Feed › Florida › City of Jacksonville
Planned development — Jacksonville
City of Jacksonville, Land Use & Zoning Committee. PUD. First seen on an agenda Oct 31, 2026.
- On an agendaOct 31
- Last meetingLand Use & Zoning Committee, Wed Nov 4
- DecisionNot posted yet Minutes often come weeks after the meeting
Track record: City of Jacksonville approved 448 of 465 planned developments decided since 2021 (96%).
From govmeet.us/app/case/548837, November 22, 2026
The line on the agenda
AMENDMENT: 1. A ten (10) foot wide landscape buffer shall be installed and maintained on three sides of the existing cell tower. The landscape buffer shall contain a row of evergreen shade trees a minimum of 15 feet tall (at the time of planting) with a four-inch caliper, shrubs such as viburnum, ligustrum, holly or juniper, a minimum of spaced a maximum of 15 feet apart; and a row of evergreen four (4) feet tall (at the time of planting) and potted in seven- gallon containers, planted four (4) feet on center, in order to maintain 80% opacity within one year of planting. 2. Unless waived by the Chief of Traffic Engineering or their designee, a traffic study shall be undertaken by the developer upon PUD verification and provided during the 10-set review. The methodology of the study shall be determined by the developer’s Traffic Engineer, the Chief of the Transportation Planning (or their designee), and the Chief of Traffic Engineering (or their designee).
Land Use & Zoning Committee, November 4, 2026. Agenda, p. 11 · Minutes · Recording · Meeting page.
The record
What the filing states, field by field.
15 more fields not read from the filing yet
Case numbers, request, zoning, acres, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Nov 4
Land Use & Zoning Committee