Butte County, CA · pop. 208K
Tue28Jul9:00 AM
County Board of Supervisors
Tue Jul 28, 9:00 AM · Board of Supervisors Chambers, 25 County Center Drive, Suite 205, Oroville · 4 months ago
Board of Supervisors Meeting
Agendabuttecoca.api.civicclerk.comMinutesbuttecoca.api.civicclerk.comRecording ▸buttecoca.portal.civicclerk.comMeeting page ↗buttecoca.portal.civicclerk.com
3 items on this agenda match the land-use topicsSpecial use (2), Subdivisions (1)
Agenda items (64)Show all 64
- b.…Elections and Ballot Measures With the November 3, 2026 Statewide General Election - Pursuant to Elections Code section 10403, elections called by a district, city, or other political subdivision can be consolidated with a statewide election. The Clerk-Recorder's Office received requests from 36 local jurisdictions, as detailed in the staff report, to consolidate elections for city and town councils, governing boards, and board of directors, along with three ballot measures, with the Statewide General Election scheduled for November 3, 2026. Each jurisdiction has submitted a resolution requesting consolidation, which specifies the exact ballot measures or offices to be included on the November 2026 ballot. The Department recommends the Board of Supervisors approve the consolidation of elections, along with three ballot measures, with the November 3, 2026 Statewide General Election. p. 2
- 1.…- Appeal of Hurleton West Telecommunication Facility Conditional Use Permit (PROJ-25-0006) - Appeal of the Planning Commission's approval of Conditional Use Permit (PROJ-25-0006) for Vertical Bridge, LLC., for the proposed construction and operation of a 100-foot-tall wireless telecommunications monopine tower on a 4.91-acre parcel located at 77 Weger Road. The project is located 1,400 feet north of Forbestown Road, in the unincorporated community of Hurleton, east of Oroville (Assessor Parcel Number: 072-190-038). The tower and associated equipment would be located within a 2,500-square-foot (50' x 50') enclosed lease area and secured by an 8-foot-tall chain-link fence with green privacy slats. Project construction includes the underground installation of electrical service from an existing utility pole located approximately 290 feet east of the site, which requires trenching along… p. 17
- 2.…Everest Infrastructure Partners Telecommunication Facility Conditional Use Permit (UP25-0003) - Appeal of the Planning Commission's approval of Conditional Use Permit (UP25-0003) for Verizon Wireless & Everest Infrastructure Partners, for the proposed construction and operation of a new unmanned wireless communications tower. The project includes a 100-foot-tall monopole, with an additional 5-foot lightning rod, for a total of 105 feet, nine panel antennas mounted on the tower, along with supporting communication equipment, including a microwave antenna, GPS antenna, and related electronic equipment. The project will also include a fenced 50-foot equipment area containing two ground-mounted equipment cabinets, utility equipment and a fiber connection. Additionally, there is a proposed 30-kilowatt emergency backup generator with a 203-gallon diesel fuel tank and a new driveway providing… p. 17