- …en paving and restoration of the eastern part of Bay Road, where trench excavation was done. In the drilling section near LaPlatte River, the gradual widening of the borehole continues, with the 18-inch pass now complete and the final, 22-inch pass beginning. The timing for completion of pipe installation remains uncertain. The third construction crew is now drilling under the Ti-Haul Trail, and the trail is closed. The above tasks comprise Contract #1 for the wastewater consolidation. Contract #2, the treatment plant renovation, has design work complete, with imminent issue of its final permi… p. 4
- …values, and business performance. With these factors in mind, the Selectboard added a to-be-determined package of downtown enhancements to the Town’s capital improvement plan, adopted in August. Staff then explored the most cost-effective path to launch a project. There are two sources outside funding most suitable to match the Town’s capital dollars: $40,000 from the O’Brien Brothers pre-development agreement for the purpose of safe connectivity to downtown, and the state government’ municipal planning grant of $50,000 for p. 5
- 3. Defer contract approval until after Town Meeting in March, or until after the planning grants awards are announced in December. This is the safest option to assure that all funding is authorized and available. It means that the Downtown Transportation Fund application deadline in November 2027 could not be met, but the program runs every year. This option also allows more time for additional community engagement. In other Town projects, for example the zoning update, the consultant schedule was obliged to extend (and costs increase) due to a high level of public interest. This connects to t… p. 7
- …a volunteer project demonstrating some intersection improvements. Town staff advised the volunteers throughout the project, even so far as to drive a fire engine during installation to assure that it could maneuver through the reduced turn radius. The package of improvements included: painting the crosswalk a solid red with white border, marking the crosswalk vertically with a faux granite bollard made of light wood, beautifying it with flower pots, and shortening the intersection turn radius using straw bales and wattles. The street paint came from the regular Highway budget, and the other ma… p. 4