Agendasgcityutah.govMinutessgcityutah.govAgenda2026.11.05 City Council Work Meeting AgendaAgendaPublic Notice - Anasazi Hills at EntradaAgendaPublic Notice - Rillisante at DivarioAgendaPublic Notice - Leslie Dunbar TrustAgendaPublic Notice- The Palms of St. GeorgeMinutes2026.11.05 Public Notice - Budget HearingMinutes2026.11.05 Ordinances Approved and Adopted by tMinutesMinutes 01Packet2026.11.05 City Council Regular Meeting Agenda Packet2026.11.05 City Council Work Meeting Agenda PacPacket2026.11.05 City Council Work Meeting Updated AgMeeting page ↗sgcityutah.gov
1 item on this agenda matches the land-use topicsInfrastructure (1)
Agenda items (7)Show only the 1 matching
- c. Consider approval to award a bid to Ground Worx Corp. for the FY27 Reuse Crushing Operation. Background and Recommendation: This item is to award a bid for the crushing of asphalt and concrete rubble that has been deposited at the city reuse center into specified recycled aggregate and base material. Formal bids were requested and three bids were received. The low bid was received from Ground Worx Corp. in the amount of $120,281. p. 2
- …nsider approval of a Professional Services Agreement with Stanley Consultants for the construction engineering management services on the SR-7 Exit 5 Interchange. Background and Recommendation: This item is for construction engineering management services for the SR-7 Exit 5 Interchange project. Two construction engineering management proposals were received from qualified Construction Management (CM) firms to provide professional oversight of the SR-7 Exit 5 Interchange project. Based on an evaluation of proposals Stanley Consultants was selected. The proposed cost for these services is $440,… p. 2
- …3:00 p.m. The agenda for the meeting is as follows: 1. 2. 3. 4. 5. 6. 7. 8. Presentation from the Utah Food Bank. Discussion regarding owner-occupied Short-Term Rentals. Discussion regarding proposed changes to City code pertaining to Animal Control. Discussion regarding the Temporary Zoning Ordinance for blasting. Discussion regarding the FY28 Budget. Update from Department Directors. Reports from Mayor, Councilmembers, and City Manager. Request a closed meeting to discuss litigation, security, property acquisition or sale, or the character and professional competence or physical or mental he… p. 1
- 5. Public hearing and consideration of Ordinance No. 2026-083 vacating a right-of-way easement for electrical utility lines affecting Lot 1 and Parcel A of Rilassante at Divario. Background and Recommendation: A separate document granted a right-of-way easement for an electrical utility line, which is also depicted on the Rilassante at Divario subdivision plat. The electrical lines have since been relocated, and the easement is no longer necessary. The Joint Utilities Commission recommended approval. p. 3
- 6. Public hearing and consideration of Ordinance No. 2026-084 vacating a municipal utility easement affecting Lot 2 of the Leslie Dunbar Trust subdivision. Background and Recommendation: The Leslie Dunbar Trust subdivision plat identifies municipal utility easements along all lot lines. The easement proposed for vacation is located along the west lot line of Lot 2. The Joint Utilities Commission recommended approval . p. 3
- …sement affecting private roadway (common area) and utility easements on Lots 83 and 84 of The Palms of St. George. Background and Recommendation: The subdivision plat for The Palms at St. George designates the private roadways as common areas and identifies them as public utility and drainage easements. The dwellings on Lots 83 and 84 encroach into the designated private street area, and a plat amendment is being requested to adjust the lot lines to better reflect the existing conditions. The Joint Utilities Commission recommended approval . p. 3
- …a public utility easement located on Lot 31 of Anasazi Hills at Entrada Phase 1. Background and Recommendation: The Anasazi Hills at Entrada Phase 1 subdivision plat identifies Lot 31 with public utility easements along all lot lines. During the design and development of Phase 2, the boundary between the two phases was established in a manner that did not align with the Phase 1 boundary along Lot 31, leaving a small sliver of land. The owner of Lot 31 subsequently purchased this sliver and now wishes to incorporate it into Lot 31 to accommodate additional improvements. The proposed p. 3