Public Works/Finance Committee Regular Meeting
Agendamoscowid.api.civicclerk.comAttachment008-CE-#003---Water-Main-Changes-On-SiteAttachment007-CE-#001---Additional-Water-Main-Requested-byAttachmentDevelopment Agreement_120 Farm Rd_Les Schwab_finAttachment120 Farm Rd Water Plan
Minutesnot posted yet
Meeting page ↗moscowid.portal.civicclerk.comAgenda items (7)
- 1.Approval of Public Works/Finance Committee October 12, 2026 Minutes (ACTION ITEM) - Laurie M. Hopkins p. 1
- 2.Disbursement Report October 2026 (ACTION ITEM) - Sarah Decker - Presentation of the Accounts Payable Report for the month ending October 2026. p. 1
- 3.Moscow Police Department – Office of Highway Safety Grant Award (ACTION ITEM) - Alisa Anderson - The Moscow Police Department (MPD) is requesting to accept an award from the Idaho Transportation Department (ITD) Office of Highway Safety (OHS) for the Federal Fiscal Year (FFY) 2027 Traffic Safety Grant. The program addresses specific behaviors related to traffic safety priority areas and safety deficiencies within local law enforcement jurisdictions and is focused on combatting traffic crashes resulting in fatal and serious injuries. The MPD is requesting to accept a grant award in the amount of $55,000 requiring an in-kind match of $13,750. p. 1
- 4.Moscow Water Reclamation Facility Aeration Basin Equipment Replacement Improvements Task Order (ACTION ITEM) - Evan Timar - Task Order No.29, pursuant to the Master Agreement for Professional Services between City of Moscow and J-U-B Engineers, consists of the design phase services for the replacement of the aeration basin equipment. The existing equipment was originally installed during the Phase III facility upgrades in 2001 and has reached the end of its intended service life. The aeration system is critical to the overall treatment process, providing the oxygen necessary for biological treatment and nutrient removal to protect receiving water quality and maintain compliance with regulatory limits. Implementing the improvements recommended in the 2022 Water Reclamation Facility Plan will reduce operational risks, improve system reliability, and ensure the facility can continue to… p. 1
- 5.Farm Road Watermain Development Participation Approval (ACTION ITEM) - Bob Buvel - On July 20, 2026, Council approved an expenditure of funds from the Water Capital Fund to abandon the existing asbestos cement (AC) water main located on the proposed Les Schwab development site at 120 Farm Road (formerly the University Four Theater). The proposed development agreement lays out the parameters for the payment and post-construction requirements for the project. Under the proposed cost-sharing arrangement, the City would fund 60% of the engineering and construction costs associated with the on-site water main improvements and 100% of the off-site improvements within Farm Road. The City's total project cost is estimated at $244,414.51. Included in the packet are the development plans, estimate, and a proportionate breakdown of the proposed cost responsibilities. p. 2
- 6.Avista Combined Gas and Electric Non-Exclusive Franchise Agreement Ordinance (ACTION ITEM) - Bill Belknap - The City currently maintains separate non-exclusive franchise agreements with Avista Utilities for the provision of gas and electric service in Moscow. The electric franchise expired in 2023, and the City and Avista have continued to operate under a franchise agreement under a memorandum of understanding to allow time to prepare and adopt a new combined gas and electric franchise agreement. The combined agreement has been prepared and is now before the Council for consideration. p. 2
- 7.Engineering Design & Construction Standards Resolution (ACTION ITEM) - Scott Bontrager - Staff is proposing to adopt the 2020 Idaho Standards for Public Works Construction (ISPWC) and update the City of Moscow Standard Construction Drawings, Engineering Design Standards, and Supplemental Technical Specifications to the ISPWC. These updates reflect current engineering practices, regulatory requirements, and lessons learned from recent Capital and Development projects in the community. The revisions are intended to improve clarity, ensure consistency in design and construction, and support efficient project delivery for both capital projects and private development projects. The updated standards address key areas such as roadway design, utilities, stormwater management, and construction requirements. Adoption of these standards will provide clear guidance to staff, developers, and… p. 2