Agendahallowell.govoffice.comMinuteshallowell.govoffice.comAgendaItem 6 - Ord Amend re: Public DancesAgendaItem 7.1 - DRAFT BESS OrdinanceAgendaItem 7.2 - DRAFT SES OrdinanceAgendaItem 8b - Roll of AccountsAgendaItem 8c - Department ReportsAgendaItem 9 - Manager's ReportAgendaItem 10 - MMA ElectionMeeting page ↗hallowell.govoffice.com
3 items on this agenda match the land-use topicsSpecial use (2), Surplus land (1)
Agenda items (10)Show only the 3 matching
- …lone and grid-connected battery storage systems in the City of Hallowell. Zoning districts where Battery Energy Storage Systems (BESS) are permitted, conditional use, or not permitted are included as a permitted-use table in Section 103: Applicability. If the Battery Energy Storage Systems Ordinance becomes a standalone ordinance, then the permitted-use table should be included in the ordinance. Alternatively, existing land use ordinances could be updated to reflect the permitted, conditional, and not permitted uses defined in the table in Section 103: Applicability. Section 100: Administratio… p. 1
- …mance standards as set forth in the permitted use table below: Permitted uses for BESS projects in Hallowell’s zoning districts. NP=Not permitted; CU=Conditional use; P=Permitted. Use Zoning District R1 R2 R3 DT SSPDD BA BB BC BD RF OP RP BESS-Primary Use NP NP CU NP CU NP CU CU NP CU NP NP Accessory BESS P P P P P P P P P P P NP Section 200: Definitions 201: Battery Energy Storage System (BESS). "Battery energy storage system," as defined by State law, means “a commercially available technology that uses chemical processes for absorbing energy and storing it for a period of time for use at a… p. 2
- …9.20 199.20 13.28 155 - Reg/Re-Reg Fees 10,000.00 10,000.00 1,076.00 1,076.00 10.76 200 - Miscellaneous Income 2,000.00 2,000.00 0.00 0.00 0.00 250 - Sale of City Owned Property 1,500.00 1,500.00 0.00 0.00 0.00 14 - Planning Board 500.00 500.00 0.00 0.00 0.00 181 - Historic Consult Reimb 500.00 500.00 0.00 0.00 0.00 16 - Code Enforcement 19,750.00 19,750.00 2,273.00 2,273.00 11.51 100 - Building Permits 15,000.00 15,000.00 1,903.00 1,903.00 12.69 125 - Sign Permits 250.00 250.00 100.00 100.00 40.00 150 - Plumbing Permits -City Share 3,000.00 3,000.00 270.00 270.00 9.00 175 - Miscellaneous Reve… p. 1
- …tal Records Research $ 1,500.00 $ 253.80 17% Treasurer $ 112,688.00 $ 7,329.80 7% Misc. Income $ 3,000.00 $ - 0% *Assessors $ 48,800.00 $ 3,919.58 8% Sale of City Property $ 1,500.00 $ - 0% Debt Service $ 163,496.00 $ - 0% Sale of Old Fire Station $ - $ - Insurance $ 554,185.00 $ 58,936.90 11% Planning Board $ 500.00 $ - 0% Police $ 440,186.00 $ 34,580.86 8% Code Enforcement $ 19,750.00 $ 2,500.50 13% Special Duty $ 10,000.00 $ 1,145.80 11% GA Resimbusement $ 10,500.00 $ - 0% *Fire $ 118,150.00 $ 205.00 0% Homestead Exemption* $ 137,237.00 $ 150,711.45 110% Water District $ 184,500.00 $ - 0% S… p. 2
- 1 CITY OF HALLOWELL DRAFT SOLAR ENERGY SYSTEM ORDINANCE Draft: July 27, 2026 Background The purpose of this ordinance is to allow solar energy development in Maine’s smallest city in a way that protects Hallowell’s natural resources, scenic character, historic identity, and sense of place. This draft ordinance was developed by the Hallowell Conservation Commission based on recent guidance from the Maine Department of Energy Resources1. It supports the clean energy and emissions reduction goals of the City of Hallowell and the State of Maine, and aligns with the City’s Comprehensive Plan (2022)… p. 1
- …40; and (2) reducing greenhouse gas emissions by 45% from 1990 levels by 2030 and 80% by 2050. This ordinance is written to facilitate development of solar energy systems in Hallowell while protecting the City’s identity and extensive natural resources. This draft ordinance benefitted from reviews by people knowledgeable about solar energy systems and decisions on land use, construction, and development in Hallowell. The Conservation Commission thanks the following for their thoughtful reviews, comments, and suggestions: Nick Lacasse, Partner, Perennial Renewables LLC Sarah Moore, Hallowell Co… p. 2
- B) Outdoor BESS are subject to location and permitting requirements as set forth in Hallowell’s Land Use Ordinances (Code of Ordinances, Chapter 9, Subchapter II (Residential Districts), Subchapter III (Downtown, Business and Mixed-Use Districts), and Subchapter IV (Resource Conservation Districts), with additional requirements as set forth in this Battery Energy Storage Systems Ordinance. Permitting shall be determined by the locational District within the City of Hallowell p. 1
- 9) Timeline for the process and an engineer’s cost estimate for decommissioning the BESS. Section 500: Performance Standards for Battery Energy Storage Systems subject to Planning Board review 501: Vegetation Clearing and Site Disturbance p. 6
- 2) A Battery Energy Storage System (BESS) that has reached the end of its useful life or, absent written notice of extenuating circumstances, has ceased operations for more than twelve (12) consecutive months, the owner or operator shall remove the installation no more than eighteen (18) months after the date of the discontinued operations. The owner shall notify the municipality’s CEO of the proposed date of the discontinued operations and plans for removal. p. 8
- 3) All solar energy systems, structures, equipment, security barriers, and transmission lines must be removed from the site. p. 8