City of New Brighton, MN · pop. 23K
Tue24Nov6:30 PM
City Council
Tue Nov 24, 6:30 PM · 803 Old Highway 8 NW, New Brighton · in 2 days
City Council Meeting
Agendanewbrightonmn.api.civicclerk.comAttachmentZoning Review Project Intro and Work Plan PresenAttachmentUpdated Staff ReportAttachmentEngineering MemoAttachmentPublic Safety MemoAttachmentFire Marshal MemoAttachmentDRAFT ResolutionAttachmentPresentation Slides (as of 11-19-26)AttachmentZoning MapAttachmentMailing MapAttachmentArchitectural DrawingsAttachmentEngineering PlansAttachmentApplicant's NarrativeAttachmentPreliminary PlatAttachmentALTA Survey
Minutesafter the meeting
Meeting page ↗newbrightonmn.portal.civicclerk.comAdd to calendar.ics for Outlook, Google, Apple5 items on this agenda match the land-use topicsSubdivisions (2), Special use (2), Variances (2), Site plans (1), Comp plan (1)
Agenda items (20)Show all 20
- 1.…Achieving all of the above goals will require approval of a preliminary plat, final plat, site plan review, one variance, and a conditional use permit. Public hearings for all items will be held by the Planning Commission and City Council in November, and items will be finalized and readied for decisions at subsequent meetings (PC on 12/15/26 and CC on 1/12/27).
- a.Preliminary Plat and Final Plat: dividing off land for the new Clubhouse and Apartment Building
- b.Variance: due to the unique nature of the golf course needing visibility, a variance is requested from the minimum building frontage requirement along Silver Lake Road. p. 2
- c.Conditional Use Permit: required to authorize the proposed reconfiguration of the Grace Point Church parking lot. p. 2
- 1.Zoning for Housing -- base districts review introductory discussion - Breanne Kennedy from Thrive LLC will join us on November 24th to provide an introduction to the planning process we will be following in the coming months to review each of the City's base residential zoning districts to identify existing barriers to housing. Results from this work will be reflected in the comprehensive plan update (due in 2028), and within an ordinance for eventual implementation. p. 2