Agendasgcityutah.govMinutessgcityutah.govAgenda2026.06.18 Agenda - Work MeetingAgenda2026.06.18 Amended AgendaMinutesMinutes 01MinutesMinutes 01Minutes2026.06.18 - Budget HearingMinutes2026.06.18 FY27 Notice of Public Hearing - UnbiMinutes2026.06.18 FY27 Notice of Public Hearing - EnteMinutes2026.06.18 Public HearingsPacket2026.06.18 Agenda Packet - Regular MeetingPacket2026.06.18 Agenda Packet - Work MeetingPacket2026.06.18 AMENDED Agenda Packet - Regular MeetMeeting page ↗sgcityutah.gov
2 items on this agenda match the land-use topicsRezoning (2), Planned developments (2)
Agenda items (16)Show only the 2 matching
- a. Consider approval to award WRX Contracting the Curlv Hollow PumDtrack RFP. BACKGROUND and RECOMMENDATION: This pump track is one feature in the upcoming Curly Hollow Adventure Park. The plans are in final review currently and a bid will be advertised for the entire park soon. The pump track requires specialization, and an RFP was issued separately in order to obtain a qualified contractor. Contractors were asked to submit a design and construction proposal maximizing the use of $175,000 in grant funds. Four submissions were received and scored. WRX Contracting scored the highest in the eval… p. 1
- b. Consider award of bid to Suncore for the construction of Slick Rock Substation. BACKGROUND and RECOMMENDATION: The award of this bid is for the construction of Slick Rock Substation, which is required to accommodate the increasing electrical demand within the surrounding service area. The Bid closed on June 5, 2026 and six bids were received. Bids were evaluated and staff recommends award of bid to Suncore in the amount of $991,710. p. 1
- c. Consider approval to purchase a Pierce Manufacturing 1,500 GPM Type 1 fire engjne/pumper through Siddons-Martin Emergency Group (Regional Pierce Vendor). BACKGROUND and RECOMMENDATION: This request is for an additional fire apparatus utilizing a national cooperative purchasing contract HGAC FS12-23 p. 1
- …. Staff from the Fire and Fleet departments have been working on specifications over the past several months and the apparatus will be similar to the fire apparatus that have been purchased in the past and apparatus currently on order with Pierce Manufacturing. The City has a long history with Pierce Manufacturing spanning over 36 years. Staff recommends purchasing the Pierce Manufacturing 1,500 GPM Type 1 fire engine/pumper from Siddons-Martin Emergency Group in the amount of $1,195,908.38. Pricing for the apparatus came in at $1,368,516.00, the city received a discount of $174,607.62 for the… p. 2
- …ll, Inc. for the purchase of new golf carts for city golf courses. BACKGROUND and RECOMMENDATION: in January 2026 the City Golf Division advertised a Request for Proposals (RFP) for a new golf cart fleet for the four city courses. Of the two proposals received, Intermountain Golf Cars' proposal which includes a five-year lease of 262 new Lithium battery powered golf carts was reviewed and accepted. This lease agreement with Zion's Bank provides the financing for the new carts provided by Intermountain Golf Cars. The actual lease rate will lock in 30-days prior to closing which is expected to b… p. 4
- …aPproval of Ordinance No. 2026-050 amending the City Zoning Map by changing the zone from R-1-10 (Residential, IO,000 ft2 minimum IOt size) to PD-R (Planned Development Residential) on aPproximately 42.86 acres located generally southwest of the Gap Canyon Parkway and 1790 West intersection. (Case No. 2026-ZC-O09 - Divario PA-2 Allora Village) BACKGROUND and RECOMMENDATION: The proposal is for a multi-family project consisting of 410 townhome and apartment units with a density of 12.28 dwelling units per acre. At their meeting held on May 26, 2026, the Planning Commission held a public hearin… p. 5
- a. Consider approval to award WRX Contracting the Curly Hollow PumDtrack RFP. BACKGROUND and RECOMMENDATION: This pump track is one feature in the upcoming Curly Hollow Adventure Park. The plans are in final review currently and a bid will be advertised for the entire park soon. The pump track requires specialization, and an RFP was issued separately in order to obtain a qualified contractor. Contractors were asked to submit a design and construction proposal maximizing the use of $175,000 in grant funds. Four submissions were received and scored. WRX Contracting scored the highest in the eval… p. 1
- b. Consider award of bid to Suncore for the construction of Slick Rock Substation. BACKGROUND and RECOMMENDATION: The award of this bid is for the construction of Slick Rock Substation, which is required to accommodate the increasing electrical demand within the surrounding service area. The Bid closed on June 5, 2026 and six bids were received. Bids were evaluated and staff recommends award of bid to Suncore in the amount of $991,710. p. 1
- c. Consider approval to purchase a Pierce Manufacturing 1,500 GPM TyPe 1 fire engine/pumper through Siddons-Martin Emergency Group (Regional Pierce Vendor). BACKGROUND and RECOMMENDATION: This request is for an additional fire apparatus utilizing a national cooperative purchasing contract HGAC FS12-23 p. 1
- …. Staff from the Fire and Fleet departments have been working on specifications over the past several months and the apparatus will be similar to the fire apparatus that have been purchased in the past and apparatus currently on order with Pierce Manufacturing. The City has a long history with Pierce Manufacturing spanning over 36 years. Staff recommends purchasing the Pierce Manufacturing 1,500 GPM Type 1 fire engine/pumper from Siddons-Martin Emergency Group in the amount of $1,195,908.38. Pricing for the apparatus came in at $1,368,516.00, the city received a discount of $174,607.62 for the… p. 2
- …II, Inc. for the purchase of new golf carts for cjty qolf courses. BACKGROUND and RECOMMENDATION: inJanuary 2026 the City Golf Division advertised a Request for Proposals (RFP) for a new golf cart fleet for the four city courses. Of the two proposals received, Intermountain Golf Cars' proposal which includes a five-year lease of 262 new Lithium battery powered golf carts was reviewed and accepted. This lease agreement with Zion’s Bank provides the financing for the new carts provided by Intermountain Golf Cars. The actual lease rate will lock in 30-days prior to closing which is expected to b… p. 4
- …approval of Ordinance No. 2026-050 amending the City Zoning Map by changing the zone from R-1-10 (Residential, IO,000 ft2 minimum IOt size) to PD-R (Planned Development Residential) on approximatejy 42.86 acres located generaljy southwest of the Gap Canyon Parkway and 1790 West intersection. (Case No. 2026-ZC-O09 - Divario PA-2 Allora Village) BACKGROUND and RECOMMENDATION: The proposal is for a multi-family project consisting of 410 townhome and apartment units with a density of 12.28 dwelling units per acre. At their meeting held on May 26, 2026, the Planning Commission held a public hearin… p. 5
- …-048 vacatinq a portion of a utilities easement and drainage easement located along the rear lot line of Lot 76 of the Bloomington Country Club No. 6 Subdivision. BACKGROUND and RECOMMENDATION: The plat for Bloomington Country Club No. 6 Subdivision identifies utility and drainage easements along both the front and rear of each lot. The applicant is requesting that the utilities easement and drainage easement located along the rear property line be vacated. Vacating these easements will allow the property owner to incorporate the parcel acquired from Bloomington Country Club into the existing… p. 4
- 13. Public hearing and consideration of Ordinance No. 2026-049 vacatinq all easements on Lots 3, 4, and former Sac Street, City of St. George Industrial Park, except for the Pole Line Easement crossing Lot 3. BACKGROUND and RECOMMENDATION: The City of St. George Industrial Park subdivision plat depicts easements along the perimeter of the lots as well as easements crossing through the lots. Several of these easements cannot be accurately plotted because they are not defined by metes and bounds descriptions. Therefore, this request proposes to vacate all existing easements within the affected a… p. 5
- …-048 vacatinq a portion of a utilities easement and drainage easement located along the rear lot line of Lot 76 of the Bloomington Country Club No. 6 Subdivision. BACKGROUND and RECOMMENDATION: The plat for Bloomington Country Club No. 6 Subdivision identifies utility and drainage easements along both the front and rear of each lot. The applicant is requesting that the utilities easement and drainage easement located along the rear property line be vacated. Vacating these easements will allow the property owner to incorporate the parcel acquired from Bloomington Country Club into the existing… p. 4
- 13. Public hearing and consideration of Ordinance No. 2026-049 vacatinq all easements on Lots 3, 4, and former Sac Street, City of St. George Industrial Park, except for the Pole Line Easement crossing Lot 3. BACKGROUND and RECOMMENDATION: The City of St. George Industrial Park subdivision plat depicts easements along the perimeter of the lots as well as easements crossing through the lots. Several of these easements cannot be accurately plotted because they are not defined by metes and bounds descriptions. Therefore, this request proposes to vacate all existing easements within the affected a… p. 5