Feed › Florida › Indian River County
Industrial — Indian River County
Indian River County, Board of County Commissioners. Industrial. First seen on an agenda Oct 19, 2026.
- On an agendaOct 6
- Last meetingBoard of County Commissioners, Tue Oct 6
- DecisionNot posted yet Minutes often come weeks after the meeting
From govmeet.us/app/case/71094, November 22, 2026
The line on the agenda
…for Sand Strainer Evaluation and Design for Hobart Water Production Facility Sand Strainer Improvements, IRCDUS Project ID: 12.26.524 - The Indian River County Department of Utility Services (County) operates the Hobart Water Production Facility (WPF) to provide potable water service to its customers. The WPF has a treatment capacity of 11.4 million gallons per day (MGD) and an average daily flow of approximately 7.0 MGD. The facility’s raw water supply is obtained from the Upper Floridan Aquifer through nine (9) groundwater wells located both on and off the WPF site. Raw water from the wells is conveyed to the WPF through two (2) 20-inch-diameter pipelines. Each pipeline is reduced to 16 inches in diameter before entering the sand strainer system manufactured by Hydac International. The sand strainers provide initial pretreatment by removing coarse sand and other larger particulates from the raw water. The strained water is then combined into a single 24-inch-diameter raw water pipeline, which conveys the flow to the membrane treatment process. A static mixer is located within the 24-inch pipeline immediately upstream of the membrane treatment process building to facilitate…
Board of County Commissioners Meeting, October 6, 2026. Agenda, p. 2 · Recording · Meeting page.
The record
What the filing states, field by field.
15 more fields not read from the filing yet
Case numbers, request, zoning, acres, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Who is behind it
- Named in the agenda lineTetra Tech
Tetra Tech on other agendas · Alert me when it is named again · State registry · LinkedIn · Web
The agenda line names it; it does not say in what role.
Every step, from the agendas and minutes
- Oct 6
Board of County Commissioners