Bradford County, PA · pop. 60K
Tue18Aug
Planning Commission
Tue Aug 18 · 3 months ago
Bradford County Planning Commission Amended Agenda 8.18.26
3 items on this agenda match the land-use topicsSubdivisions (3)
Agenda items (9)Show only the 3 matching
- 4) Subdivision/Land Development Administration A.) Monthly Report: Duane Naugle, County Planning Director Sudeepthi Sunku GIS Coordinator Cadie Anderson, County Planner Apoorva Gandrala, GIS Analyst Elizabeth Burgess, Planning & Grants Administrator John E. Thompson, Esq., Solicitor Voice • 570.268 .4103 Fax • 570 .268 .4171 Email: countyplanner@bradfordcountyPA.gov ADMINISTRATIVE AGENCY FOR THE BRADFORD COUNTY PLANNING COMMISSION DEPARTMENT OF COMMUNITY PLANNING AND MAPPING SERVICES North Towanda Annex No. 1 29 VanKuren Dr., Suite 1 Towanda, PA 18848 p. 1
- …hip* 2026-071 Bruce Kennedy Smithfield Township* 2026-072 Robert & Vicki Fulmer Wysox Township 2026-073 Jeffrey & Frances Christiansen Pike Township *Subdivision for Review **Land Development for Review QUE Awaiting Municipal Review Awaiting Sanitation Review Awaiting DEP Review Other SD/LD 43 15 18 10 p. 2
- C. Visitors: C.) Subdivision Plan Reviews: New 2026-058 Mark P. Cook Trust / Wysox Township The subdivision of lands of Mark P. Cook, Trustee of the Mark P. Cook Irrevocable Real Estate Trust, is a two-lot subdivision of a 49-acre parcel. Proposed Lot A (1.15 acres) is to be a Lot Addition to adjoining lands of Bradley C. Perry and Melissa S. Perry. Lot 1 is the remaining land. It is vacant and is currently used for agricultural purposes. The surrounding parcels in this area are generally used for agricultural and residential purposes. There is no sewage collection system in the vicinity of… p. 2
- …eet” for Lot 2. Justification: Lot 2 is proposed to be served by a 50’ Access Easement. 2026-064 Dawn & Kyle Chaapel / West Burlington Township The subdivision of lands of Dawn & Kyle Chaapel is a two-lot subdivision of a 98-acre parcel. Proposed Lot 2 (31.65 acres) is vacant and currently used for agricultural purposes. Lot 1 is the remaining land. It is occupied by a house, barn, and garage, with an on-site septic system that has been inspected and water supply systems. The surrounding parcels in this area are generally used for agricultural and residential purposes. There is no sewage col… p. 3
- …et” for Lot 6 & 7. Justification: Lot 6 & 7 proposed to be served by a 50’ Access Easement. 2026-071 Bruce & Rita Kennedy / Smithfield Township The subdivision of lands of Bruce D. Kennedy and Rita Kennedy (Dec.) is a three-lot subdivision of a 199.90-acre parcel. Proposed Lot A (8.00 acres) is to be a Lot Addition to adjoining lands of Bruce & Rita Kennedy. Proposed Lot 6 (63.96 acres) is vacant and has percolation testing as shown for a proposed three-bedroom house. Percolation testing has been performed as shown on the plan for a residential system of one EDU (400g/day). Proposed Lot 7 (6… p. 4
- …ion Needed: Applicant seeking Final Approval. Hunt Engineers has submitted a letter of satisfaction with the as-built plans. 2026-007 PAL115 Tarbox Solar Project (Canton) / Canton Township: PIVOT is proposing to construct a 3-megawatt photovoltaic solar generating project and associated necessary infrastructure on land that is currently, and has historically been, used for agricultural operations. The project will c p. 5
- …comments. 2026-017 Keith T. & Catherine J. Bonin / Orwell Township: (Reapplication of 2025-111) Pivot Energy PAL 112, LLC is proposing to develop a Solar Energy Facility on the existing property located at Cragle Road in Orwell Township. The overall property is approximately 92 acres, and the intent is to construct the solar facility within approximately 25 acres of existing agricultural fields. The solar facility development will include construction of a previously graveled access road, equipment pad areas, two solar array areas, and stormwater management facilities. No public sewer or pub… p. 6
- …Occupancy Permit, NPDES, and Municipal Review. 2026-060 Bradford Solar: Bradford Solar LLC is developing an approximately 100.5 MW AC utility-scale solar energy facility (Project) located in Burlington, Towanda, Franklin, and Monroe townships, Bradford C p. 7
- …Rudolph Steury Sheshequin Township* 2026-004 Judith A. Badami Wells Township 2026-006 Richard E. & Lisa M. Upham Pike Township 2026-007 PAL115 Tarbox Solar Project (Canton) Canton Township** 2026-008 Van Blarcom Farms Columbia Township* 2026-009 Brett & Lisa Szemple Albany Township 2026-010 Marjorie A. Stephens, Trust Standing Stone Township* 2026-011 Sandra & Ronald Scrivener Rome Township 2026-016 Kent & Alexis Muench Tuscarora Township 2026-013 Brian & Danielle Carr Wilmot Township* 2026-014 The Pathway, Inc. N. Towanda Township 2026-015 PAL 113 Solar Facility Sheshequin Township** 2026-016… p. 9