GovMeet
Sign in

Feed › Alaska › Borough of Fairbanks North Star

Met Aug 19, result not posted yet

Plat, 1.06 acres — Fairbanks North Star

Borough of Fairbanks North Star, Platting Board. Plat. First seen on an agenda Nov 7, 2026.

  1. On an agendaAug 19
  2. Last meetingPlatting Board, Wed Aug 19
  3. DecisionNot posted yet Minutes often come weeks after the meeting

Track this case

From govmeet.us/app/case/843176, November 23, 2026

The line on the agenda

SD018-26: Alaska Adventure Camp Subdivision A request by Degerlund Engineering, LLC, on behalf of Alaska Adventure Camp, LLC, to subdivide Government Lot 6, Section 6, T.1S., R.2E., F.M., into ten lots ranging in size from approximately 1.06 acres to 1.45 acres, and a remainder tract of approximately 23.21 acres. The request also dedicates 60 feet of right-of-way for the extension of Pegasus Drive. The property is located within the SW¼ SE¼ Section 6, T.1S., R.2E., F.M., with proposed access from Pegasus Drive. ( Staff Contact: Dave Ruzicka)

Platting Board Meeting, August 19, 2026. Agenda, p. 2 · Minutes · Meeting page.

The record

What the filing states, field by field.

Acres
1.06read from the agenda line
14 more fields not read from the filing yet

Case numbers, request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.

Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices

Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.

From the minutes

Result
Approved with conditions · Vote 7–0
Vote
Motion carried 7 Yeses, 0 Noes. Yeses: Pitney, Guthrie, Thatcher, Perkins, Brooks, LeVan, Berman Williams. Noes: None.
Recommended
Staff recommended approval (with five conditions per staff report, as referenced in the findings)
Conditions
  • GVEA shall have a maximum of 30 calendar days to review and comment on the final plat
  • IGU shall have a maximum of 10 calendar days to review and comment on the final plat
  • Pegasus Drive constructed to FNSBC Title 17 Minor Collector Road standards and inspected/approved by FNSB Public Works Engineer
  • Applicant installs road name signs per FNSBC 17.60.010(D)
  • All easements of record shown on final plat
  • Benchmark shown on final plat within 1,000 feet of each parcel
  • Accurate base flood elevation shown on final plat, reviewed by Floodplain Administrator
  • Flood-related note added to plat (remaining text truncated in minutes)
MOTION CARRIED Pitney, Guthrie, Thatcher, Perkins, Brooks, LeVan, Berman Williams None 7 Yeses, 0 Noes

Read from the meeting's minutes by AI; the quote is copied from them.

Who is behind it

The agenda line names it; it does not say in what role.

Every step, from the agendas and minutes

  1. Aug 19

    Platting Board

    Agenda page, p. 2