Agendaimg1.wsimg.comAgendaCurrent Chapter 1 GENERAL PROVISIONS with chanAgendaNew Chapter 1 General Provisions with changesAgendaCurrent Chapter 3 ANIMALS AND FOWLAgendaNew Chapter 3 ANIMALS AND FOWL with changes fAgendaChap 4 Buildings with changes as of 4 10 2023AgendaChapter 4 Buildings section 4 4 Schedule of FAgendaCurrent Chapter 8 GARBAGE, REFUSE AND WEEDSwitAgendaCurrent Chapter 1 GENERAL PROVISIONS with chanAgendaNew Chapter 1 General Provisions with changesAgendaCurrent Chapter 3 ANIMALS AND FOWLAgendaNew Chapter 3 ANIMALS AND FOWL with changes fAgendaChap 4 Buildings with changes as of 4 10 2023AgendaChapter 4 Buildings section 4 4 Schedule of FAgendaCurrent Chapter 8 GARBAGE, REFUSE AND WEEDSwitAgendaNew Chapter 1 General Provisions with changesAgendaCurrent Chapter 3 ANIMALS AND FOWLAgendaNew Chapter 3 ANIMALS AND FOWL with changes fAgendaChap 4 Buildings with changes as of 4 10 2023AgendaChapter 4 Buildings section 4 4 Schedule of FAgendaCurrent Chapter 8 GARBAGE, REFUSE AND WEEDSwit
Minutesnot posted yet
Meeting page ↗saintgeorgesc.org3 items on this agenda match the land-use topicsMobile homes & RV (3)
Agenda items (21)Show only the 3 matching
- …ces governing these areas. Sec. 4-1. Building permits, fees, inspections and penalties. Sec. 4-2. Building Inspector / Code Enforcement. Sec. 4-3. Manufactured Housing Tie Down Standards and Fees. Sec. 4-4. Schedule of Fees. Sec. 4-5. Regulations for Licensing Contractors in the State of South Carolina. Sec. 4-6. Code Enforcement Procedure. Sec. 4-7. Standards of design, construction and materials for buildings and for electrical wiring, gas and plumbing systems thereof, and certain appliances used therein. Sec. 4-8. Restrictions applicable to removal or demolition of buildings. Sec. 4… p. 1
- (d) Training and Experience: Graduation from high school or an equivalent recognized certificate. Basic construction skills in such areas as electrical, plumbing, building, concrete masonry, and mechanical systems is preferred. At least five (5) years of training or experience is desired. Ability to obtain ICC certification or actively seeking certification within one (1) year of hire. Sec. 4-3. Manufactured Housing Tie Down Standards and Fees. The schedule of fees for manufactured homes is as follows: p. 1
- (b) A permit filing fee of Fifty ($50.00) dollars shall apply. The requirements set forth in this amendment of installation instructions for manufactured housing, are as outlined in the International Building Code, Appendix H and the National Electrical Code, Section 550. Prior to inspection, all work will be complete, steps with handrails installed as outlined, and address posted. Access to the inside of the manufactured home may be required, if the home has been altered from the original design. Required Piers and Anchorage: New Homes: Use installation I set-up manual that comes with new man… p. 1
- 2. Wiring from the service pole/post disconnect to the mobile home shall consist of four conductors, one of which must be a minimum size of #6 insulated copper wire for grounding purposes only. 200 amp service requires a minimum size #2/0 copper of ##4/0 aluminum conductor. p. 1
- 3. Service entrance to mobile home must be buried to a minimum depth of 18" when in conduit and a minimum of 24" when using direct bury cable type "USE". Note: Trench must be left open for inspection. p. 1
- 1. Drain lines must be connected between mobile home and either septic tank or public sewer connection. Trench must be left open for inspection. p. 1
- 3. A minimum 3' x 3' landing shall be required outside each egress door. Underpinning: Underpinning or skirting is required on all new and used manufactured homes. Underpinning materials shall be classified as follows: brick, concrete blocks, vinyl, or sheet metal. Address Numbers: All homes must have numbers (with a minimum height of 3 inches) attached to the home for emergency identification. Sec. 4-4. Schedule of Fees. Building Permit Fees: Building Permit Fees Based on Valuation: p. 1
- …ces governing these areas. Sec. 4-1. Building permits, fees, inspections and penalties. Sec. 4-2. Building Inspector / Code Enforcement. Sec. 4-3. Manufactured Housing Tie Down Standards and Fees. Sec. 4-4. Schedule of Fees. Sec. 4-5. Regulations for Licensing Contractors in the State of South Carolina. Sec. 4-6. Code Enforcement Procedure. Sec. 4-7. Standards of design, construction and materials for buildings and for electrical wiring, gas and plumbing systems thereof, and certain appliances used therein. Sec. 4-8. Restrictions applicable to removal or demolition of buildings. Sec. 4… p. 1
- (d) Training and Experience: Graduation from high school or an equivalent recognized certificate. Basic construction skills in such areas as electrical, plumbing, building, concrete masonry, and mechanical systems is preferred. At least five (5) years of training or experience is desired. Ability to obtain ICC certification or actively seeking certification within one (1) year of hire. Sec. 4-3. Manufactured Housing Tie Down Standards and Fees. The schedule of fees for manufactured homes is as follows: p. 1
- (b) A permit filing fee of Fifty ($50.00) dollars shall apply. The requirements set forth in this amendment of installation instructions for manufactured housing, are as outlined in the International Building Code, Appendix H and the National Electrical Code, Section 550. Prior to inspection, all work will be complete, steps with handrails installed as outlined, and address posted. Access to the inside of the manufactured home may be required, if the home has been altered from the original design. Required Piers and Anchorage: New Homes: Use installation I set-up manual that comes with new man… p. 1
- 2. Wiring from the service pole/post disconnect to the mobile home shall consist of four conductors, one of which must be a minimum size of #6 insulated copper wire for grounding purposes only. 200 amp service requires a minimum size #2/0 copper of ##4/0 aluminum conductor. p. 1
- 3. Service entrance to mobile home must be buried to a minimum depth of 18" when in conduit and a minimum of 24" when using direct bury cable type "USE". Note: Trench must be left open for inspection. p. 1
- 1. Drain lines must be connected between mobile home and either septic tank or public sewer connection. Trench must be left open for inspection. p. 1
- 3. A minimum 3' x 3' landing shall be required outside each egress door. Underpinning: Underpinning or skirting is required on all new and used manufactured homes. Underpinning materials shall be classified as follows: brick, concrete blocks, vinyl, or sheet metal. Address Numbers: All homes must have numbers (with a minimum height of 3 inches) attached to the home for emergency identification. Sec. 4-4. Schedule of Fees. Building Permit Fees: Building Permit Fees Based on Valuation: p. 1
- …ces governing these areas. Sec. 4-1. Building permits, fees, inspections and penalties. Sec. 4-2. Building Inspector / Code Enforcement. Sec. 4-3. Manufactured Housing Tie Down Standards and Fees. Sec. 4-4. Schedule of Fees. Sec. 4-5. Regulations for Licensing Contractors in the State of South Carolina. Sec. 4-6. Code Enforcement Procedure. Sec. 4-7. Standards of design, construction and materials for buildings and for electrical wiring, gas and plumbing systems thereof, and certain appliances used therein. Sec. 4-8. Restrictions applicable to removal or demolition of buildings. Sec. 4… p. 1
- (d) Training and Experience: Graduation from high school or an equivalent recognized certificate. Basic construction skills in such areas as electrical, plumbing, building, concrete masonry, and mechanical systems is preferred. At least five (5) years of training or experience is desired. Ability to obtain ICC certification or actively seeking certification within one (1) year of hire. Sec. 4-3. Manufactured Housing Tie Down Standards and Fees. The schedule of fees for manufactured homes is as follows: p. 1
- (b) A permit filing fee of Fifty ($50.00) dollars shall apply. The requirements set forth in this amendment of installation instructions for manufactured housing, are as outlined in the International Building Code, Appendix H and the National Electrical Code, Section 550. Prior to inspection, all work will be complete, steps with handrails installed as outlined, and address posted. Access to the inside of the manufactured home may be required, if the home has been altered from the original design. Required Piers and Anchorage: New Homes: Use installation I set-up manual that comes with new man… p. 1
- 2. Wiring from the service pole/post disconnect to the mobile home shall consist of four conductors, one of which must be a minimum size of #6 insulated copper wire for grounding purposes only. 200 amp service requires a minimum size #2/0 copper of ##4/0 aluminum conductor. p. 1
- 3. Service entrance to mobile home must be buried to a minimum depth of 18" when in conduit and a minimum of 24" when using direct bury cable type "USE". Note: Trench must be left open for inspection. p. 1
- 1. Drain lines must be connected between mobile home and either septic tank or public sewer connection. Trench must be left open for inspection. p. 1
- 3. A minimum 3' x 3' landing shall be required outside each egress door. Underpinning: Underpinning or skirting is required on all new and used manufactured homes. Underpinning materials shall be classified as follows: brick, concrete blocks, vinyl, or sheet metal. Address Numbers: All homes must have numbers (with a minimum height of 3 inches) attached to the home for emergency identification. Sec. 4-4. Schedule of Fees. Building Permit Fees: Building Permit Fees Based on Valuation: p. 1