City of Raymore, MO · pop. 24K
Mon22Jun6:00 PM
City Council
Mon Jun 22, 6:00 PM · City Hall, 100 Municipal Circle, Raymore, MO 64083 · 5 months ago
City Council Meeting
Agendaraymoremo.api.civicclerk.comMinutesraymoremo.api.civicclerk.comMeeting page ↗raymoremo.portal.civicclerk.com
Agenda items (21)
- A.Public Works
- B.Parks and Recreation p. 1
- C.Communications Report p. 1
- D.Finance
- E.Justice Center
- F.City Clerk - Fireworks Permits p. 1
- A.City Council Meeting Minutes, June 8, 2026 p. 1
- B.Appointment to the License Tax Review Committee - Mayor Turnbow has appointed Thomas Circo as the City Council appointment to the License Tax Review Committee. The appointment is now before the Council for approval.
- C.Broadmoor & Grandshire Drainage - Acceptance and Final Payment - The Public Works Director determined the project has been satisfactorily completed in accordance with the project specifications. p. 2
- A.Award of Contract - Recycle-in-Place Project (pg 54) - This project consists of resurfacing rural roads in Raymore with approximately 57,940 square yards of in-place rehabilitation by heating, scarifying, rejuvenating and reshaping the surface.
- B.Budget Amendment - Recycle-in-Place Project (pg 80) - Staff is seeking approval for a capital budget amendment to the Transportation Fund to enter into a contract with Gallagher Asphalt Corporation for the Recycle-in-Place Asphalt Project Number 26-505-201.
- C.Award of Contract - Good Parkway South Trail Design (pg 84) - This item is an award of contract to George Butler Associates, Inc. for the redesign of the Good Parkway South Trail. p. 2
- D.Award of Contract - Good Ranch Watershed Evaluation (pg 112) - This item is an award of contract to George Butler Associates, Inc. for the evaluation of the Good Ranch Watershed. p. 3
- E.Award of Contract - Street Light Maintenance (pg 135) - The City's network of streetlights requires regular maintenance. Staff recommends award of contract to Black & McDonald for this contract.
- F.Lofts at Foxridge Water Line Easement Vacation and Dedication (pg 158) - Recent field surveying at the Lofts at Foxridge property indicated minor discrepancies between the originally platted public water line easements and the as-built public water line. This request is to vacate the existing public water line easement and to re-dedicate a corrected water line easement on the property that aligns with the as-built water line. p. 3
- G.Award of Contract - Kurzweil Road Construction (pg 176) - The Kurzweil Road Construction project consists of the reconstruction of the asphalt surface, replacing all stormwater crossings along the corridor, and improving the roadside ditches currently in place from 155th Street to 58 Highway.
- A.Establishing a Procedure and Schedule for Establishing the Charter Review Commission (pg 241) - Raymore City Charter Section 14.8 provides that from time to time, but no less often than every ten (10) years, the Council shall provide for a Charter Review Commission to review the Charter and to recommend to the voters of the City any proposed amendments. Resolution 26-27 establishes the procedure and schedule for establishing the Charter Review Commission for the purpose of completing this review of the Charter. p. 4
- B.Award of Contract - 2026 Sidewalk Replacement Project (pg 245) - The 2026 Sidewalk Replacement Project primarily includes removal and replacement of existing sidewalks and replacing/installing ADA ramps at various locations. This project also includes the installation of a section of trail to complete the trail along Sunset Lane. p. 4
- C.Award of Contract - Owen Good Force Main Replacement Phase 2 (pg 294) - This project primarily consists of the installation of 781 linear feet of 24” force-main to replace the existing ductile iron force-main. Included in this is boring new force-main underneath Hubach Hill Road & N Cass Parkway. p. 5
- D.Award of Contract - City Hall Refresh (pg 346) - This Project consists of the removal of the existing asphalt in the front parking lot at City Hall and installation of a concrete parking lot. Included in this is the installation of a raised crosswalk at the main entrance into City Hall as well as sidewalk and curb replacement at multiple locations.
- A.Litigation matters as authorized by § 610.021 (1)