Agendacitrusclerk.api.civicclerk.comAgendaBoard of County Commissioners November 30, 2026AttachmentAmici Pay App # 35 - NWQWW Final RORAttachmentRE [EXTERNAL] confirmation of figuresAttachmentsettlement_overviewAttachmentAction_Required_Albertsons_Opioid_SettlementAttachmentNature Walk Developer Agreement 2009AttachmentAffidavit_Non-Applicability_Developer_Agreement AttachmentTKA LetterAttachmentGT LetterAttachmentComplete Bravo Contract with AddendumsAttachmentCunningham Email January 22, 2024 Betz Farm RequAttachmentCitrus_County,_Florida_-_Renewal_of_00056215_-_2
Minutesafter the meeting
Meeting page ↗citrusclerk.portal.civicclerk.comAdd to calendar.ics for Outlook, Google, AppleThis agenda in plain words
Leer en españolThis is a regular meeting of the Citrus County Board of County Commissioners on Monday, November 30, 2026, at 1:00 PM in Inverness. The main items up for a decision include a water and wastewater fees and rates change, several contracts and settlements, a legislative priorities list, new administrative rules, a dog park discussion, and a Blue Ribbon Panel plan.
- Approve a revised water and wastewater fees and rates resolution, which sets what water and sewer customers pay. Touches: Water and wastewater customers. p. 4
- Approve a $40,000 settlement of a claim with Mary Beals, paid through Preferred Governmental Insurance Trust. $40,000. Touches: Mary Beals and Citrus County. p. 3
- Discuss citizen feedback on a new dog park in the north-west part of the county and give staff direction. Touches: Residents of the north-west part of the county. p. 8
- Adopt the 2027 Citrus County Legislative Priorities and let staff push them to the state legislature. Touches: State legislators and the Citrus County Legislative Delegation. p. 6
- Approve a request to allow the Albertsons opioid settlement participation form to be signed by the Chairman. Touches: Citrus County and Albertsons Companies, Inc.. p. 6
- Approve an amendment renewing the substance abuse therapy and counseling services agreement with SMA Healthcare, Inc. for one more year, to January 13, 2028. Touches: Court participants and substance abuse therapy clients. p. 5
- Direct the County Administrator and County Attorney to negotiate with Bravo to remove the second and third addendums to the Betz Farm contract. Touches: Betz Farm contract, Bravo. p. 7
- Approve a Blue Ribbon Panel plan: staff and the County Attorney will work with Comm. Kinnard on a framework and scope to bring back to the Board. p. 8
- Approve the 2026 Transit Asset Management Plan and the 2026 Public Transportation Agency Safety Plan revision for county transit. Touches: Citrus County transit riders and operators. p. 3
- Approve a letter of support for the City of Inverness Whispering Pines Park local bill proposal, sent to the state legislative delegation. Touches: City of Inverness, Whispering Pines Park. p. 6
Words on this agenda, explained
- Retainage
- A part of a construction contractor's payment that the county holds back until the project is finished and accepted.
- Ad Valorem Taxes
- Taxes paid on the value of property, such as homes and land.
- Amendment
- A written change to an existing agreement, such as renewing it or changing its terms.
- Attorney/Client Session
- A closed meeting where the Board talks with its lawyers about a court case.
- Affidavit of Non-Applicability
- A sworn written statement that an agreement no longer applies to certain land.
Written by AI from the agenda, Nov 20. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
6 items on this agenda match the land-use topicsSubdivisions (2), Water & sewer (1), Housing (1), Data centers & plants (1), Rezoning (1)
Agenda items (62)Show only the 6 matching
- 1.Invocation
- 2.Pledge of Allegiance p. 2
- 3.Roll Call
- 4.Approval of Agenda
- 1.Duke Energy Foundation Grant Check Presentation - Earlier this year, the Duke Energy Foundation announced the reopening of its annual Economic Development Grant Program in which the Foundation partners with various economic development departments across the state of Florida by providing the opportunity for economic development grants to be awarded to those economic development departments. As such, the Citrus County Economic Development team brought forward a proposal for the Citrus County Grow It Local Initiative: "Driving Local Small Business Growth." In recognizing that local small businesses truly are the backbone of the U.S. Economy and make up almost half of all the jobs held by Americans, Citrus County Economic Development recognized the importance of continuing to make strides in supporting and growing our existing local small businesses. While it is important that Citrus…
- 2.Jade White, Citrus County Chamber, Assoc. Vice President Operations & Outreach: Recognition of the Chamber Young Professional's 40 Under Forty Award - 40 UNDER 40 p. 2
- 3.Proclamation Keep Citrus County Beautiful Pride Award p. 2
- Minutes
- Administration
- 1.CoreCivic Contract Monitoring Update for October 2026 - At the February 22, 2022, BOCC meeting, the Board requested a monthly update on the staffing levels at the Citrus County Detention Center managed by Corecivic. The average levels listed below indicate the percentage of fully staffed contractually required posts for the indicated monitoring period. Listed below are the average staffing levels from October 2025 to current: -October 2025 staffing was at 91.56% -November 2025 staffing was at 95.02% -December 2025 staffing was at 96.85% -January 2026 staffing was at 94.44% -February 2026 staffing was at 93.54% -March 2026 staffing was at 95.30% -April 2026 staffing was at 94.25% -May 2026 staffing was at 93.88% -June 2026 staffing was at 94.62% -July 2026 staffing was at 94.45% -August 2026 staffing was at 96.35% -September 2026 staffing was at 95.22% -October 2026 staffing was at 95.85%
- Attorneys Office
- Clerk
- 2.County Warrants - Enter “Per Florida Statute 136.06 warrants or check registers shall be recorded in the minutes of the Board, therefore, attached are the County warrants paid during October of 2026.
- 3.Clerk Records Disposition #2326 - In accordance with the General Records Schedules set forth by The Division of Library and Information Services, Bureau of Archives and Records Management, pursuant to the Florida Administrative Code Chapter 1B-24, the attached Records Disposition Form lists records which have met their assigned retention periods.
- Community Services
- 4.Nature Walk Affidavit of Non-Applicability of Developer Agreement - In 2009, Florida Low Income Housing Associates, Inc., entered into a development agreement pursuant to receiving State Housing Initiatives Partnership (SHIP) funding. The recorded agreement erroneously omitted the legal description in attachment A. Therefore, the broad description of the development agreement included 28 vacant lots that should have been excluded, as the funding restrictions were intended to apply solely to the existing 50-unit multifamily rental community known as "Nature Walk". Florida Low Income Housing Associates, Inc. fully satisfied all SHIP obligations in 2021. Because the owners are currently preparing to sell the property, they are requesting a formal release of the 28 vacant lots from the original agreement. p. 3
- 5.Annual Transit Asset Management Plan 2026 - The Federal Transportation Administration (FTA) Transit Asset Management (TAM) Final Rule 49USC 625 became effective October 1, 2016. The Final Rule requires transit agencies to develop and implement a TAM plan if the agency owns, operates, or manages capital assets used to provide public transportation. This is intended to guide agencies towards a state of good repair (SGR) in which assets operate at a full level of performance. The Citrus County Clerk of Courts also maintains a list of these assets. Transit agencies must update their TAM plans at least once every four years to share with the FTA and the planning agency (Hernando/Citrus MPO). Citrus County Transit updates the plan annually internally to assist in required FTA reporting. The TAM plan was last approved by the Board of County Commissioners on December 13, 2022. This TAM plan is…
- 6.Annual Public Transportation Agency Safety Plan -2026 Revision - On July19, 2018 the Federal Transportation Administration (FTA) published 49 CFR Part 673 that impose transit agencies receiving federal funds to transition from System Safety Program Plan (SSPP) to the Public Transportation Agency Safety Plan (PTASP). The PTASP is a safety plan for the Citrus County Transit (CCT) system. It sets safety policies, procedures and reporting standards as required by the FTA. These standards are comprised of the Safety Management System (SMS), Rule 14-90.009 Equipment and Operational Safety Standards for Bus Transit Systems, and other documentation contained within the PTASP. The original PTASP was developed and adopted by the BOCC on September 8, 2020. Rivision #1 was adopted 7/13/2021. Revision #2 was adopted 7/12/2022. There were no changes in 2023. Revision #3 Major Update was adopted… p. 3
- Fire Services
- Human Resources
- 7.Settlement of Claim # F229GL0043-01 - Risk Management presents a proposed settlement for a bodily injury claim from a slip in fall on county property that occurred on October, 19th 2022. If approved, the full and complete settlement releases Citrus County, Florida, and Preferred Governmental Insurance Trust.
- Management and Budget p. 3
- 8.Budget Transfers - Budget transfers increase the original budget for an expenditure account through a decrease in another expenditure account. These accounts must be within the same fund. Fiscal Year 2025-2026 Library Services - Reallocate funds into the appropriate accounts to cover end of year budget exceeds. Fiscal Year 2026-2027 Inverness Airport - Reallocate the remaining design funds to the construction phase of the Corporate Hangar at the Inverness Airport (INF).
- 9.Budget Resolutions - Section 129.06(d), Florida Statutes provides that the Board may amend its budget by resolution to appropriate and expend funds from a source not anticipated in the Board’s regular budget. Grants, donations, reimbursement for damages, or any other additional source of revenue are not included in the original budget. Amend the State Housing Initiatives Partnership (SHIP) grant budget for fiscal year 2026-2027. Adopt the Lakes Region Library Renovations, the Coastal Regional Library Renovations, and United States Department of Housing and Urban Development (HUD) Housing Choice Voucher Section 8 grant budgets for fiscal year 2026-2027.
- 10.Water and Wastewater Fees and Rates Resolution Amendment - The final budget hearing was held on September 21, 2026 at 5:01p.m. and included a resolution adjusting the water and wastewater connection fee rates for Fiscal Year 2026/2027. The Exhibit "A" erroneously omitted the FY 27 Bulk Wastewater charge.
- Growth Management
- Public Works
- Systems Management
- Visitors and Convention Bureau p. 4
- Water Resources
- 11.Release of Retainage ITB 22-098 Northwest Quadrant Waste Water Extension Project - This project included approximately 22,240 LF of 10-inch PVC force main, 7,200 LF of 12" HDPE force main via directional drill, 3 lift stations, decommissioning of two existing package Wastewater Treatment Facilities, and general restoration of the project areas. The contractor Amici Engineering Contractors LLC has completed the ITB 22-098 Northwest Quadrant Waste Water Extension Project. The Project Manager confirms that the project has been successfully completed to satisfaction and requests that the Board approve the project and release the retainage to the contractor. p. 4
- 12.Imperial Gardens Mobile Home Park (MHP) Plant Interconnection Project ITB 24-147 Release of Retainage - On November 7, 2024, the BOCC approved an agreement between Citrus County and Midsouth, Inc. for the Imperial Gardens Mobile Home Park (MHP) Plant Interconnection Project ITB 24-147. The amount will be paid from this account: 002j-205221- $66,374.30 The Project Manager confirms that project ITB 24-147 was satisfactorily completed on October 20, 2026, by Midsouth, Inc. The Department of Water Resources Utilities Planning and Engineering Division is requesting the Board approve the project and release of retainage funds to Midsouth, Inc. in the amount of $66,374.30 (sixty-six thousand three hundred seventy-four dollars and thirty cents). p. 4
- 13.Amendment #6 to Agreement LP09019 Cambridge Greens Septic to Sewer Project - The Florida Department of Environmental Protection (FDEP) entered into Agreement LP09019 with Citrus County, Florida for the CIP U2019-01 Cambridge Greens Septic to Sewer Project, effective November 6, 2018. The project is complete, and this amendment is needed to reconcile the grant amounts to account for the modifications to the funding program that were implemented to remove the need for individual property owner assessments, and to bring the grant amounts into agreement with the final project costs. With Amendment 6 to this agreement, the overall FDEP grant funding is reduced by $278,669 and the project work plan and audit requirements are updated to reflect the final project conditions. The revised FDEP funding support for the Cambridge Greens septic-to-sewer conversion project is $6.64 million. p. 4
- Set Public Hearings Workshops p. 4
- 1.Bids
- a.PB 26-024 State of Florida Contract 55000000-23-NY-ACS Books, Serials, Databases, and Library Resource Management Products; West Publishing Corporation, a Thomson Reuters Business - Staff is requesting Board approval to engage West Publishing Corporation, a Thomson Reuters business, for the subscription-based service for the West Proflex product. The West Proflex product provides Citrus County Library patrons with access to legal knowledge platforms and resources, for a minimum term of three (3) years, which may be renewed for one (1) year renewal period. Board be Advised: the vendor's request to add the language "unless provided for the Thomson Reuters' General Terms and Conditions" to the Addendum to Order Form Section 3(d), allows for the vendor to unilaterally change the Terms and Conditions effective 30 days after notice is given. The vendor states this is necessary as they are… p. 5
- b.RFP 25-018 Amendment No. 1; Substance Abuse Therapy/Counseling Services; SMA Healthcare, Inc. - On January 14, 2025, the Board entered into an Agreement for RFP 25-018 Substance Abuse Therapy/ Counseling Services with SMA Healthcare, Inc., to provide a licensed substance abuse therapist and a mental health counselor to provide outpatient and inpatient treatment for Citrus County Court Alternative participants, as outlined by the Court, expiring on January 13, 2027, with an option to renew for three (3) additional one (1) year periods. Staff request to amend the Agreement to exercise the first option to renew the Agreement for an additional one (1) year term, extending the duration of the Agreement to January 13, 2028, and to modify the language in Section 20.4 Compliance with Laws and Section 20.14 Equal Employment Opportunity, in accordance with Executive Order 14173. There is no… p. 5
- c.QTE 22-152 Amendment No. 2; SaaS Web and PDF QA; CivicPlus, LLC (ADA Compliance) - On January 24, 2023, the Board entered into an Agreement with Monsido, LLC, to provide an online tool suite which scans the County website every 7 days providing a status report about the website's condition and access to the numerous tools in the dashboard to find and solve issues and make improvements related to Quality Assurance, Accessibility, Search Engine Optimization and Web Governance for a term of three (3) years with an option to renew for three (3) additional one (1) year periods. On July 9, 2024, the Board consented to the assignment of the Agreement to CivicPlus, LLC, and CivicPlus, LLC, agreed to perform all the duties and obligations of the Service Provider under said Agreement. On January 6, 2026, the Board amended the Agreement to exercise the first option to renew the Agreement for an… p. 5
- d.PB 27-016 Miami-Dade County No.: EVN0000251 Cleaning and Repair of Bunker Gear; Fire-Dex GW, LLC dba Gear Wash - Staff requests Board approval to piggyback on Miami-Dade County's contract EVN0000251 Cleaning and Repair of Bunker Gear with Fire-Dex GW, LLC dba Gear Wash to provide cleaning and repair services for firefighter protective uniforms, otherwise known as bunker/turnout gear. Bunker gear maintenance is vital for firefighter cancer prevention and in reducing the health and safety risks associated with improperly or poorly maintained bunker gear. This Agreement will provide required cleaning and repair services for each set of protective gear in compliance with the National Fire Protection Association's Standard 1851 (NFPA 1851) after each incident to ensure clean, safe and compliant protective gear is always available. The total budget for this service is $25,000 and will be… p. 5
- e.PB 26-175 (CONFIDENTIAL) Hernando County Agreement No.: 25-RFP01060/CT Audio Visual (AV) Design, Installation, and Implementation Services for 5th Judicial Circuit Courtrooms - Staff requests Board approval to piggyback Hernando County's Agreement No.: 25-RFP01060/CT with the Professional listed on the agreement documents, to provide the Audio Visual (AV) design, installation, and implementation services for the 5th Judicial Circuit Courtrooms remodel. Staff has identified the need to have an experienced professional with experience of the audio/visual needs and the ability to match other 5th Judicial Circuit Court locations. The total cost for the Audio/Visual design phase is $46,685. p. 6
- 2.Citrus County Airport's Conceptual Signage Project — Final Report - Infrastructure Consulting & Engineering, LLC (ICE) prepared conceptual entrance and wayfinding signage designs for Crystal River and Inverness airports. The report includes proposed sign locations, design renderings, materials, and preliminary cost estimates. Funding for the project has been budgeted. The concepts were refined through feedback from the Aviation Advisory Board, County staff, airport stakeholders, and individual County Commissioners. Both airports would share a coordinated design, with “CAPT Tom Davis” and military pilot wings at Crystal River, and corporate aircraft imagery and the phrase “Innovation Happens Here” at Inverness. The proposed signs would improve airport identification and help visitors navigate airport facilities. p. 6
- 3.Hazard Mitigation Grant Program (HMGP) Agreement – Emergency Generator for Lecanto Government Building (LGB) (HMGP-4806-012-R) - The Florida Division of Emergency Management (FDEM) awarded Citrus County a Hazard Mitigation Grant Program (HMGP) subaward providing 75% federal funding, not to exceed $395,250 for the purchase and installation of permanent emergency generators at Lecanto Government Building (LGB). The County’s 25% match funds for this project will be $131,750. The project will improve the resilience of this critical facility by providing backup power during severe weather events and extended power outages. The HMGP project shall provide protection by purchasing and installing a 500-kW permanent natural gas generator, or the adequate size determined by the vendor and/or an electrical engineer during the bid process to appropriately support this critical facility. The proposal … p. 6
- 4.Albertsons Opioid Settement - A proposed settlement agreement ("Settlement") has been reached with Albertsons Companies, Inc. The Settlement requires Albertsons to pay over $770 million. In order to participate in this settlement, a Subdivision Participation and Release Form will need to be signed and returned by December 30, 2026.
- 5.Letter of Support for City of Inverness - Whispering Pines Park - The City of Inverness is currently engaging in a community outreach campaign in support of a potential local bill with the State Legislature that would transfer ownership of Whispering Pines Park from the State of Florida to the City of Inverness. Whispering Pines Park has long been a community landmark in Inverness and has served generations of residents going back decades. Despite this, it has been largely operated and maintained on land owned by the State of Florida which has made efforts to make long-term plans and apply for various grant funds somewhat challenging. If the local bill is introduced and the legislature passes it, the ownership of the land where Whispering Pines Park is located would transfer from the State of Florida to the City of Inverness. If this occurs, the city can take major steps to pursue… p. 6
- 6.…stakeholders. For policy objectives, careful consideration was given to the preservation of home rule for local governments, environmental protection of water and natural resources, affordable housing, and opportunities for economic development. For appropriations requests, efforts were made to identify critical funding needs where actual completion of the project is feasible if funding is secured. On November 20th, 2026, the Board of County Commissioners held a Legislative Planning Retreat where a variety of appropriations requests and policy objectives were discussed. As of result of the retreat, the Commissioners were able to narrow down the list of proposed appropriations and policy objectives to a finalized version of the list. After the retreat, staff worked to put the list into a formalized packet that can be adopted by the Board of County Commissioners. Adoption of the legislati
- 7.Administrative Regulation 6.07 Cash Handling - Staff continues to revise and update the County's Administrative Regulations. The AR has been updated to reflect current operations and polices.
- 8.New Administrative Regulation 2.24 - Nondisclosure Agreements Related to Data Center Development - On July 14, 2026, the Board of County Commissioners considered the issue of nondisclosure agreements related to data center development and directed staff to prepare an Administrative Regulation (AR) prohibiting elected County officials and County employees from executing such agreements. In response to the Board's direction, staff has prepared proposed AR 2.24, which establishes a prohibition on signing or otherwise executing nondisclosure agreements, confidentiality agreements, or similar agreements related to data center development on behalf of Citrus County or in connection with County business. p. 7
- 9.…The Sewer Connection Program provides a reimbursement of up to $4,000 per home to eligible homeowners in the Cambridge Greens Subdivision, to assist with costs incurred to switch from an existing septic system and connect to central sewer. Previously, the vendor accepted a purchase order in lieu of requiring an executed Order Form. Accordingly, a purchase order was issued and submitted to the vendor on October 6, 2026, to maintain uninterrupted access to the software application. Formal ratification is now being requested to provide after-the-fact approval of the action and formally confirm the County's authorization of the engagement.
- 1.Outstanding Commission Items p. 7
- 1.Legislative Updates - Alex Alt, Intergovernmental Liaison & Administrative Development Review Expeditor - Provide Legislative Update to the Board of County Commissioners regarding the timeline for moving forward with the Citrus County Board of County Commissioners Legislative Priorities. This update will also include discussion related to next steps with the State Legislative process after ratification of the Legislative Priorities by the Board of County Commissioners. Furthermore, the presentation will also include an update to the Board of County of Commissioners regarding direction given to staff regarding federal permits at a previous board meeting. p. 7
- 1.…Dicks wanted these addendums, “Additionally, due to the recent denial of the rezoning modification (Pine Ridge Golf Course), the buyer would like to make some adjustments to the Terms of Agreement. The purpose of these adjustments is to minimize the risk of another project denial, as they feel that the previous denial was influenced by politics during an election year. Mr. Dicks assures us that he fully intends to proceed with the purchase of the Betz Farm property as soon as he secures the necessary approvals and permits for its development.” We also received letters from two attorneys with differing opinions on whether the contract with the addendums is valid. I would like the Board to ask the Buyer to remove the addendums and contingencies and to go back to his original offer. The details can be worked out by our Administrator and Attorney. I believe this would clear up any issues…
- 1.Discussion of new Dog Park - Discuss citizen feedback regarding a new dog park.
- 2.Blue Ribbon Panel - The county has been approached by several individuals from within the Pine Ridge Community regarding the establishment of a Blue Ribbon panel of County citizens. The panel would be created to provide stakeholder input into the land development decision/modification process. If the Board is interested in creating such a panel, I’d like to seek Board approval to work with Administration, Staff and Legal to create the framework and scope for the panel.
- 3.Management Plan Advisory Group for Withlacoochee State Forest - We are participating in the Management Plan Advisory Group for Withlacoochee State Forest, MPAG process for the Withlacoochee Stater Forest that occurs every 10 years. We seek an elected representative from Citrus County to serve in the group. The person would be responsible to read and comment and is for approval of the 10-year management plan . The scheduled meeting dates are January 26 at 1:30 and January 27 at 9:00, the location is TBD. This is particularly important because the Florida Forest Service manages so much property in Citrus County. p. 8
- 4.2027 Board of County Commissioner meeting dates - 2027 2027 Board of County Commissioner meeting dates
- 5.2027 Commissioner Board & Committee Liaison Appointments p. 8
- 1.Attorney/Client Session - Citrus County, Florida v. Lecanto Sand, LLC - Pursuant to Section 286.011(8), Florida Statutes, Citrus County's counsel is requesting the Board schedule and advertise a meeting in private to discuss pending litigation in the case styled Citrus County, Florida v. Lecanto Sand, LLC (Case no.: 2026 CA 000642). The participants at this meeting will be only those permitted by law: Commissioner Janet Barek Commissioner Jeff Kinnard D.C. Commissioner Holly L. Davis Commissioner Stacy Worthington Commissioner Holli Herndon Steve L. Howard, County Administrator Dale A. Scott, Attorney, Tessitore Mari Scott, PLLC Denise A. Dymond Lyn, County Attorney Joy Hayes Court Reporting p. 8
- 1.Announce two regular member vacancies and one alternate member vacancy on the PDC - Announce two regular member vacancies and one alternate member vacancy on the Planning and Development Commission (PDC) due to expiring terms on January 31, 2027. The new terms will expire on January 31, 2031. The PDC shall have 3 members employed or retired from one of the following professions: architect, urban,rural or regional planner; landscape architect; environmental scientist; civil engineer; real estate broker or agent; surveyor; or construction contractor. 2 members shall be employed in or retired from any other profession; 2 members shall be representative of a homeowners/property owners association or a civic association. T he BOCC may appoint any resident of Citrus County deemed to be otherwise qualified to serve on the basis of suitable education, training, experience, or any combination… p. 8
- 2.Aviation Advisory Board - Announce Vacancy & Seeking Applications - The Aviation Advisory Board requests the BOCC announce the vacancy for one District 4 regular member position. This vacancy follows the resignation of a Board member from District 4. The term for this regular member position will expire on January 31, 2028. Once the Board acknowledges the member vacancy, a press release will be distributed and applications will be accepted in the County Administrator's office through December 15th, 2026. p. 8
- 1.Regular Meeting, December 15, 2026, at 1:00 PM, Citrus County Courthouse, Room 100, 110 N. Apopka Avenue, Inverness, FL 34450 p. 9
- 2.Regular Meeting, January 2027 - To be approved, Citrus County Courthouse, Room 100, 110 N. Apopka Avenue, Inverness, FL 34450 - Regular Meeting, January 2027 - To be approved at the November 30 meeting, Citrus County Courthouse, Room 100, 110 N. Apopka Avenue, Inverness, FL 34450 p. 9
- 1.Legislative Delegation, Friday, December 11, 2026, at 9:00AM, Citrus County Courthouse, Room 100, 110 N. Apopka Avenue, Inverness, FL 34450 - Workshop : To be Determined , at 9:00AM, Citrus County Courthouse, Room 100, 110 N. Apopka Avenue, Inverness, FL 34450 p. 9