Meeting page ↗imperial.granicus.com11 items on this agenda match the land-use topicsRezoning (6), Special use (6), Comp plan (3)
Agenda items (12)Show all 12
- …or construction and operation of the proposed North Star 2 Project. The parcel is currently zoned S-2 (Open Space Preservation) and is proposed to be rezoned to S-2-RE (Open Space Preservation with Renewable Energy Overlay) to operate a 130-megawatt (MW) solar photovoltaic (PV) energy generation facility with an integrated 175-megawatt (MW) Battery Energy Storage System (BESS). The proposed project would be located on an approximately 614-acre area. The project estimates a water demand of 7.2 acre-feet to 10.8 acre-feet, on average, during a 12-to 18-month construction period, for a total cons… p. 1
- …tar 2 Project Final Initial Study Mitigated Negative Declaration (ISMND) that includes review of Mitigation Monitoring & Reporting (MM&RP) Program, a Conditional Use Permit (CUP #22-0030), a General Plan amendment (GPA #25-0004), a Zone Change (ZC #22-0007), and an additional Conditional Use Permit (CUP #26-0004) for the construction and operation of a groundwater well. The parcel is currently zoned S-2 (Open Space Preservation) and is proposed to be rezoned to S-2-RE (Open Space Preservation with Renewable Energy Overlay) to operate a 130-megawatt (MW) solar photovoltaic (PV) energy generatio… p. 1
- …of the proposed project. This project will be located on an approximately 614-acre area currently zoned S 2 (Open Space Preservation), proposed to be rezoned to S-2-RE (Open Space Preservation with Renewable Energy Overlay) at 3016 E US Hwy 78, Brawley, CA, property identified under Assessor’s Parcel Numbers (APN) 039-140-013-000 and 039- 140-014-000 and further described as W2 & W2 OF E2 SEC 36 13-16 460.82 AC EXC S 200FT and E2 OF E2 SEC 36 13-16 153.94AC EXC S 200FT; County of Imperial; State of California (Supervisory District #4), [Luis Bejarano, Planner II, 442-265-1736, or via email at… p. 2
- …f Supervisors adopt the Mitigation Monitoring & Reporting Program (MMRP) for the North Star 2 Solar and Battery Storage Project. 2d. Consideration of General Plan Amendment #25-0004: APEX Energy Solutions, LLC is proposing a General Plan Amendment (GPA #25-0004) for the construction and operation of the North Star 2 Solar and Battery Storage Project. The parcel is currently zoned S-2 (Open Space Preservation) and is proposed to be rezoned to S-2-RE (Open Space Preservation with Renewable Energy Overlay) to operate a renewable energy project. The proposed General Plan Amendment (GPA #25-0004) w… p. 2
- 1. Recommend the Board of Supervisors approve General Plan Amendment #25- 0004 for the North Star 2 Solar and Battery Storage Project. p. 2
- PLANNING COMMISSION AGENDA 2e. Consideration of Zone Change #22-0007: APEX Energy Solutions, LLC is proposing a Zone Change (ZC #22-0007) for the construction and operation of the North Star 2 Solar and Battery Storage Project. The parcel is currently zoned S-2 (Open Space Preservation) and is proposed to be rezoned to S-2-RE (Open Space Preservation with Renewable Energy Overlay) to operate a renewable energy project. The proposed Zone Change (ZC #22-0007) would incorporate the project area into the Renewable Energy overlay. The proposed project would be located on an approximatel… p. 3
- 1. Recommend the Board of Supervisors approve Zone Change #22-0007 for the North Star 2 Solar and Battery Storage Project. 2f. Consideration of Conditional Use Permit #22-0030: APEX Energy Solutions, LLC has submitted a Conditional Use Permit Application (CUP #22-0030) for the construction and operation of a 130-megawatt (MW) solar photovoltaic (PV) energy generation facility with an integrated 175-megawatt (MW) Battery Energy Storage System (BESS). The proposed project would be located on an approximately 614-acre area. The project consists of 5 primary components: (1) 130-megawatt (MW) solar… p. 3
- 1. Recommend the Board of Supervisors approve Conditional Use Permit #22-0030, subject to all the conditions of approval for the North Star 2 Solar and Battery Storage Project. 2g. Consideration of Conditional Use Permit #26-0004: APEX Energy Solutions, LLC has submitted a Conditional Use Permit Application (CUP #26-0004) for the construction and operation of a groundwater well that will serve for the construction and maintenance of a 130-megawatt (MW) solar photovoltaic (PV) energy generation facility with an integrated 175-megawatt (MW) Battery Energy Storage System (BESS). The proposed proj… p. 3
- 1. Recommend the Board of Supervisors approve Conditional Use Permit #26-0004, subject to all the conditions of approval for the North Star 2 Solar and Battery Storage Project. 3a. Consideration of Final Environmental Impact Report (FEIR SCH #2025101397) and Findings, of the Heber 1 Parasitic Solar Energy Project Final Environmental Impact Report (FEIR) that includes review of Mitigation Monitoring & Reporting (MM&RP) Program and Conditional Use Permit (CUP). The applicant proposes to develop a 20 megawatt (MW) solar energy facility and interconnecting cable line (gen-tie line) that would prov… p. 4
- 1. Recommend the Board of Supervisors adopt the Mitigation Monitoring & Reporting Program (MM&RP); and, 3c. Consideration of Conditional Use Permit (CUP) #25-0010 as submitted by Heber Field Company, which includes a 20-megawatt solar facility to provide parasitic energy to the existing Heber 1 geothermal plant. The project is located on parcel identified as APN 059- 020-001-000. This parcel was environmentally assessed under CUP #25-0010 (SCH #2025101397) for the construction and operation of a parasitic solar facility. This proposed p. 4
- 1. Recommend the Board of Supervisors approve Conditional Use Permit #25-0010. 4a. Consideration of the Addendum to 2002 Final Environmental Impact Report/Environmental Impact Statement (State Clearinghouse No. 1998121054), which includes the environmental evaluation of Western Mesquite Mines’ proposed Consolidated Reclamation Plan Amendment (RP) #24-0001 for the Rainbow East Exploration Project. The project consists of temporary mineral exploration activities followed by reclamation of approximately 2.34 acres of surface disturbance on Bureau of Land Management administered lands located imme… p. 5