GovMeet
Sign in

Feed › Georgia › Barrow County

Met Sep 8, result not posted yet

Rezoning, 13.99 acres — Barrow County

Barrow County, Board of Commissioners. Industrial land, Rezoning. First seen on an agenda Nov 5, 2026.

  1. On an agendaSep 8
  2. Last meetingBoard of Commissioners, Tue Sep 8
  3. DecisionNot posted yet Minutes often come weeks after the meeting

Track this case

From govmeet.us/app/case/622420, November 22, 2026

The line on the agenda

d) BOC2026-00074 (XX051 053A; XX052 069, 070A, 070E, 070F) 0 Patrick Mill Rd, 190 & 162 Old Bill Rutledge Rd; Sullins Engineering / Applicant; Rockwell Properties, LLC / Owner. Request to rezone ±13.986 acres from AG, AR & AC (Agriculture – Residential & Commercial) to M-1 (Light Industrial) for a small industrial park. Board of Commissioners Voting Session – September 8, 2026 1

Board of Commissioners, September 8, 2026. Agenda, p. 1 · Minutes · Recording · Meeting page.

The record

What the filing states, field by field.

Acres
13.99read from the agenda line
14 more fields not read from the filing yet

Case numbers, request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.

Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices

Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.

From the minutes

Recommended
Staff recommended approval of the rezoning from AG, AR and AC to M-1 for an eleven-lot industrial business park, with conditions.
Conditions
  • Limited to a maximum of eleven industrial lots as shown on Exhibit A
  • Remove two driveways and two residential structures before final plat recording
  • 50-foot structural zoning buffers installed and maintained where adjoining residential property
  • Traffic Impact Study submitted and reviewed during land disturbance permitting
  • Patrick Mill Road access points reviewed and approved by GDOT
  • No direct driveway access except through approved access locations
  • Individual lot uses must comply with M-1 permitted and special-use requirements
  • Shared access, inter-parcel, utility, stormwater easements and maintenance agreements recorded on final plat

Read from the meeting's minutes by AI; the quote is copied from them.

Who is behind it

The agenda line names it; it does not say in what role.

Every step, from the agendas and minutes

  1. Sep 8

    Board of Commissioners

    Agenda page, p. 1 · Recording