Town of Lake George, NY · pop. 4K
Tue17Nov
Consolidated Board of Health
Tue Nov 17 · 5 days ago
November 17, 2026 Consolidated Board of Health
This agenda in plain words
Leer en españolThis is a regular meeting of the Consolidated Board of Health for the Town of Lake George, held Tuesday, November 17, 2026 at 12:00 pm. The main item is a request from Linda Varley to replace a failed septic system at 812 Diamond Point Road, which needs two variances (permission to build closer than the normal distance to a house and to a stream).
- A request to replace the septic system (wastewater system) at 812 Diamond Point Road. The old system failed an inspection. The new one includes a new septic tank, a distribution box, and a disposal field using a sand filter product. Touches: Owner of 812 Diamond Point Road (Tax Map No. 225.08-1-10); applicant Linda Varley, with Kevin Hastings, P.E. as agent. p. 1
- A variance request: permission to place the absorption trench 12 feet from the dwelling, where 20 feet is required. That is a variance of 8 feet. Touches: 812 Diamond Point Road. p. 1
- A variance request: permission to place the absorption trench 100 feet from a stream, where 200 feet is required. That is a variance of 100 feet. Touches: 812 Diamond Point Road. p. 1
Words on this agenda, explained
- Variance
- Permission to not follow a rule exactly, such as building closer to a house or stream than the rule normally allows.
- Absorption trench
- The part of a septic system, buried in the ground, where treated wastewater soaks into the soil.
- Distribution box
- A box in a septic system that splits wastewater evenly among the pipes of the disposal field.
- Disposal field
- The area of buried pipes and soil where a septic system releases its treated wastewater.
- Agent
- A person who speaks and acts for the property owner in the request.
- Written communications
- Letters or other written comments about an item, which must be sent to the named clerk before the meeting to be considered.
Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
1 item on this agenda matches the land-use topicsVariances (1)
Agenda items (1)Show only the 1 matching
- …ion. The disposal field will be constructed with “Eljen GSF” B43 geotextile sand filter product which will provide secondary treatment of effluent. * Variance is requested for the distance between the absorption trench and dwelling where 20ft is required and 12 ft is proposed for a variance of 8 ft. * Variance is requested for the distance between an absorption trench and a stream where 200 ft is required, and 100 ft is proposed for a variance of 100 ft. For property located at 812 Diamond Point Road – Tax Map No. 225.08-1-10. All written communications to be considered by the Board at this me… p. 1