Feed › Illinois › Village of Sugar Grove
Infrastructure — Sugar Grove
Village of Sugar Grove. Infrastructure. First seen on an agenda Nov 13, 2026.
- On an agendaNov 6
- Last meetingMeeting, Mon Nov 23 17 meetings so far
- DecisionNot posted yet Minutes often come weeks after the meeting
From govmeet.us/app/case/8616289, November 24, 2026
The line on the agenda
…Railroad St. Water Tank rehabilitation. These projects total over $4 million, to go along with the estimated $3 million utilities relocation for the widening of IL-47. It was determined after a discussion with IEPA, the best option to apply for is Maple/Joy and Water Tank projects, rather than the widening project. The attached resolution authorizes Karin Johns or her designee to sign the loan application documents for the above referenced projects. COST There is no cost for approving this resolution. ATTACHMENTS • A Resolution authorizing representative to sign loan documents. RECOMMENDATI
Meetings, November 8, 2026. Agenda, p. 1 · Meeting page.
The record
Every value links to the agenda or minutes line it came from: tap “from the agenda” to read it.
- Request
- Maple Street and Joy Court water main replacement; Railroad St. water tank rehabilitation, funded via IEPA Public Water Supply Loan Program application
The attached resolution authorizes Karin Johns or her designee to sign the loan application documents for the above referenced projects
- Conditions
- Resolution passed by Village Board of Trustees; staff recommends approval
Staff recommends approval of the attached Resolution
- Engineer, attorney
- Engineering Enterprise, Inc. (contracted by the Village to work on the Project Plan)
The Village contracted Engineering Enterprise, Inc. to work on the Project Plan to submit to the IEPA for a low-interest loan
- Amount
- projects total over $4 million
These projects total over $4 million, to go along with the estimated $3 million utilities relocation for the widening of IL-47
11 more fields not labeled in the filing
Case numbers, zoning, acres, units, square feet, votes, applicant, owner, developer, parcel, where. A name that stands in the text without a role, such as applicant or owner, is not counted.
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Who is behind it
- Engineer, attorney or agentEngineering Enterprise, Inc. (contracted by the Village to work on the Project Plan)
Engineering Enterprise on other agendas · Alert me when it is named again · State registry · LinkedIn · Web
Named as the filing names them.
Every step, from the agendas and minutes
- Nov 6
Meetings
- Nov 7
Meetings
- Nov 8
Meetings
- Nov 10
Meetings
- Nov 11
Meetings
- Nov 12
Meetings
- Nov 13
Meetings
- Nov 14
Meetings
- Nov 15
Meetings
- Nov 16
Meetings
- Nov 17
Meetings
- Nov 18
Meetings
- Nov 19
Meetings
- Nov 20
Meetings
- Nov 21
Meetings
- Nov 22
Meetings
- Nov 23
Meetings
Earlier cases like this in Village of Sugar Grove
1 earlier case of the same kind on its agendas since 2026.