- Webinar ID: 818 7281 2456 Registration Link: https://fayetteville-ar.zoom.us/webinar/register/WN_yh9ukXbtQuCinlVlrFgF5Q p. 2
- C.1.Overview of August’s Water & Sewer Operations - Tim Nyander – Utilities Director
- C.2.Overview of August’s WRRF Monthly Operations - Scott Murphy – WRRF Project Manager, Inframark
- D.3.Goshen Water Ground Tank Rehabilitation - Bid Award - This project will remove and replace the exterior and interior coatings on the 300,000-gallon Goshen Water Tank. While the coatings are removed, upgrades to safety climbing systems will be made to align with modern standards. At the same time, the outdated mechanical exterior tank volume indicator will be removed. On Thursday, August 13, 2026, the City of Fayetteville accepted sealed competitive bids for this project. McGuire Iron, Inc submitted the lowest bid. All bids are shown here: McGuire Iron, Inc $356,000.00 Dixie Painting & Sandblasting, Inc. $359,675.00 Kimery Painting, Inc. $408,755.00 Viking Painting, LLC $472,255.00 JL Bryson Inc $669,339.00 Staff recommend awarding Bid 26-47 and approving a construction contract with McGuire Iron, Inc. in the amount of $356,000 for painting and rehabilitation of the 300,000-gallon Goshen …
- D.4.Highway 612 Utility Relocations – Engineering Contract Amendment - ARDOT has notified the City of Fayetteville to relocate water infrastructure in the vicinity of the Highway 264 and Primrose Lane intersection in Springdale, AR. ARDOT is planning a new section of Interstate 612 (also called the Springdale Bypass) to connect to Highway 412 near Beaver Lake. After receiving this notification, a formal selection committee was held on November 6, 2025, at which McClelland Consulting Engineers was selected for contract negotiations (RFQ 25-01, Selection 17). The project scope includes relocation of approximately 1,800 linear feet of 36-inch and 1,800 linear feet of 42-inch water transmission line. Due to necessary realignments, it is estimated the total length of the replacement will be up to 8,000 linear feet. Preliminary engineering due-diligence and alignment selection is ongoing under… p. 3
- D.5.RJN Sewer Collection Master Plan – Amendment No. 2 - On September 2, 2025, the City of Fayetteville formally selected RJN Group, Inc. via RFQ 25-01 to develop a scope and fee for the City’s Wastewater Collection System Master Plan. Staff have worked with RJN to develop a comprehensive scope for flow monitoring, inflow/infiltration analysis, and model update, calibration, and validation activities to support CIP planning and optimization based on Fayetteville’s growth and densification. The Arkansas Department of Health, and industry best practices, recommend updating master plans every 5 years for systems like Fayetteville experiencing significant change and growth. The last update to this plan was completed in 2020. Wastewater flow monitoring was completed in the Spring of 2026 and model calibration and updates are underway. Amendment No. 1 was approved administratively to provide…
- D.6.Noland Sludge Blowers – Bid Award - The solids that are wasted from the biological units at the Noland plant are placed in a holding tank prior to dewatering. Aeration is something that has been desired to keep the sludge from going septic while being stored. Aeration is planned in the Noland upgrade, but this is an item that the Utility would like to work on installing before the Noland construction gets under way. The first item would be to purchase a blower package, consisting of 3 positive displacement blowers, valves, switches, connectors, and all other appurtenances as required. Bid 26-50 was opened on September 2, 2026, with the following results: Environmental Technical Sales $365,976 Instrument & Supply $438,600 Haynes Pump & Process $457,092 Newman Regency Group $497,100 Environmental Technical Sales, Inc., of Little Rock submitted the lowest and best bid, and staff recommends …
- F.7.The next Water, Sewer, & Solid Waste Committee meeting will be held on Tuesday, October 13th, 2026, at 5:30 p.m. p. 5