GovMeet
Sign in

Feed › Arkansas › City of Fayetteville

Met Nov 10, result not posted yet

Infrastructure — Fayetteville

City of Fayetteville, Water, Sewer and Solid Waste Committee. Infrastructure. First seen on an agenda Nov 7, 2026.

  1. On an agendaNov 7
  2. Last meetingWater, Sewer and Solid Waste Committee, Tue Nov 10
  3. DecisionNot posted yet Minutes often come weeks after the meeting

Track this case

From govmeet.us/app/case/840431, November 24, 2026

The line on the agenda

…The City currently operates an aging 8-inch diameter waterline along South Cato Springs Road just south of the Fulbright Expressway interchange. This section of waterline creates a bottleneck to other 12-inch and 18-inch diameter lines feeding through the Kessler Regional Park up to the Kessler Ground Storage Tanks. With South Cato Springs Holdings, LLC, working with competent contractors in the immediate vicinity, this cost share will allow the City to realize cost savings and efficiencies compared to a stand-alone contract. Engineering design and permitting was recently completed by Crafton, Tull & Associates, Inc. (RFQ# 25-01). South Cato Springs Holdings, LLC has provided contractor pricing in-line with engineering estimates from a qualified utility contractor. Since this work is not required due to development and has been requested by the utility, the City would contribute 100% of all funds necessary for the waterline upsizing. STAFF REQUESTS THIS ITEM BE FORWARDED TO THE CITY COUNCIL WITH A RECOMMENDATION FOR APPROVAL

Water, Sewer & Solid Waste Committee (Immediately Following City Council Agenda Session), November 10, 2026. Agenda, p. 3 · Meeting page.

The record

What the filing states, field by field.

Case numbers
D.5.
14 more fields not read from the filing yet

Request, zoning, acres, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.

Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices

Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.

Who is behind it

The agenda line names it; it does not say in what role.

Every step, from the agendas and minutes

  1. Nov 10

    Water, Sewer and Solid Waste Committee

    Agenda page, p. 3