Agenda items (10)Show all 10
- A.…Improvements have been designed to install storm sewer piping and inlets on the streets in the subdivision, as well as improvements to the existing storm drain outfall at the downstream end of the neighborhood. On June 3, the City received bids for the Summer Hill Drainage Improvements Project. Three (3) contractors submitted bids as follows: TWDirt, LLC $ 671,363.00 Duplichain Contractors, LLC $ 1,066,586.00 Crockett Construction $ 1,123,638.00 TWDirt was found to be the lowest bidder. They are a Jefferson-based contractor who have not previously worked for the City of Nacogdoches nor Two Fifteen Consulting, the City’s engineering consultant on this project. Two Fifteen has spoken with contacts on prior projects that TWDirt has completed who have confirmed their ability to perform this type of work successfully. They also discussed the project with TWDirt and feels comfortable that… p. 2
- B.…LLC for the reimbursement of a gravity sanitary sewer line extension to Rock Haven Nursing Facility, located at 1703 W. Austin Street, in a not-to-exceed amount of $90,707.00 (Director of Public Works/City Engineer). - In accordance with Chapter 106, Article VIII of the Nacogdoches Code of Ordinances, a Developer may request reimbursement for the design and construction of up to 500 feet of a water or sanitary sewer main line, or some combination thereof, that can be extended for public use. Mummm Investments, LLC has proposed to install approximately 460 linear feet of new 6” sanitary sewer main from an existing sanitary sewer line east of the subject property in Opal Street, to serve the new Rock Haven Nursing Facility property. This sewer line will provide first time sewer service for the new facility which will have 100 beds for nursing care and rehabilitation. It will also make… p. 2