City of Modesto, CA · pop. 219K
Wed16Sep
Tuolumne River Regional Park Citizens Advisory Committee
Wed Sep 16 · 2 months ago
Tuolumne River Regional Park Citizens Advisory Committee Meeting Agenda
2 items on this agenda match the land-use topicsComp plan (2)
Agenda items (5)Show only the 2 matching
- 2. TRRP Master Plan Update – Draft has been reviewed by staff; designer is making edits with the goal of a public meeting in fall 2026. p. 3
- 7. Security Cameras at TRRP – Contract awarded. City technicians have installed five (7) of the thirteen (13) total cameras to be installed in TRRP. The locations already installed are Hillside Drive by George Rogers Park, Tioga Drive at TRRP entrance, Mancini Park at north parking lot, Neece Drive at Boat Launch, TRRP B Parking Lot and 2 cameras at TRRP Soccer Fields. p. 3
- 9. Mancini Park Playground – New playground at Mancini Park. Design is 80% complete, public input on playground design closed in January and we received over 200 votes. Construction expected to start early 2027. 10.TRRP Gateway Temporary Event Parking – In conceptual design. Construction expected to begin in 2027. 11.Pending Grant Applications –Wildlife Conservation Board grant was not awarded. Staff are looking at a couple of other state grants for possible grant funding. TRRP CAC 09.16.26 Page 3 p. 3
- 2. TRRP Master Plan Update – Draft has been reviewed by staff; designer is making edits with the goal of a public meeting in summer 2026. p. 9
- 7. Security Cameras at TRRP – Contract awarded. City technicians have installed five (7) of the thirteen (13) total cameras to be installed in TRRP. The locations already installed are Hillside Drive by George Rogers Park, Tioga Drive at TRRP entrance, Mancini Park at north parking lot, Neece Drive at Boat Launch, TRRP B Parking Lot and 2 cameras at TRRP Soccer Fields. p. 9