- 1.October 8th,2026 Draft Minutes - AAB p. 2
- 1.Barry Simons, District 4 Representative - Resignation - Barry Simons, District 4 representative, resigned effectively, on November 2 nd , 2026.
- 1.Aviation Education Opporunities - Withlacoochee Technical College/Citrus High School
- 2.CGC Bathroom Remodel p. 2
- 3.Updates from the Industry p. 2
- 1.Hangar Status Report - AIRPORT HANGAR TYPE TOTAL OCCUPIED VACANT WAITING LIST LEASE RENEWALS INF T Hangars 16 16 0 5 0 CGC T Hangars 20 20 0 2 0 CGC Box Hangars 2 2 0 6 0
- 1.CGC Runway 9/27 Extension - Justification - The project includes the second phase (Phase II) of the Environmental Assessment (EA) to evaluate potential National Environmental Policy Act (NEPA) impacts in accordance with Federal Aviation Administration’s policies and procedures per Order 1050.1F for Citrus County’s Crystal River Airport (CGC) Runway 9-27 extension and associated site improvements. This project includes completion of the Environmental Assessment (EA) and associated planning, engineering, land acquisition, and permitting activities required to support the proposed extension of Runway 9/27 and related airfield improvements. The project is intended to enhance operational safety, improve aircraft performance capabilities, support economic development, and ensure compliance with applicable FAA regulations and environmental requirements. UPDATE: Project is 95% complete. Final…
- 2.CGC Fuel Tank Replacement - Justification - The airport’s two 12,500-gallon fuel tanks have reached their 20-year lifespan, so their condition, regulatory requirements, and technological obsolescence require replacement. This project will install two new 12,000-gallon aboveground tanks (one Jet-A, one AvGas) within the existing concrete containment and loading/offloading area, along with a truck load and offload station and a self-serve fueling station to enhance accessibility and efficiency. During construction, the fuel facility will be out of service, requiring coordination to minimize disruptions. This replacement is essential to ensure compliance, safety, and long-term operational reliability for airport fueling services. UPDATE: Project is 80% complete. Electrical EFSO switch and Non-destructive Testing/Inspection Project is still on track to be complete by January 2027.
- 3.CGC Airfield Lighting Replacement - Justification - The Crystal River Airport Airfield Lighting Replacement Project will modernize outdated lighting and navigational aids that no longer meet FAA standards. Replacing failing systems with energy-efficient LED technology will enhance safety, visibility, and reliability while reducing maintenance costs. This $200,000 project, funded 80% by FDOT and 20% by Citrus County, ensures compliance and supports the airport’s long-term operational sustainability UPDATE: Trinity Electrical has been awarded this project on October 26 th , 2026, and the first preconstruction meeting is pending.
- 4.INF Business Park - Justification - The Citrus Inverness Airport Business Park is a strategic initiative designed to enhance aviation and industrial development within a 75-acre business park. This project will support critical infrastructure improvements, including onsite utilities, telecommunication/fiber, a stormwater treatment system, circulation roads, and an aircraft taxiway spanning approximately 3,350 feet within the park. Additionally, the project includes the reconstruction of 3,115 feet of the main access roadway, ensuring improved connectivity and access. The business park will provide pad-ready sites capable of supporting a wide range of aviation, aerospace, manufacturing, maintenance, and related industrial activities while encouraging economic growth, job creation, and long-term development at Inverness Airport. UPDATE: Project is 75% complete. Laying final rock down and…
- 5.INF Corporate Hangar - Justification - The proposed 12,000-square-foot hangar is designed to support the Airport’s long-term growth by accommodating tenants utilizing the critical design aircraft. This facility will enhance aviation operations, economic development, and business opportunities at the airport. The inclusion of a 2,400-square-foot office and workshop space will provide flexibility for a variety of aviation-related uses, supporting both aircraft maintenance and administrative functions. This hangar will improve airside and landside connectivity, ensuring seamless integration with existing airport infrastructure. The project will strengthen the airport’s capacity to attract aviation businesses, promote regional economic growth, and enhance overall operational efficiency. UPDATE: Drafting Invitation To Bid documents and following County permitting process.
- 6.…INF has experienced growth and development and needs to have the aviation activity forecasts updated and to take a thoughtful look at their capital improvement program. INF has an ongoing Airspace Obstruction Clearing project that will require public outreach to the property owners of the community affected by the identification of known obstructions and ultimate requirement of obstruction clearing. This project will gauge the public’s interest and cooperation for allowing Citrus County to clear the applicable obstructions. The current Exhibit “A” does not include official survey or title search. Citrus County’s current (Disadvantage Business Enterprise) DBE Program (includes INF and CGC) and Goals are to be updated. This scope will update the DBE Program and Goals for FY 2026 - 2028. UPDATE: Project is 90% complete. MPAC Meeting #3 (Final) and Public Meeting #2 (Final) was on November…
- 7.Inverness Airport (INF) Fire Station (Not an Aviation Lead Project) - Justification - This project supports construction of a new fire station at Inverness Airport to improve emergency response capabilities and provide expanded public safety services while ensuring compatibility with existing airport operations. UPDATE: FAA has asked consultant to resubmit plans because of changes to design. p. 4
- 8.INF & CGC Automated Weather Observing System (AWOS) Replacement - Justification - The AWOS Replacement project for both airports will replace the existing Vaisala AW10 VD Level 3PT model of the AWOS system as was installed in 2008 of which has reached the end of its useful life. The new AWOS system project will consist of an AWOS-III PT system, removing and replacing all components of the existing system to constitute a full replacement. UPDATE: Grant amendments approved on October 13 th , and County’s intent to award placed on the November 17 th , 2026 BOCC Agenda. p. 5
- 1.Airport Signage (Design Concept) - Infrastructure Consulting & Engineering LLC (ICE) has submitted a proposal to develop conceptual signage designs for Crystal River Airport and Inverness Airport. The project includes creating two design concepts for static entrance signs at each airport and two concepts for wayfinding signage at Inverness Airport, along with site layouts, finish schedules, and supporting materials. ICE will manage the project through five key phases: project formulation, stakeholder engagement, concept development, stakeholder feedback, and final concepts, with a total anticipated duration of two to four months. ICE is prepared to begin work upon notice to proceed. UPDATE: Final Concept report on BOCC agenda for November 30 th , 2026.
- 1.Thursday, December 10th, 2026 - 2:00 PM Lecanto Government Building - Room 166 p. 5