway interchange. This section of waterline creates a bottleneck to other 12-inch and 18-inch diameter lines feeding through the Kessler Regional Park up to the Kessler Ground Storage Tanks. With South Cato Springs Holdings, LLC, working with competent contractors in the immediate vicinity, this cost share will allow the City to realize cost savings and efficiencies compared to a stand-alone contract. Engineering design and permitting was recently completed by Crafton, Tull & Associates, Inc. (RFQ# 25-01). South Cato Springs Holdings, LLC has provided contractor pricing in-line with engineering estimates from a qualified utility contractor. Since this work is not required due to development and has been requested by the utility, the City would contribute 100% of … p. 3