GovMeet
Sign in

Feed › Georgia › Cobb County

Met Nov 19, result not posted yet

Plat — Cobb County

Cobb County, BOC Regular Meeting. Plat. First seen on an agenda Nov 13, 2026.

  1. On an agendaNov 13
  2. Last meetingBOC Regular Meeting, Thu Nov 19
  3. DecisionNot posted yet Minutes often come weeks after the meeting

Track this case

From govmeet.us/app/case/8698979, November 22, 2026

The line on the agenda

…to provide design services for the Glenleigh Park Subdivision detention pond dam repair. The scope of the services includes data collection, geotechnical investigation, preliminary and detailed designs, preparation of permit and bid documents, and bid assistance. Geosyntec Consultants, Inc. completed the concept design for the failed wall and streambank restoration; however, the permitting process was delayed by factors beyond their control. The proposed design was reviewed by the U.S. Army Corps of Engineers (USACE) to confirm eligibility under the Nationwide Permit 3 - Maintenance. Although USACE ultimately concurred, the review process took longer than anticipated. On November 12, 2024, the Board of Commissioners approved Supplemental Agreement No. 1 with Geosyntec Consultants, Inc., extending the agreement through December 1, 2025. Geosyntec Consultants, Inc. submitted permit application packages to Cobb County Community Development, USACE, and Georgia Environmental Protection Division (EPD). Because the Land Disturbance Permit had not been issued prior to the City of Mableton assuming jurisdiction, an additional application was required through the City. On November 20, 2025, …

BOC Regular Meeting, November 19, 2026. Agenda, p. 1 · Meeting page.

The record

What the filing states, field by field.

15 more fields not labeled in the filing

Case numbers, request, zoning, acres, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. A name that stands in the text without a role, such as applicant or owner, is not counted.

Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.

Who is behind it

The agenda line names it; it does not say in what role.

Every step, from the agendas and minutes

  1. Nov 19

    BOC Regular Meeting

    Agenda page, p. 1