- …l Area where the intent is to preserve open space and rural function of land (per the Comprehensive Plan vision for those areas as articulated in the Future Land Use chapter), and so am proposing 20’ side and rear setbacks in those areas. ○ Lot coverage was previously 30% for lots using septic systems and 50% for lots on sewer. I kept these requirements the same for lots utilizing septic system(s) and within the Growth Area as designated by the Town’s adopted Compreh p. 2
- ● Chapter 7: Subdivision Review: First, you’ll recall that LD1829 increased the state definition of a subdivision from 3 or more dwelling units to 5 or more dwelling units (number of lots remains unchanged). See 30-A M.R.S.A sec. 4401. I didn’t need to make an edit here since our applicability criteria just references the state law definition, but you should be aware of this. ○ In this chapter, I also made a number of minor changes for clarity and to outline the application and review procedure with the Town Planner or other designated staff person (leaving this intentionally broad in case thi… p. 3
- …parcel, with a proposed 15-acre limit of disturbance and 6.05 acre fenced-in solar array Request: Planning Board Review – Large-Scale Ground-Mounted Solar Energy System Introduction: The applicant is before the Planning Board requesting an extension of the approval previously granted on November 14, 2024 for a large-scale (defined as a solar energy system whose physical size based on total airspace projected over a roof or the ground is equal to or greater than 17,000 s.f.) ground-mounted solar energy system located at 235 South Monmouth Road (Tax Map 8, Lot 20) to construct a 1.0 MW AC solar… p. 1
- a. Approval extension request from Kennebec County ME S1, LLC dba SolAmerica Energy for a large-scale solar project at 235 South Monmouth Road (Tax Map 8 Lot 2) – originally approved on November 14, 2024 (Notice of Decision dated November 19, 2024) p. 1
- …ards outlined in Section 6.3.2 (referencing relevant standards of 6.3.1), with additional review standards for Medium- and Large-Scale Ground-Mounted Solar Energy Systems as outlined in Section 6.8.9.3. Submission Chronology: ● Application Received: March 4, 2024 ● Application Deemed Complete: March 14, 2024 ● Site Walk Held: April 18, 2024 ● Application Originally Approved: November 14, 2024 ● Approval Extension Granted: September 11, 2025 Review Items: The applicants have submitted a cover letter explaining the rationale for their request for approval extension. This was submitted 10 days pr… p. 2
- …Chair Monmouth Planning Board 859 Main Street Monmouth, ME 04259 RE: Permit Extension – Town of Monmouth Comprehensive Development Ordinance Monmouth Solar Project Kennebec County ME S1, LLC Dear Mr. O’Donnell, On behalf of Kennebec County ME S1, LLC, an affiliate of SolAmerica Energy, LLC (Applicant), TRC Companies, Inc. (TRC) officially requests an extension of the Monmouth Solar Project’s (Project) approval under the Town of Monmouth’s Comprehensive Development Ordinance. The proposed 0.999-megawatt (MW-ac) ground mounted solar electric generation facility will occupy 6.05 acres on a 41-acr… p. 3
- S1, LLC, is a subsidiary of SolAmerica, LLC. SolAmerica, LLC has extensive experience in solar projects similar to the proposed project. The applicant has retained qualified professionals to assist in the preparation of the application and accompanying plans. The applicant will lease and maintain the project in perpetuity and has provided an adequate decommissioning plan and will be required to submit a financial guarantee to cover the costs of decommissioning for the project. This is further outlined in item 6 related to Sec. 6.8.9.4.6, below. . 6.3.1.8: Impact on Adjoining Municipality: As t… p. 11
- …ing Municipal Land Use Decisions,” which was signed into law on June 20, 2025 ● LD2173, “An Act to Update the Laws Regarding Housing Developments and Accessory Dwelling Units.” This amendment was meant to clarify and address several issues with LD1829, and was signed into law on April 16, 2026 ● LD427, “An Act to Regulate Municipal Parking Space Minimums,” which was also signed into law on June 20, 2025 My memo and the presentation provided during the May 14, 2026 Planning Board meeting provides additional insight into all of these bills and their specific implications for Monmouth. Summar p. 1