Feed › New York › Town of Fishkill
Variance — Fishkill
Town of Fishkill, Zoning Board of Appeals. Variance. First seen on an agenda Nov 13, 2026.
- On an agendaJul 21
- Last meetingZoning Board of Appeals, Tue Aug 18 2 meetings so far
- DecisionNot posted yet Minutes often come weeks after the meeting
From govmeet.us/app/case/8833108, November 23, 2026
The line on the agenda
1. ZBA Application No.: ZB26-002 - 2 Sandra Place - Area Variances - Applicant is requesting the following variances for the construction of a 12’ x 25’ addition to an existing detached garage: • A 2’ 4” front yard setback, where 35’ is the minimum required front yard setback in the R-20 Zoning District. The granting of this variance will result in a 32’ 8” front yard setback. • A 3’7” rear right side yard setback, where 10’ is the minimum required rear right side yard setback in the R-20 Zoning District. The granting of this variance will result in a 6’ 5” right side yard setback. • A 4’ 5” f…
Zoning Board of Appeals, July 21, 2026. Agenda, p. 1 · Meeting page.
The record
What the filing states, field by field.
15 more fields not read from the filing yet
Case numbers, request, zoning, acres, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Jul 21
Zoning Board of Appeals
- Aug 18
Zoning Board of Appeals
Earlier cases like this in Town of Fishkill
124 earlier cases of the same kind on its agendas since 2021.
- May 2026…or as soon thereafter as possible - ZBA Application No.: ZB26-001 - Willow Lake Partners Group, LLC - The…
- May 2026A 21.3’ front yard setback variance from the front road centerline for the proposed Valet Check Out…
- May 2026A 22.2’ front yard setback variance from the front lot line for the proposed Valet Check Out Building…
- May 2026A 15’ wall height variance, where 6’ is the maximum wall height permitted. Said variance will result in a…
- May 2026A construction on steep slopes variance to allow disturbance of approximately 0.11 acres of 55.87 acres of…
- Apr 2026A construction on steep slopes variance to allow disturbance of approximately 0.11 acres of 55.87 acres of…