Forsyth County, GA · pop. 260K
Tue10Nov2:00 PM
Board of Commissioners Work Sessions
Tue Nov 10, 2:00 PM · 12 days ago
Board of Commissioners Work Session
Agendaforsythcoga.api.civicclerk.comAttachmentCDA Prelim Design PackageAttachmentlocation_map_cup_B0C CI_cdaAttachmentlocation_map_za4108Attachmentconcept_plan_za4108Attachmentboc_decision_za4108_rev_070623AttachmentSR369 Widening CO41 - Final Quantity Adjustment
Minutesnot posted yet
Meeting page ↗forsythcoga.portal.civicclerk.com3 items on this agenda match the land-use topicsInfrastructure (1), Rezoning (1), Site plans (1), Special use (1), Variances (1)
Agenda items (38)Show only the 3 matching
- 1Board ratification to apply for the United States Tennis Association (USTA) Adapted Tennis Program Grant in the amount of $1,500.00 with no match required to support the Therapeutic Recreation Adaptive Tennis Program – Director, Department of Parks and Recreation - The grant funds will be used for instructor fees, snacks, awards, and equipment for the Therapeutic Recreation Division's Adaptive Tennis Program. Ratification is needed because the grant deadline is November 8, 2026. p. 1
- 2Board consideration and approval of a Task Order with United Pump and Controls, Inc. in the amount of $109,664.25 to provide services for the installation and implementation of FM Live under the Fuel Site Repairs As-Needed Agreement (26-41-3180) - Director, Department of Fleet and Environmental Services - Fleet Services gained approval to support the installation and implementation of FM Live during the 2027 Budget process. $110,000 was allocated to GL:63531900.542410 to support this project. FM Live is a web-based program that will replace our legacy fuel transaction and management system currently in place. p. 1
- 3Board consideration and approval of the Budget Resolution to fund 2026 prorated costs for the appointment of the 3rd State Court Judge, support staff and required capital. Staff requests this Item be considered on a "Time Sensitive" basis - CFO, Department of Finance p. 1
- 4Board consideration and approval of a grant closeout attestation for the Fowler Park Reclamation Facility Return Flow Project from the American Rescue Plan Act Water & Sewer Infrastructure Grant Program of the State and Local Recovery Funds (SLRF). Staff requests this Item be considered on a " Time Sensitive" basis - Grants Manager, Department of Finance - Document will be sent via docusign for chairman to sign. Item will be sent to chair@forsythco.com p. 1
- 5Board consideration and approval of the 5-Year Renewal Professional Services Agreement in the amount of $293,990.00 with Medical Priority Consultants, Inc. d/b/a Priority Dispatch - Director, Emergency Management Agency - Renewal of the current Priority Dispatch (ProQA) system used in the center for working 911 calls: Year 1 - 57,812 Year 2 - 57,812 Year 3 - 57,812 Year 4 - 59,543.50 Year 5 - 61,017.90 p. 1
- 6Board consideration and approval of Addendum No. 1 to the End User License Agreement between Everbridge, Inc. and Forsyth County in the amount of $141,280.08 - Director, Emergency Management Agency - Renewal of our Mass Notification System: Everbridge aka (AlertForsyth). Contract is for 3 years @ $47,093.36 per year. p. 1
- 7Board consideration and approval of the closeout for the Georgia Emergency Management and Homeland Security Agency's (GEMA/HS) #6 Grant for the Community Emergency Response Team (CERT), #39 and #49 for the Explosive Ordinance Disposal (EOD) Grant in the total amount of $85,466.96 – Chief of Staff, Sheriff’s Office - Grants under closeout: Community Emergency Response Team (Cert): Project #6 $10,100.00 — Radio batteries, belt clip, traffic cone safety wand, flashlights, chainsaw chaps, forestry helmet, and support equipment. Explosive Ordnance Detection (EOD): Project #39 for 72,500.00 – Vehicle, K-9, equipment and misc., supplies for new K9, veterinary care. Project #49 for 2,866.96 – equipment, supplies and veterinary care Project Closeout Forms to be signed by the Chair — each project has 2 pages to sign. p. 1
- 8Board consideration and authorization for Forsyth County, on behalf of the Sheriff’s Office, to accept an additional $78,000.00 in FY2023 Residential Substance Abuse Treatment (RSAT) Grant funding from the Criminal Justice Coordinating Council (CJCC), with no match required; authorize the Assistant Finance Director to sign related documents; and approve associated Budget Resolutions. Staff requests this Item be considered on a "Time Sensitive" basis - Chief of Staff, Sheriff’s Office - Forsyth County Sheriff's Office secured supplemental funding to settle final-quarter expenses ahead of the upcoming new grant cycle. Time Sensitive — This is approval is for additional funding for the outstanding expenses from the previous quarter and must be accepted and requested, ensuring a clean financial transition into the new grant cycle. Forsyth County has received this RSAT grant for over 10… p. 2
- 9Board ratification for Forsyth County, on behalf of the Sheriff’s Office, to accept the FIFA World Cup Grant additional funding from the Department of Homeland Security's (DHS) Federal Emergency Management Agency (FEMA) through the Georgia Emergency Management Agency (GEMA) and the Atlanta World Cup Host Committee in the amount of $5,363.00 with no match requirement for the purpose of providing security at World Cup events in the Atlanta Metro area and approval of the corresponding Budget Resolution. Staff requests this Item be considered on a " Time Sensitive " basis - Chief of Staff, Sheriff’s Office - Forsyth County Sheriff's Office requested and received $5,363.00 additional funds for personnel hours to bring the total amount of $60,400.00 awarded to the County for the FIFA event. Forsyth County's Sheriff's Office deployed teams that consisted of 23 full time officers divided into… p. 2
- 10Board ratification of an agreement with Palatine Technology Group in the amount of $12,500.00 for Forsyth County Georgia Magistrate Court data migration and with authorization for the County Manager to execute related documents. Staff requests this Item be considered on a " Time Sensitive" basis - CIO, Department of IST p. 2
- 11Board consideration and approval of a 6-year Master Services Agreement between Eagleview and Forsyth County, in the amount of $458,445.00, to provide aerial imagery updates on a bi-annual schedule. Staff requests this Item be considered on a " Time Sensitive" basis - CIO, Department of GIS - Budgeted Item. Requesting it as time sensitive so that the flight of our county can be scheduled. p. 2
- 12Board consideration and approval of a request to the Georgia Department of Transportation (GDOT) for a Traffic Signal on SR 400 Express Lanes at Union Hill Road - Deputy Director, Department of Engineering - GDOT is currently reviewing the traffic engineering study and signal design for the traffic signal on SR 400 Express Lanes at Union Hill Road. GDOT has requested the County complete and sign the Traffic Signal Application for this location. Upon approval by GDOT, the GA 400 Express Lanes Project will fund and construct the traffic signal with the project. p. 2
- 13Board consideration and approval of a Professional Services Agreement with Spicer Group, Inc. in the not to exceed amount of $69,400.00 for the Trammel Road Bridge Deck Replacement Project - Deputy Director, Department of Engineering - Work includes engineering and design services associated with the Trammel Road Bridge Deck Replacement Project over Daves Creek. The project involves replacing the existing timber bridge deck, installing new deck panels with an asphalt overlay and waterproofing membrane, improving roadway approaches, replacing timber railings and walkways, and providing channel stabilization and slope protection. Additional services include surveying, structural engineering, permitting, evaluation of guardrail improvements, preparation of construction plans and specifications, cost estimating, and engineering support during bidding and construction. The agreement includes … p. 2
- 14Board approval of a Task Order with Curbco, Inc. in the amount of $98,235.00 to provide services under the Concrete Repairs As-Needed Agreement (Contract 1202300026) for the Riverstone Plantation project – Deputy Director, Department of Engineering - This Task Order includes removal and replacement of sidewalks and curbs as needed to restore them to a safe, serviceable condition. Grout catch basin (CB) corners as needed to ensure proper sealing and stability. p. 2
- 15Board ratification of an Emergency Sinkhole Repair at 6500 Industrial Way with Townley Construction Company, Inc. in the amount of $138,327.62 - Deputy Director, Department of Engineering - Townley Construction completed sinkhole repair identified in late August at 6500 Industrial Way. The repairs include excavation, removal and replacement of damaged storm drainage infrastructure, installation of a new storm manhole and storm pipe, backfilling, asphalt paving, and site restoration. Due to the emergency nature of the repairs and the potential for further deterioration of the affected area, immediate corrective action is necessary to address safety concerns and restore the storm drainage infrastructure. p. 2
- 16Board consideration and approval of an agreement between Forsyth County and the South Forsyth County Community Improvement District (CID) regarding consent to install artwork - Assistant County Manager (Lucas) - No County financial obligation for the design and installation of Artwork on retaining walls at: a. East side Big Creek Greenway overpass McFarland Pkwy b. West side Big Creek Greenway overpass McFarland Pkwy C. North side Big Creek Greenway overpass Ronald Reagan Blvd d. South side Big Creek Greenway overpass Ronald Reagan Blvd Artwork designed by "Upper Westside Murals", the same designer as existing artwork at Halcyon. p. 2
- 17Board consideration and approval of an Intergovernmental Agreement (IGA) between Forsyth County and Georgia Department of Transportation (GDOT) regarding stockpile storage at Antioch Water Treatment Plant - Assistant County Manager (Lucas) - This IGA will allow GDOT to remove their storage stockpile at Exit 17 to a dedicated site on Antioch WTP property. p. 3
- 18Board consideration and approval of the Annual Software Subscription for Trimble Unity Maintain with Trimble, Inc. in the amount of $65,839.69 for Fiscal Year 2027, $140,464.80 for Fiscal Year 2028, and $147,488.04 for Fiscal Year 2029, with approval of the associated software agreement - Director, Department of Water and Sewer - The Board awarded RFP 16-73-3340 to Timmons Group in 2017 for the implementation of Cityworks, and the County executed a license and maintenance agreement with Azteca Systems, now owned by Trimble, on August 23, 2017. The Board approved continuing the annual licensing and maintenance renewals for the life of the software, with staff returning to the Board if costs increased significantly. Trimble now owns Cityworks and is moving customers to Trimble Unity Maintain (TUM), its cloud platform. Staff requests approval of the Trimble software agreement that upgrades … p. 3
- 19Board consideration and approval of Supplemental Maintenance and Support Services with Timmons Group, Inc. under the Professional Services Agreement for Asset Management - Computerized Maintenance Management System Software Solution (RFP 16-73-3340) in the amount of $394,034.00 for the Trimble Unity Upgrade Project - Director, Department of Water and Sewer - The BOC awarded RFP 16-73-3340 to Timmons Group in 2017 to implement Cityworks for the Department of Water & Sewer, and Timmons has supported the system since, providing supplemental services under the 2017 Professional Services Agreement. Trimble now owns Cityworks and is moving customers to Trimble Unity Maintain, its cloud platform. The work includes migrating the production environment from on-premise to the cloud, auditing the current configuration, and training and transitioning staff. Timmons will complete the work within… p. 3
- 20Board consideration and approval of Task Order No. 4 with Black & Veatch Corporation under the Standard Services Agreement for Water and Sewer Engineering Services As-Needed (Contract No. 1202300004) in the amount of $279,655.00 for the Trimble Unity Maintain Migration Advisory Support Project - Director, Department of Water and Sewer - Black & Veatch (BV) was selected to perform these services under the contract for Water and Sewer Engineering Services As-Needed. This task order provides advisory support for the County's migration from Cityworks to Trimble Unity Maintain, a cloud-based work and asset management system. BV will help the County establish system governance, standardize work order and preventive maintenance processes, recommend configuration improvements, and advance asset management practices. The migration itself will be performed by Timmon's Group, the County's… p. 3
- 21Board consideration and approval of Change Order No. 1 to the Progressive Design Build Agreement with Crowder Construction Company (Contract No. 1202600015) in the amount of $5,769,879.00 for an early equipment allowance for the Antioch Water Treatment Plant Emergency Backup Generator Project. Staff requests this Item be considered on a " Time Sensitive " basis - Director, Department of Water and Sewer - Due to the long lead times for the electrical equipment for the progressive design building (PDB) of the Antioch WTP Emergency Generator Project, the 2500kW, 12.47kV standby diesel fueled generator, the generator switchgear, and the utility entrance switchgear need early ordering. The generator will be capable of operating the conventional and membrane treatment trains and two 700 HP high service pumps, for 18 million gallons per day (MGD) of pump capacity and 24 MGD of treatment… p. 3
- 22Board consideration and approval of Amendment No. 1 to the CIPP Lining of Sewer Pipes and Laterals As-Needed Agreement with Southeast Pipe Survey, Inc. (Contract No. 1202500008) to add additional bid line items to Exhibit "B" (Compensation of Services) - Deputy Director, Department of Water and Sewer - The original bid included sewer pipe sizes from 6" to 12", which encompasses the most common pipe sizes in the sewer collection system. However, we have larger pipes that have been determined to need rehabilitation in our system. This amendment includes larger pipe sizes up to 24" in diameter. Full Length 16 inch x #7.5 MM CIPP LF $215.00 Full Length 18 inch x #9.0 MM CIPP LF $246.00 Full Length 20 inch x 9.0 MM CIPP LF $284.00 Full Length 24 inch x 10.5 MM CIPP LF $301.00 Additional Cost Per 1.5 MM Thickness 16 inch Diameter LF $16.25 Additional Cost Per 1.5 MM Thickness 18 inch Diameter … p. 3
- 23Board consideration and approval of Client Acknowledgment and Novation of Existing Agreements from TranSystems Corporation to GFT Infrastructure Inc. for RFQ 25-55-1514 State Route 369 Passing Lanes Engineering and Design Services and RFP 26-32-1514 Transportation Program Management and Construction Engineering and Inspection Services As-Needed, including all amendments, renewals, modifications, work authorizations, and all task orders issued under these Agreements - Director, Department of Capital Projects - Approval of a Client Acknowledgment and Novation Agreement transferring two existing professional services agreements from TranSystems Corporation to GFT Infrastructure, Inc., including Transportation Program Management and Construction Engineering and Inspection Services (Contract No. 1202600028) and State Route 369 Passing Lanes Engineering and Design Services (Contract No.… p. 3
- 24Board ratification of a deductive Change Order #40 with Vertical Earth, Inc. (Contract # 1202000030) in the amount of $11,285.95 for a ride quality penalty assessed by the Georgia Department of Transportation for the SR 369/SR 400 Bridge (PEW29) - Director, Department of Capital Projects - The Georgia Department of Transportation (GDOT) has assessed a penalty upon the County's contractor, Vertical Earth, Inc., for failing to meet a ride quality test at the SR 369/SR 400 bridge. Therefore, the County asked the contractor to submit a deductive change order in the amount of $11,285.95 to apply a credit to Contract #1202000030. The County Manager has approved the credit to be applied to the Vertical Earth, Inc. contract. p. 3
- 25Board consideration and approval of Deductive Change Order #41 with Vertical Earth, Inc. (Contract #1202000029) to reduce the contract value by $257,634.79 and reconcile the final quantities for the SR 369 Widening portion of the SR369/SR400 Project (PEW29). Staff requests this Item be considered on a “ Time Sensitive ” basis – Director, Department of Capital Projects - This item will reconcile the final quantities of materials for the SR 369 Widening portion of the SR 369 Widening / SR 400 Interchange Project (PEW29). This is the final change order for this project and will close the agreement between the County and Vertical Earth, Inc. Staff requests this item be considered time sensitive as we're trying to close this project by the end of the calendar year. p. 3
- 26Board consideration and approval of Commitment Change Order #002 to Contract #1202600019 with MAPP, LLC for the Sharon Springs Park Campus Renovations in the amount of $0 - Senior Capital Projects Manager (Madsen), Department of Capital Projects - This CCO is a consolidation of additive and deductive Potential Change Orders (PCOs) and weather impact days, including use of an allowance and owner-directed contingency for additional of a restroom building at Sharon Springs Park. p. 4
- 27Board consideration and approval of a Water Easement for Forsyth County Water and Sewer at the Bennett Park Redevelopment Project - Senior Project Manager (Madsen), Department of Capital Projects - This easement is for access to the water vault installed for the park project. p. 4
- 28Board consideration and approval of Change Order #002 to Contract #1202500016 with Townley Construction Company for a time extension (no associated cost) for the Coal Mountain Park Sewer Improvements (P18CM) - Project Manager (Wilson), Department of Capital Projects - This change order is the final change order. Construction is complete and the warranty period has started. The time extension was granted as the contractor completed change order work and multiple requests outside the contract documents. The attached document 'Additional Work Performed with No Additional Time' lists these items. p. 4
- 29Board consideration and approval to award quote 27-09-1620 to Kept Companies of NJ, Inc. d/b/a Fleetwash in the amount of $31,372.73 for Kitchen Exhaust Systems Inspection, Cleaning, and Maintenance at various County locations for the Department of Public Facilities with the approval of the associated General Services Agreement - Director, Department of Public Facilities - Quote was issued August 27, 2026 with a September 24, 2026 closing date. Two (2) firms submitted a quote. Public Facilities has reviewed and concurs with the recommendation. This agreement is for calendar years 2027, 2028, and 2029. This item is budgeted. p. 4
- 30Board consideration and approval of a Task Order with Hussey, Gay, Bell & DeYoung in the amount of $172,720.00 for Design Services at the Hightower Road Landfill for the Driver Training Facility with approval of the associated General Services Agreement - Director, Department of Public Facilities - Engineering design services for a Driver Training Facility at the Hightower Road Landfill. p. 4
- 31Board consideration and approval to award Bid 26-77-1620 to EOLA Power, LLC in the amount of $104,434.63 for the UPS (Uninterruptible Power Supply) Unit & Battery Replacement at the Public Safety Complex for the Department of Public Facilities with approval of the associated General Services Agreement - Director, Department of Public Facilities - The Bid was issued August 5, 2026, with a September 24, 2026 closing date. Eight (8) firms submitted a Bid. Public Facilities has reviewed and concurs with the recommendation. This project includes the safe removal and disposal of the current UPS System and installation of a new Reillo UPS, battery cabinet, maintenance bypass, complete testing and staff training. The contractor must provide all labor, materials, permits, equipment, and supervision necessary to complete the work in compliance with applicable safety, environmental, and… p. 4
- 32Board consideration and approval to enter into an agreement with SCANA Energy Marketing, LLC via Georgia State Contract Number 99999-001-SPD0000153-0001, for Natural Gas service in 2027 for County Facilities with approval of the associated contract – Director, Department of Public Facilities - SCANA Energy Marketing, LLC will provide the County with Natural Gas service for all metered locations. The fixed fee of $0.505 per therm will begin in the January 2027 billing cycle and will continue through the December 2027 billing cycle. p. 4
- 33Board consideration and approval to award ITQ 27-04-1500 to A1 Shredding and Recycling, Inc. for Document & Record Destruction Services As-Needed for the Department of Public Facilities with approval of the associated General Services Agreement – Director, Department of Public Facilities - The quote was issued September 9,2026, with an October 8, 2026, closing date. One firm submitted a Quote. Public Facilities has reviewed and concurs with the recommendation. The service agreement includes providing all necessary materials, equipment, and labor to perform Document and Record Destruction Services at designated Forsyth County locations for calendar years 2027, 2028, and 2029. p. 4
- 34Board consideration and approval of a Services Agreement with CPL Architects, Engineers and Landscape Architect, D.P.C. (P.C.) for Architectural Design Review Services for the Department of Planning and Community Development – Director, Department of Planning and Community Development - The Contractor to provide architectural design review services of development plans and construction details specifically for building facades of a proposed development. Review services may also include structures, hardscape features, and other design details. The intent of the review process is to ensure that new development exhibits high quality design, key characteristics of specified architectural styles, and continuity with future development while maintaining compliance with all conditions and county code requirements. General Conditions A. Contractor shall complete reports within 10 business days… p. 4
- 35…consideration and possible direction of a Board generated rezoning for ZA4108, Vijay Garlapati. In accordance with UDC 8-5.5(I), if an application for a land disturbance permit has not been submitted within 18 months of zoning approval, the Board may consider rezoning to a constitutional zoning designation - District 1 – Director, Department of Planning and Community Development (Postponed from the April 8, 2025, October 6, 2026 and October 20, 2026 Agendas) - On January 6, 2023, the applicant requested to rezone from Agricultural District (A1) and Single Family Residential District (R1) to Commercial Business District (CBD). On May 18, 2023, the Board of Commissioners approved the request to rezone from Agricultural District (A 1) and Single Family Residential District (R1) to Commercial Business District (CBD) for a day care center, an indoor commercial recreational facility and… p. 5
- 36Board consideration and possible direction regarding a County-Initiated Conditional Use Permit (CUP) to build a new dance studio on property zoned Commercial Business District (CBD) with a variance to 1. Reduce the buffer abutting Georgia Highway 400 adjacent to the existing drainage easement only from 40 ft. to 0 ft. (UDC 10-1.10(A)(1), parcel 218-040 - District 1 - Hill / Moore - Property is located northeast of property known as 2445 Freedom Parkway, Cumming, GA 30041. p. 5
- 37Board consideration of a proposed Unified Development Code (UDC) amendment, amending UDC Chapter 10, to terminate any short-term rental property continuing to operate under a claim of legal nonconforming status, irrespective of the merits or lack of merits of such claim of nonconforming status, by May 1, 2027 - County Attorney p. 5
- 38Freedom Park property discussion - Hill / Moore p. 5