Clive City Council 06/11/2026
Agendacliveia.api.civicclerk.comMinutescliveia.api.civicclerk.comMeeting page ↗cliveia.portal.civicclerk.com
6 items on this agenda match the land-use topicsSubdivisions (4), Infrastructure (1), Site plans (1)
Agenda items (42)Show only the 6 matching
- 1.City Manager Memo - Attached please find the City Manager's Memo for the June 11, 2026 meeting of the Clive City Council.
- 2.Approve 05/28/2026 City Council Minutes p. 1
- 3.Bill List
- 4.Approve Retail Tobacco Sales License Renewal Application - Love's Travel Stop - 11820 Hickman Road - Staff recommends approval. p. 1
- 5.Approve New Retail Alcohol Sales License Application - 515 Brewing - 7700 University Avenue - Staff recommends approval. p. 1
- 6.Approve New Retail Alcohol Sales License Application - Bella Love Event Venue - 8801 University Avenue, Suite 29 - Staff recommends approval. p. 1
- 7.Approve New Retail Alcohol Sales License Application - Mexico De Mis Sabores - 1800 NW 86th Street, Suite 11 - Staff recommends approval. p. 1
- 8.Resolution Approving Substantial Completion and Acceptance of the Work - City Hall Renovation Phase 2 Project - Final closeout and substantial completion documents have been submitted for the five prime construction contracts associated with the City Hall Renovation Phase 2 Project. The construction manager, design team and staff would recommend approval of the resolution setting the substantial completion date and accepting the work. p. 1
- 9.Resolution Approving Change Order #2 - The Concrete Company - 2026 Residential PCC Pavement Rehabilitation Project - $3,500.00 - Staff recommends approval of Change Order #2 in the amount of $3,500.00 to The Concrete Company for work performed on the above-referenced project. During the patching on NW 108 th Street that was approved on Change Order #1 during the 5/28/2026 council meeting, operations staff expressed interest in replacing an existing intake near the intersection. Before performing the replacement in-house staff requested a quote for the replacement. With the quote provided staff felt that the intake replacement was worth being performed by the contractor. A breakdown of the contract status is as follows: Amended Contract Amount - $546,927.50 Change Order #2 - $3,500.00 Revised Contract Amount - $550,427.50 Please feel free to contact me at jcygan@cityofclive.com or… p. 1
- 10.Approve Pay Request #1 - PFM Group Consulting LLC - Multi-Year Financial Model (Service 1) - $44,220.00 - Included please find pay application #1 for Service 1 associated with the multi-component consulting services agreement with PFM Group Consulting LLC. For Service 1 PFM was contracted to develop a Multi-Year Financial Planning Tool for the City. This work is now complete and the final product for Service 1 was presented to the Council in April. As noted in the attached professional services agreement, the City also contracted for Service 2 a city comparison/benchmarking exercise. The Service 2 work is underway after receiving the Council's approval to proceed in late 2025. The final component, Service 3, for more extensive development of specific economic and community development strategies for Clive has not started and will not start until the Council authorizes PFM to proceed… p. 1
- 11.Approve Pay Request #1 - The Concrete Company - 2026 Residential PCC Pavement Rehabilitation Project - $63,116.69 - Staff is recommending approval of a Pay Request to The Concrete Company for work performed on the above referenced project. Pay Estimate #1 - $63,116.69 A breakdown of the contract status is as follows: Amended Contract Amount - $546,927.50 Paid to Date - $63,116.69 Contract Remaining - $483,810.81 Please feel free to contact me at jcygan@cityofclive.com or 515-867-5141 prior to the meeting if you have any questions or concerns. p. 1
- 12.Approve Pay Request #2 (Retainage) - Pearson's Dirtwork & Trucking - 2026 Flood Mitigation Demolition Project / 7705 University Avenue) - $2,565.00 - Approve Pay Request #2 (Retainage) – Pearson's Dirtwork & Trucking – 2026 Flood Mitigation Demolition Project (7705 University Avenue) – $2,565.00 This pay request represents the release of retainage for the 2026 Flood Mitigation Demolition Project at 7705 University Avenue. The project has been completed in accordance with the contract documents and has been inspected and accepted by City staff. Staff recommends approval of Pay Request #2 and release of retainage, which will constitute final payment for the project. p. 1
- 13.Approve Pay Request #2 - The Concrete Company - 2026 Curb and Gutter Repair Project - $12,222.76 - Staff is recommending approval of a Pay Request to The Concrete Company for work performed on the above referenced project. Pay Estimate #2 - $12,222.76 A breakdown of the contract status is as follows: Amended Contract Amount - $27,774.75 Paid to Date - $26,941.51 Contract Remaining - $833.24 Please feel free to contact me at jcygan@cityofclive.com or 515-223-6231 prior to the meeting if you have any questions or concerns. p. 2
- 14.Approve Pay Request #3 - Mainline Construction - Alice's Road Reconstruction Phase 1B - $235,630.46 - Staff is recommending approval of a Pay Request to Mainline Construction for work performed on the above referenced project. Pay Estimate #3 - $235,630.46 A breakdown of the contract status is as follows: Contract Amount - $2,611,078.91 Paid to Date - $467,193.71 Contract Remaining - $2,143,885.20 Please feel free to contact me at jcygan@cityofclive.com or 515-223-6231 prior to the meeting if you have any questions or concerns. p. 2
- 15.Approve Pay Request #5 - Elite Glass and Metal - City Hall Renovation Phase 2 Project - $354.05 - Staff is recommending approval of pay request #5 to Elite Glass and Metal for construction completed on phase 2 of the City Hall Renovation Project. Elite is responsible for Prime Contract #2 – Aluminum Openings & Glazing. The pay request was reviewed by the City’s Construction Manager and Architect prior to this consideration for approval. Prime Construction Contract #2 – Aluminum Openings & Glazing Contract Amount $ 135,370.00 Contract Approved 9/25/25 Change Order #1 No Cost Approved by CM 11/4/25 Change Order #2 $ (384.00) Approved by CM 3/29/26 Change Order #3 $ 365.00 Approved by CM 5/27/26 Revised Contract Amount $ 135,351.00 Pay Request #1 $ 9,513.18 Approved 11/13/25 Pay Request #2 $ 17,077.79 Approved 1/8/26 Pay Request #3 $ 69,250.93 Approved 4/9/26 Pay Request #4 $ 35,094.52… p. 2
- 16.Approve Pay Request #6 - Caliber Concrete - Linnan Park Construction Project - $9,500.00 - Staff recommends approval of Pay Request #6 to Caliber Concrete for the work completed to date on the Linnan Park Construction Project. Total contract amount: $490,900.00 Total Change Orders to Date: $14,373.00 Contract + Change Orders: $505,273.00 Pay Request #6: $9,500.00 Total Requested to Date: $191,684.35 Remaining contract amount: $313,588.65 p. 2
- 17.Approve Pay Request #6 - Elite Fire Sprinkler - City Hall Renovation Phase 2 Project - $4,885.89 - Staff is recommending approval of pay request #6 to Elite Fire Sprinkler Systems for construction completed on phase 2 of the City Hall Renovation Project. Elite Fire is responsible for Prime Contract #5 – Fire Sprinkler. The pay request was reviewed by the City’s Construction Manager and Architect prior to this consideration for approval. Prime Construction Contract #5 – Fire Sprinkler Contract Amount $ 26,400.00 Contract Approved 8/28/25 Change Order #1 $ 5,037.00 Approved by CM 3/25/26 Revised Contract Amount $ 31,437.00 Pay Request #1 $ 8,584.50 Approved 11/13/25 Pay Request #2 $ 7,566.00 Approved 12/11/25 Pay Request #3 $ 6,305.00 Approved 2/12/26 Pay Request #4 $ 1,891.50 Approved 3/12/26 Pay Request #5 $ 1,261.00 Approved 5/14/26 Pay Request #6 $ 4,885.89 Balance Remaining $ 943.11… p. 2
- 18.Approve Pay Request #8 - Keystone Construction - City Hall Renovation Phase 2 Project - $9,459.12 - Staff is recommending approval of pay request #8 to Keystone Construction for construction completed on phase 2 of the City Hall Renovation Project. Keystone is responsible for Prime Contracts #1 – General Construction. The pay request was reviewed by the City’s Construction Manager and Architect prior to this consideration for approval. Prime Construction Contract #1 – General Construction Contract Amount $ 549,000.00 Contract Approved 8/28/25 Change Order #1 No Cost Approved by CM 11/3/25 Change Order #2 $ 11,341.17 Approved by CM 1/26/26 Change Order #3 $ 10,946.36 Approved by CM 3/25/26 Change Order #4 $ (10,968.59) Approved by CM 6/4/26 Revised Contract Amount $ 560,318.94 Pay Request #1 $ 44,586.15 Approved 11/13/25 Pay Request #2 $ 50,081.77 Approved 12/11/25 Pay Request #3 $… p. 2
- 19.Approve Pay Request #8 - On Track Construction, LLC - Linnan Park Construction Project - $36,181.00 - Staff recommends approval of Pay Request #8 to On Track Construction, LLC for the work completed to date on the Linnan Park Construction Project. Total contract amount: $1,193,000.00 Pay Request #8: $36,181.00 Total Requested to Date: $1,123,255.15 Remaining contract amount: $69,744.85 p. 2
- 20.Approve Pay Request #9 - NAI Electrical - City Hall Renovation Phase 2 Project - $2,350.99 - Staff is recommending approval of pay request #9 to NAI Electrical for construction completed on phase 2 of the City Hall Renovation Project. NAI Electrical is responsible for Prime Contract #4 – Electrical and Low Voltage. The pay request was reviewed by the City’s Construction Manager and Architect prior to this consideration for approval. Prime Construction Contract #4 – Electrical and Low Voltage Contract Amount $ 216,160.00 Contract Approved 8/28/25 Change Order #1 No Cost Approved by CM 11/3/25 Change Order #2 $ 10,850.00 Approved by CM 12/1/25 Change Order #3 $ 3,187.92 Approved by CM 1/21/26 Change Order #4 $ 3,299.97 Approved by CM 2/24/26 Change Order #5 $ 3,342.00 Approved by CM 3/29/26 Change Order #6 $ 13,755.00 Approved by CM 4/23/26 Change Order #7 $ 1,423.70 Approved By CM… p. 2
- 21.Approve Pay Request #11 - Country Landscapes - Greenbelt Landing Construction Project - $245,100.79 - Staff recommends approval of Pay Request #11 to Country Landscapes for the work completed to date on the Greenbelt Landing Project. Total contract amount: $925,000.00 Change Order: $28,542.59 Total Change Orders to Date: $46,162.59 Contract + Change Orders: $971,162.59 Pay Request #11: $245,100.79 Total Requested to Date: $678,773.13 Remaining contract amount: $292,389.46 p. 2
- 22.Approve Pay Request #11 - Hansen Company - Linnan Park Construction Project - $73,355.67 - Staff recommends approval of Pay Request #11 to Hansen Company for the work completed to date on the Linnan Park Construction Project. Total contract amount: $717,571.00 Pay Request #11: $73,355.67 Total Requested to Date: $470,600.08 Remaining contract amount: $246,970.92 p. 2
- 23.Approve Pay Request #17 - On Track Construction - Greenbelt Landing Construction Project - $37,627.41 - Staff recommends approval of Pay Request #17 to On Track Construction for the work completed to date on the Greenbelt Landing Project. Total contract amount: $1,700,000.00 Total Change Orders to Date: $139,792.40 Contract + Change Orders: $1,839,792.40 Pay Request #17: $37,627.41 Total Requested to Date: $1,725,917.82 Remaining contract amount: $113,874.58 p. 2
- 24.Approve Pay Request #19 - Air-Con Mechanical Corp. - Greenbelt Landing Construction Project - $5,320.00 - Staff recommends approval of Pay Request #19 to Air-Con Mechanical Corp. for the work completed to date on the Greenbelt Landing Project. Total contract amount: $388,703.00 Total Change Orders to Date: $125,790.66 Contract + Change Orders: $514,493.66 Pay Request #19: $5,320.00 Total Requested to Date: $488,768.94 Remaining contract amount: $25,724.72 p. 2
- 25.Approve Pay Request #20 - Keystone Construction - Greenbelt Landing Construction Project - $64,155.51 - Staff recommends approval of Pay Request #20 to Keystone Construction for the work completed to date on the Greenbelt Landing Project. Original contract amount: $2,518,000.00 Change Order: $30,356.51 Total Change Orders to Date: $239,651.62 Contract + Change Orders: $2,757,651.62 Pay Request #20: $64,155.51 Total Requested to Date: $2,587,426.59 Remaining contract amount: $170,225.03 p. 2
- 26.…This project includes the widening of Alice’s Road from the Dellwood Drive to south of Douglas Parkway. Upon completion of the reconstruction streetlights will be installed. Staff has received a proposal from MidAmerican Energy Company to install new streetlights once the construction is completed. The proposal includes provided and installing 4 single mast poles and 8 twin mast poles to provide the necessary lighting for the reconstructed street. The cost for the installation is $98,712.96. The work on Alice’s Road Phase 1B is a joint project between Clive and Waukee and the costs of the streetlights will be split 50/50 with Waukee. MidAmerican Energy Company provided a quote for the work. Staff recommends approval of the quote from MidAmerican Energy Company in the amount of $98,712.96 to provide and install the streetlights on Alice’s Road Reconstruction Project – Phase 1B. Please… p. 2
- 27.Resolution Approving Contract - Lyle Sumek Associates, Inc - 2026 Strategic Planning Consultant Services - $32,000 - Annually, the City has worked with Lyle Sumek to facilitate an annual update to the City's Strategic Plan through interviews, workshops and document development. Included in the packet is a not-to-exceed contract of $32,000 for the 2026 Plan update services. This is a decrease of $2,000 from the 2025 services contract. Staff continues to enjoy working with Lyle and his team on this process, and highly encourage the City Council to continue with the annual updating process that has taken place since the initial plan was created with Lyle in 2012. The resources to fund Lyle's services have been previously budgeted, and the City Manager would recommend your approval of the 2026 contract. p. 2
- 28.Resolution Accepting First Amendment to Storm Sewer and Water Main Easement - Lot 30 Shadow Creek Plat 5 - The owner of Lot 30, Shadow Creek Plat 5 has requested an amendment to an existing storm sewer and water main easement for installation of a fence within the easement area. The proposed project has been reviewed by City staff who have determined that the installation will not affect the City’s ability to maintain the infrastructure within the easement. Staff recommends approval of the attached Resolution Accepting First Amendment to Storm Sewer And Water Main Easement. p. 2
- 29.Resolution Accepting First Amendment To Storm Sewer and Overland Flowage Easement - Shadow Creek Plat 5- Lot 52 - The owner of Lot 52, Shadow Creek Plat 5 has requested an amendment to an existing storm sewer and overland flowage easement for installation of a fence within the easement area. The proposed project has been reviewed by City staff who have determined that the installation will not affect the City’s ability to maintain the infrastructure within the easement. Staff recommends approval of the attached Resolution Accepting The First Amendment to Storm Sewer and Overland Flowage Easement. p. 2
- 30.Resolution Approving Second Amendment to Declaration of Covenants, Conditions, Easements and Restrictions for Shadow Creek Plat 2 - At least 51% of property owners in Shadow Creek Plat 2 have signed a covenant amendment to allow luxury vinyl fences. The amendment includes minimum specifications for what qualifies as luxury vinyl. Staff have no concerns with the proposed amendment and recommend approval. If you have questions or need additional information prior to the meeting, contact Amanda at agrutzmacher@cityofclive.com or 515-223-6221. p. 2
- 31.Resolution Approving Satisfaction of Agreement to Complete Site Improvements Lot 1, Lot 2, and Lot C of 7 Flags Subdivision 2100 NW 100th St - Staff recommends approval of the Resolution Approving Satisfaction of Agreement to Complete Site Improvements related to Horizon Events Center. If you have questions or need additional information prior to the meeting, contact Amanda at agrutzmacher@cityofclive.com or 515-223-6221. p. 2
- 32.Resolution Approving the Acquisition of 2787 and 2791 W Avenue, Waukee, IA for the Alices Road Reconstruction Project, Including a Purchase Agreement and Lease to Ron Husted for 2787 W Avenue, Waukee, IA - The City is working on the Reconstruction of Alices Road from the south Corporate limit to the north Corporate limit. The project has been divided into phases with the following schedule: Phase Construction Year 1A 2025-2026 1B 2026 4 2027 3 2028 2 2029 As part of the project, there are several properties that will have acquisition requirements to construct the improvements. The owner (Marilyn J. Husted, Trustee of the Marilyn J. Husted Revocable Trust dated August 18, 2018) of the properties at 2787 and 2791 W Avenue, Waukee, Iowa, located in Phase 3 of the project, has been contacted in previous years by the City and informed that if she were ever to consider selling her property… p. 2
- 33.Resolution Authorizing Submission of a Flood Mitigation Assistance Application - With the recent information from Norfolk Southern Railroad related to the potential abandonment of the railroad line through the University Boulevard corridor, staff is interested in further exploring the possible flood mitigation benefits that might accrue from the removal of the railroad bridge/abutment crossing Walnut Creek (approximately the 7700 block of University Boulevard). The original University Boulevard Flood Mitigation Plan (2022) initially evaluated the flood risk reductions associated with the reconstruction of the bridge which would have enlarged the hydraulic opening under a new structure. However, the significant estimated costs associated with the reconstruction project resulted in the concept not being further considered as it was deemed to not be cost-effective. If the railroad is… p. 2
- 34.Resolutions Approving FY26 Budget Transfers (listing in packet) - Outlined are budget transfer resolutions for FY26: a. Resolution approving transfer from the General Fund to the Franchise Streets Project Fund - $1,200,000 b. Resolution approving transfer from the Local Option Sales Tax to the General Fund - $1,064,899.40 c. Resolution approving transfer from the Local Option Sales Tax to the Alice’s Road Phase 1B Fund - $325,000 d. Resolution approving transfer from the Local Option Sales Tax to the Annual Greenbelt Trail Fund - $130,000 e. Resolution approving transfer from the Local Option Sales Tax to the Rio Valley Park Project Fund - $75,000 f. Resolution approving transfer from Local Options Sales Tax to Debt Service - $1,000,000 g. Resolution approving transfer from the TIF Fund to Debt Service – $2,083,940 h. Resolution approving transfer from the Public Safety Facility Fund to … p. 3
- 35.Resolution Approving Amended Job Descriptions For Full-Time Positions p. 3
- 36.Approve Pay Rate - Rob Harris - Full-Time Fire Lieutenant - $106,000/year - Effective 06/29/2026 - The City of Clive is pleased to recommend the appointment of Rob Harris to the position of Fire Lieutenant. Rob has served with the Urbandale Fire Department since 2011 and currently serves as a Driver/Engineer and Acting Officer in Charge. Throughout his career, he has demonstrated strong leadership, operational expertise, and a commitment to public safety. Rob holds a Bachelor of Science degree in Fire Administration and Fire Investigation from Columbia Southern University and earned his Paramedic Certification through Mercy College of Health Sciences. His combination of education, experience, and leadership abilities has prepared him well for the responsibilities of a Fire Lieutenant. Following a competitive promotional process, staff recommends Rob's appointment to the position of Fire … p. 3
- 1.1st Consideration of Proposed Ordinance 1178 Amending Title 6, Chapter 7, Personal Transportation and Mobility Devices - This is the first consideration of an amended ordinance to address trail safety and etiquette, as well as update existing regulations concerning bicycles, electric low-speed bicycles, E-Motos, and electric devices of any type that may be used on city streets, sidewalks, multi-use trails, and/or public and private property. This item was identified during Strategic Planning for FY2026. Due to the significant revisions made following discussions with bicycle groups, legal counsel, and the Police Department, staff recommends restarting the ordinance process at first reading to allow Council to consider the revised proposal in its entirety. p. 3
- 2.Site Plan - Ivory Lotus Therapy - 16360 Sheridan Ave - Asmir Besic, on behalf of Ivory Lotus Therapy, is requesting approval of a site plan for a new office building at 16360 Sheridan Avenue. The proposed building is approximately 4,500 square feet and has two tenant spaces, both of which will be occupied upon completion. The attached staff report has additional information about the project. Due to impacts from flooding at the Harbach Center, staff was delayed in returning review comments. As such, the applicant is still addressing the latest stormwater management comments; however, staff feels comfortable that the outstanding comments will not impact the site layout and resolution of the comments can be administratively approved on a final submittal of the plan documents. The applicant is intending to utilize geothermal and identification of the geothermal well locations may…
- 3.Resolution Approving Termination of Agreement - Fire/EMS Services - Westside Station with City of West Des Moines - For over the past 40 years the Cities of Clive and West Des Moines have maintained a relationship to provide Fire and Emergency Medical Services response from the Westside Station (also called Station 22) located at 1801 68th Street in West Des Moines. Jointly constructed in the early 1990's, Station 22 provided a first due Fire Engine to Clive as Clive grew further westward and expanded Fire/EMS services were needed to supplemental the services provided by Clive from our own Fire Station 32 in Eastern Clive. As noted in the attached current Interlocal Agreement approved in May 25, 2023 the agreement has been amended on a number of occasions as both Clive's and West Des Moines's needs have changed, with West Des Moines completing the purchase of Clive's portion of Station… p. 3
- 4.Approve Pay Rate - Ronald Gaines - Director of Public Works - $166,500/year - Effective 7/22/2026 - As your City Manager, I am excited to bring forward the recommendation to approve the wage rate for Ronald Gaines to serve as the City's next Director of Public Works. Starting four months ago, the City has now completed the recruitment process for the position and Ron stood out from over 25 applicants the City received for the position. The recruitment process was facilitated by the City of Clive Human Resources Team, with three candidates being interviewed during the finalist process. Once reference checks were conducted for the top candidates, I then conducted a follow-up 1-on-1 interview with Ron, solidifying him as the ideal candidate to fill this role. Throughout the recruitment process, Mr. Gaines showed over and over again his experience and abilities to serve this critical role… p. 3
- 5.Resolution Approving City Manager Salary and Benefits Package FY 2026/2027 - Please see attached memo from the City Council Personnel Committee consisting of Mayor Edwards and Councilmembers Judkins and Weaver regarding the City Manager's annual review and salary/benefits recommendation for FY 2026/2027. p. 3
- 1.Clive Communications Report, January through May 2026 - Clive Communications Specialist Molly Elder will update the Council on City communications activities from January 2026 through May 2026. The attached slides outline primary stories told over the past five months and the performance of multiple engagement tools. We will also share design concepts for the next iteration of the City, Library, and Parks & Rec websites scheduled to launch in March 2027.