Butte County, CA · pop. 208K
Tue25Aug9:00 AM
County Board of Supervisors
Tue Aug 25, 9:00 AM · Board of Supervisors Chambers, 25 County Center Drive, Suite 205, Oroville · 3 months ago
Board of Supervisors Meeting
Agendabuttecoca.api.civicclerk.comMinutesbuttecoca.api.civicclerk.comRecording ▸buttecoca.portal.civicclerk.comMeeting page ↗buttecoca.portal.civicclerk.com
3 items on this agenda match the land-use topicsSpecial use (2), Subdivisions (1)
Agenda items (48)Show all 48
- 1.…Everest Infrastructure Partners Telecommunication Facility Conditional Use Permit (UP25-0003) - Appeal of the Planning Commission's approval of Conditional Use Permit (UP25-0003) for Verizon Wireless & Everest Infrastructure Partners, for the proposed construction and operation of a new unmanned wireless communications tower. The project includes a 100-foot-tall monopole, with an additional 5-foot lightning rod, for a total of 105 feet, nine panel antennas mounted on the tower, along with supporting communication equipment, including a microwave antenna, GPS antenna, and related electronic equipment. The project will also include a fenced 50-foot equipment area containing two ground-mounted equipment cabinets, utility equipment and a fiber connection. Additionally, there is a proposed 30-kilowatt emergency backup generator with a 203-gallon diesel fuel tank and a new driveway providing… p. 9
- 2.…- Appeal of Hurleton West Telecommunication Facility Conditional Use Permit (PROJ-25-0006) - Appeal of the Planning Commission's approval of Conditional Use Permit (PROJ-25-0006) for Vertical Bridge, LLC., for the proposed construction and operation of a 100-foot-tall wireless telecommunications monopine tower on a 4.91-acre parcel located at 77 Weger Road. The project is located 1,400 feet north of Forbestown Road, in the unincorporated community of Hurleton, east of Oroville (Assessor Parcel Number: 072-190-038). The tower and associated equipment would be located within a 2,500-square-foot (50' x 50') enclosed lease area and secured by an 8-foot-tall chain-link fence with green privacy slats. Project construction includes the underground installation of electrical service from an existing utility pole located approximately 290 feet east of the site, which requires trenching along… p. 10
- 3.…In addition, two new PRDs were established for FY 2026-27: Moon Tower Estates Subdivision, Zone 6, and Orchardcrest Estates Subdivision, Zone 7. County Administration recommends the Board adopt the proposed parcel service charges as laid out in Exhibit A of the Resolution. Service charges are posted online at: FY-2026-27-Parcel-Charges---County-Service-Areas-and-Pe p. 11